&wP*!)
May 11th, 2008, 11:31 PM
Hi,
I am an Ubuntu user since 6.10 Edgy Eft. I recently installed 8.04 Hardy Heron, tried to burn a 16x DVD+R on a new SATA DVD Writer, LG GH20NS10. It did not go. To see, whether it has to do with the operating system itself, I have downloaded Mandriva 2008 Spring and installed it.
I have run K3B and I still get the same error. Please see the attached file to see K3B error window.
This DVD+R can be burned with this SATA DVD Writer without any problem on Windows XP.
System
-----------------------
K3b Version: 1.0.4
KDE Version: 3.5.9
QT Version: 3.3.8b
Kernel: 2.6.24.4-desktop-1mnb
Devices
-----------------------
HL-DT-ST DVDRAM GH20NS10 EL00 (/dev/sr0, ) [CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R, DVD-RW, DVD-R DL, DVD+R, DVD+RW, DVD+R DL] [DVD-ROM, DVD-R Sequential, DVD-R Dual Layer Sequential, DVD-R Dual Layer Jump, DVD-RAM, DVD-RW Restricted Overwrite, DVD-RW Sequential, DVD+RW, DVD+R, DVD+R Dual Layer, CD-ROM, CD-R, CD-RW] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R, Restricted Overwrite, Layer Jump]
SAMSUNG CDRW/DVD SM-352B T809 (/dev/hdc, ) [CD-R, CD-RW, CD-ROM, DVD-ROM] [DVD-ROM, CD-ROM, CD-R, CD-RW] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R]
Burned media
-----------------------
DVD+R
K3bIsoImager
-----------------------
mkisofs print size result: 1937608 (3968221184 bytes)
Pipe throughput: 1655496704 bytes read, 1655476224 bytes written.
Used versions
-----------------------
mkisofs: 1.1.7.1
growisofs: 7.0
growisofs
-----------------------
Executing 'builtin_dd if=/dev/fd/0 of=/dev/sr0 obs=32k seek=0'
/dev/sr0: "Current Write Speed" is 16.4x1352KBps.
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
1114112/3968221184 ( 0.0%) @0.2x, remaining 1483:39 RBU 100.0% UBU 2.9%
25788416/3968221184 ( 0.6%) @5.3x, remaining 71:20 RBU 100.0% UBU 100.0%
59146240/3968221184 ( 1.5%) @7.2x, remaining 35:14 RBU 100.0% UBU 100.0%
93093888/3968221184 ( 2.3%) @7.4x, remaining 24:16 RBU 100.0% UBU 100.0%
127565824/3968221184 ( 3.2%) @7.5x, remaining 19:04 RBU 100.0% UBU 100.0%
162594816/3968221184 ( 4.1%) @7.6x, remaining 16:23 RBU 100.0% UBU 100.0%
198180864/3968221184 ( 5.0%) @7.7x, remaining 14:16 RBU 100.0% UBU 100.0%
234323968/3968221184 ( 5.9%) @7.8x, remaining 12:44 RBU 100.0% UBU 100.0%
270991360/3968221184 ( 6.8%) @7.9x, remaining 11:49 RBU 100.0% UBU 100.0%
304250880/3968221184 ( 7.7%) @7.2x, remaining 11:02 RBU 100.0% UBU 100.0%
341999616/3968221184 ( 8.6%) @8.2x, remaining 10:14 RBU 100.0% UBU 100.0%
380272640/3968221184 ( 9.6%) @8.3x, remaining 9:44 RBU 100.0% UBU 100.0%
419135488/3968221184 (10.6%) @8.4x, remaining 9:10 RBU 100.0% UBU 100.0%
458522624/3968221184 (11.6%) @8.5x, remaining 8:40 RBU 100.0% UBU 97.1%
498466816/3968221184 (12.6%) @8.7x, remaining 8:21 RBU 100.0% UBU 100.0%
538935296/3968221184 (13.6%) @8.8x, remaining 7:57 RBU 100.0% UBU 100.0%
579993600/3968221184 (14.6%) @8.9x, remaining 7:35 RBU 100.0% UBU 97.1%
621576192/3968221184 (15.7%) @9.0x, remaining 7:21 RBU 100.0% UBU 97.1%
663748608/3968221184 (16.7%) @9.1x, remaining 7:03 RBU 100.0% UBU 97.1%
706445312/3968221184 (17.8%) @9.3x, remaining 6:46 RBU 100.0% UBU 100.0%
749699072/3968221184 (18.9%) @9.4x, remaining 6:34 RBU 100.0% UBU 100.0%
793509888/3968221184 (20.0%) @9.5x, remaining 6:20 RBU 100.0% UBU 100.0%
837877760/3968221184 (21.1%) @9.6x, remaining 6:06 RBU 100.0% UBU 100.0%
882769920/3968221184 (22.2%) @9.7x, remaining 5:56 RBU 100.0% UBU 100.0%
928251904/3968221184 (23.4%) @9.9x, remaining 5:43 RBU 100.0% UBU 100.0%
974258176/3968221184 (24.6%) @10.0x, remaining 5:31 RBU 100.0% UBU 100.0%
1015971840/3968221184 (25.6%) @9.0x, remaining 5:25 RBU 100.0% UBU 97.1%
1063026688/3968221184 (26.8%) @10.2x, remaining 5:14 RBU 100.0% UBU 100.0%
1110638592/3968221184 (28.0%) @10.3x, remaining 5:03 RBU 100.0% UBU 100.0%
1158807552/3968221184 (29.2%) @10.4x, remaining 4:55 RBU 100.0% UBU 97.1%
1207533568/3968221184 (30.4%) @10.6x, remaining 4:45 RBU 100.0% UBU 100.0%
1256816640/3968221184 (31.7%) @10.7x, remaining 4:36 RBU 100.0% UBU 97.1%
1306656768/3968221184 (32.9%) @10.8x, remaining 4:28 RBU 99.9% UBU 100.0%
1357053952/3968221184 (34.2%) @10.9x, remaining 4:19 RBU 100.0% UBU 100.0%
1407975424/3968221184 (35.5%) @11.0x, remaining 4:10 RBU 100.0% UBU 100.0%
1459453952/3968221184 (36.8%) @11.2x, remaining 4:04 RBU 100.0% UBU 100.0%
1511489536/3968221184 (38.1%) @11.3x, remaining 3:55 RBU 100.0% UBU 100.0%
1564082176/3968221184 (39.4%) @11.4x, remaining 3:47 RBU 98.6% UBU 100.0%
1617231872/3968221184 (40.8%) @11.5x, remaining 3:40 RBU 99.0% UBU 100.0%
1621819392/3968221184 (40.9%) @1.0x, remaining 3:44 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 3:48 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 3:54 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 3:58 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:03 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:08 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:13 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:17 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:23 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:27 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:31 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:37 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:42 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:46 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:52 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:56 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 5:00 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 5:06 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 5:11 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 5:15 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 5:21 RBU 100.0% UBU 100.0%
:-[ WRITE@LBA=c1560h failed with SK=0h/ASC=00h/ACQ=02h]: Input/output error
:-( write failed: Input/output error
/dev/sr0: flushing cache
/dev/sr0: closing track
/dev/sr0: closing session
growisofs command:
-----------------------
/usr/bin/growisofs -Z /dev/sr0=/dev/fd/0 -use-the-force-luke=notray -use-the-force-luke=tty -use-the-force-luke=tracksize:1937608 -speed=16 -use-the-force-luke=bufsize:32m
mkisofs
-----------------------
1937608
I: -input-charset not specified, using utf-8 (detected in locale settings)
Using ... (some filenames which I don't want to show to public)
0.08% done, estimate finish Sun May 11 23:46:49 2008
0.10% done, estimate finish Mon May 12 00:02:53 2008
0.13% done, estimate finish Sun May 11 23:59:43 2008
0.16% done, estimate finish Sun May 11 23:57:33 2008
0.18% done, estimate finish Sun May 11 23:56:01 2008
0.21% done, estimate finish Sun May 11 23:54:52 2008
0.23% done, estimate finish Sun May 11 23:53:58 2008
0.26% done, estimate finish Sun May 11 23:53:15 2008
0.28% done, estimate finish Sun May 11 23:52:40 2008
0.31% done, estimate finish Sun May 11 23:52:11 2008
0.34% done, estimate finish Sun May 11 23:51:46 2008
0.36% done, estimate finish Sun May 11 23:51:25 2008
0.39% done, estimate finish Sun May 11 23:55:25 2008
0.41% done, estimate finish Sun May 11 23:54:53 2008
0.44% done, estimate finish Sun May 11 23:54:24 2008
0.46% done, estimate finish Sun May 11 23:53:59 2008
0.49% done, estimate finish Sun May 11 23:53:36 2008
0.52% done, estimate finish Sun May 11 23:53:16 2008
0.54% done, estimate finish Sun May 11 23:52:57 2008
0.57% done, estimate finish Sun May 11 23:52:40 2008
0.59% done, estimate finish Sun May 11 23:52:25 2008
0.62% done, estimate finish Sun May 11 23:52:11 2008
0.65% done, estimate finish Sun May 11 23:51:58 2008
0.67% done, estimate finish Sun May 11 23:51:47 2008
0.70% done, estimate finish Sun May 11 23:51:36 2008
0.72% done, estimate finish Sun May 11 23:51:25 2008
0.75% done, estimate finish Sun May 11 23:51:16 2008
0.77% done, estimate finish Sun May 11 23:51:07 2008
0.80% done, estimate finish Sun May 11 23:50:58 2008
0.83% done, estimate finish Sun May 11 23:50:51 2008
0.85% done, estimate finish Mon May 12 00:33:46 2008
0.88% done, estimate finish Mon May 12 00:32:22 2008
0.90% done, estimate finish Mon May 12 00:38:27 2008
0.93% done, estimate finish Mon May 12 00:37:01 2008
0.95% done, estimate finish Mon May 12 00:35:41 2008
0.98% done, estimate finish Mon May 12 00:34:22 2008
1.01% done, estimate finish Mon May 12 00:33:09 2008
1.03% done, estimate finish Mon May 12 00:32:00 2008
1.06% done, estimate finish Mon May 12 00:30:55 2008
1.08% done, estimate finish Mon May 12 00:31:22 2008
1.11% done, estimate finish Mon May 12 00:30:21 2008
1.14% done, estimate finish Mon May 12 00:29:22 2008
1.16% done, estimate finish Mon May 12 00:28:25 2008
1.19% done, estimate finish Mon May 12 00:27:31 2008
1.21% done, estimate finish Mon May 12 00:26:38 2008
1.24% done, estimate finish Mon May 12 00:25:49 2008
1.26% done, estimate finish Mon May 12 00:25:01 2008
1.29% done, estimate finish Mon May 12 00:24:16 2008
1.32% done, estimate finish Mon May 12 00:23:31 2008
1.34% done, estimate finish Mon May 12 00:24:03 2008
1.37% done, estimate finish Mon May 12 00:23:22 2008
1.39% done, estimate finish Mon May 12 00:22:41 2008
1.42% done, estimate finish Mon May 12 00:22:01 2008
1.45% done, estimate finish Mon May 12 00:21:24 2008
1.47% done, estimate finish Mon May 12 00:20:48 2008
1.50% done, estimate finish Mon May 12 00:20:13 2008
1.52% done, estimate finish Mon May 12 00:19:38 2008
1.55% done, estimate finish Mon May 12 00:19:05 2008
1.57% done, estimate finish Mon May 12 00:18:34 2008
1.60% done, estimate finish Mon May 12 00:19:06 2008
1.63% done, estimate finish Mon May 12 00:18:35 2008
1.65% done, estimate finish Mon May 12 00:18:05 2008
1.68% done, estimate finish Mon May 12 00:17:36 2008
1.70% done, estimate finish Mon May 12 00:17:09 2008
1.73% done, estimate finish Mon May 12 00:16:41 2008
1.76% done, estimate finish Mon May 12 00:16:15 2008
1.78% done, estimate finish Mon May 12 00:15:49 2008
1.81% done, estimate finish Mon May 12 00:15:25 2008
1.83% done, estimate finish Mon May 12 00:15:54 2008
1.86% done, estimate finish Mon May 12 00:15:30 2008
1.88% done, estimate finish Mon May 12 00:15:07 2008
1.91% done, estimate finish Mon May 12 00:14:44 2008
1.94% done, estimate finish Mon May 12 00:14:21 2008
1.96% done, estimate finish Mon May 12 00:14:00 2008
1.99% done, estimate finish Mon May 12 00:13:39 2008
2.01% done, estimate finish Mon May 12 00:13:18 2008
2.04% done, estimate finish Mon May 12 00:12:58 2008
2.06% done, estimate finish Mon May 12 00:12:38 2008
2.09% done, estimate finish Mon May 12 00:13:07 2008
2.12% done, estimate finish Mon May 12 00:12:48 2008
2.14% done, estimate finish Mon May 12 00:12:29 2008
2.17% done, estimate finish Mon May 12 00:12:11 2008
2.19% done, estimate finish Mon May 12 00:11:53 2008
2.22% done, estimate finish Mon May 12 00:11:35 2008
2.25% done, estimate finish Mon May 12 00:11:18 2008
2.27% done, estimate finish Mon May 12 00:11:01 2008
2.30% done, estimate finish Mon May 12 00:10:45 2008
2.32% done, estimate finish Mon May 12 00:10:29 2008
2.35% done, estimate finish Mon May 12 00:10:56 2008
2.37% done, estimate finish Mon May 12 00:10:40 2008
2.40% done, estimate finish Mon May 12 00:10:25 2008
2.43% done, estimate finish Mon May 12 00:10:10 2008
2.45% done, estimate finish Mon May 12 00:09:55 2008
2.48% done, estimate finish Mon May 12 00:09:41 2008
2.50% done, estimate finish Mon May 12 00:09:27 2008
2.53% done, estimate finish Mon May 12 00:09:13 2008
2.56% done, estimate finish Mon May 12 00:08:59 2008
2.58% done, estimate finish Mon May 12 00:08:46 2008
2.61% done, estimate finish Mon May 12 00:09:11 2008
2.63% done, estimate finish Mon May 12 00:08:58 2008
2.66% done, estimate finish Mon May 12 00:08:45 2008
2.68% done, estimate finish Mon May 12 00:08:32 2008
2.71% done, estimate finish Mon May 12 00:08:20 2008
2.74% done, estimate finish Mon May 12 00:08:08 2008
2.76% done, estimate finish Mon May 12 00:07:56 2008
2.79% done, estimate finish Mon May 12 00:07:44 2008
2.81% done, estimate finish Mon May 12 00:07:33 2008
2.84% done, estimate finish Mon May 12 00:07:21 2008
2.87% done, estimate finish Mon May 12 00:07:45 2008
2.89% done, estimate finish Mon May 12 00:07:34 2008
2.92% done, estimate finish Mon May 12 00:07:23 2008
2.94% done, estimate finish Mon May 12 00:07:12 2008
2.97% done, estimate finish Mon May 12 00:07:01 2008
2.99% done, estimate finish Mon May 12 00:06:51 2008
3.02% done, estimate finish Mon May 12 00:06:41 2008
3.05% done, estimate finish Mon May 12 00:06:31 2008
3.07% done, estimate finish Mon May 12 00:06:21 2008
3.10% done, estimate finish Mon May 12 00:06:11 2008
3.12% done, estimate finish Mon May 12 00:06:33 2008
3.15% done, estimate finish Mon May 12 00:06:24 2008
3.17% done, estimate finish Mon May 12 00:06:14 2008
3.20% done, estimate finish Mon May 12 00:06:05 2008
3.23% done, estimate finish Mon May 12 00:05:56 2008
3.25% done, estimate finish Mon May 12 00:05:46 2008
3.28% done, estimate finish Mon May 12 00:05:37 2008
3.30% done, estimate finish Mon May 12 00:05:29 2008
3.33% done, estimate finish Mon May 12 00:05:20 2008
3.36% done, estimate finish Mon May 12 00:05:11 2008
3.38% done, estimate finish Mon May 12 00:05:32 2008
3.41% done, estimate finish Mon May 12 00:05:24 2008
3.43% done, estimate finish Mon May 12 00:05:16 2008
3.46% done, estimate finish Mon May 12 00:05:07 2008
3.48% done, estimate finish Mon May 12 00:04:59 2008
3.51% done, estimate finish Mon May 12 00:04:51 2008
3.54% done, estimate finish Mon May 12 00:04:43 2008
3.56% done, estimate finish Mon May 12 00:04:35 2008
3.59% done, estimate finish Mon May 12 00:04:28 2008
3.61% done, estimate finish Mon May 12 00:04:20 2008
3.64% done, estimate finish Mon May 12 00:04:40 2008
3.66% done, estimate finish Mon May 12 00:04:33 2008
3.69% done, estimate finish Mon May 12 00:04:25 2008
3.72% done, estimate finish Mon May 12 00:04:18 2008
3.74% done, estimate finish Mon May 12 00:04:11 2008
3.77% done, estimate finish Mon May 12 00:04:03 2008
3.79% done, estimate finish Mon May 12 00:03:56 2008
3.82% done, estimate finish Mon May 12 00:03:50 2008
3.84% done, estimate finish Mon May 12 00:03:43 2008
3.87% done, estimate finish Mon May 12 00:03:36 2008
3.90% done, estimate finish Mon May 12 00:03:55 2008
3.92% done, estimate finish Mon May 12 00:03:48 2008
3.95% done, estimate finish Mon May 12 00:03:42 2008
3.97% done, estimate finish Mon May 12 00:03:35 2008
4.00% done, estimate finish Mon May 12 00:03:28 2008
4.03% done, estimate finish Mon May 12 00:03:22 2008
4.05% done, estimate finish Mon May 12 00:03:16 2008
4.08% done, estimate finish Mon May 12 00:03:09 2008
4.10% done, estimate finish Mon May 12 00:03:03 2008
4.13% done, estimate finish Mon May 12 00:02:57 2008
4.15% done, estimate finish Mon May 12 00:03:15 2008
4.18% done, estimate finish Mon May 12 00:03:09 2008
4.21% done, estimate finish Mon May 12 00:03:03 2008
4.23% done, estimate finish Mon May 12 00:02:57 2008
4.26% done, estimate finish Mon May 12 00:02:51 2008
4.28% done, estimate finish Mon May 12 00:02:45 2008
4.31% done, estimate finish Mon May 12 00:02:40 2008
4.34% done, estimate finish Mon May 12 00:02:34 2008
4.36% done, estimate finish Mon May 12 00:02:29 2008
4.39% done, estimate finish Mon May 12 00:02:23 2008
4.41% done, estimate finish Mon May 12 00:02:40 2008
4.44% done, estimate finish Mon May 12 00:02:35 2008
4.46% done, estimate finish Mon May 12 00:02:29 2008
4.49% done, estimate finish Mon May 12 00:02:24 2008
4.52% done, estimate finish Mon May 12 00:02:18 2008
4.54% done, estimate finish Mon May 12 00:02:13 2008
4.57% done, estimate finish Mon May 12 00:02:08 2008
4.59% done, estimate finish Mon May 12 00:02:03 2008
4.62% done, estimate finish Mon May 12 00:01:58 2008
4.65% done, estimate finish Mon May 12 00:01:53 2008
4.67% done, estimate finish Mon May 12 00:01:48 2008
4.70% done, estimate finish Mon May 12 00:02:04 2008
4.72% done, estimate finish Mon May 12 00:01:59 2008
4.75% done, estimate finish Mon May 12 00:01:54 2008
4.77% done, estimate finish Mon May 12 00:01:49 2008
4.80% done, estimate finish Mon May 12 00:01:44 2008
4.83% done, estimate finish Mon May 12 00:01:40 2008
4.85% done, estimate finish Mon May 12 00:01:35 2008
4.88% done, estimate finish Mon May 12 00:01:30 2008
4.90% done, estimate finish Mon May 12 00:01:25 2008
4.93% done, estimate finish Mon May 12 00:01:21 2008
4.95% done, estimate finish Mon May 12 00:01:37 2008
4.98% done, estimate finish Mon May 12 00:01:32 2008
5.01% done, estimate finish Mon May 12 00:01:27 2008
5.03% done, estimate finish Mon May 12 00:01:23 2008
5.06% done, estimate finish Mon May 12 00:01:18 2008
5.08% done, estimate finish Mon May 12 00:01:14 2008
5.11% done, estimate finish Mon May 12 00:01:10 2008
5.14% done, estimate finish Mon May 12 00:01:05 2008
5.16% done, estimate finish Mon May 12 00:01:01 2008
5.19% done, estimate finish Mon May 12 00:00:57 2008
5.21% done, estimate finish Mon May 12 00:01:12 2008
5.24% done, estimate finish Mon May 12 00:01:07 2008
5.26% done, estimate finish Mon May 12 00:01:03 2008
5.29% done, estimate finish Mon May 12 00:00:59 2008
5.32% done, estimate finish Mon May 12 00:00:55 2008
5.34% done, estimate finish Mon May 12 00:00:51 2008
5.37% done, estimate finish Mon May 12 00:00:47 2008
5.39% done, estimate finish Mon May 12 00:00:43 2008
5.42% done, estimate finish Mon May 12 00:00:39 2008
5.45% done, estimate finish Mon May 12 00:00:35 2008
5.47% done, estimate finish Mon May 12 00:00:31 2008
5.50% done, estimate finish Mon May 12 00:00:45 2008
5.52% done, estimate finish Mon May 12 00:00:41 2008
5.55% done, estimate finish Mon May 12 00:00:38 2008
5.57% done, estimate finish Mon May 12 00:00:34 2008
5.60% done, estimate finish Mon May 12 00:00:30 2008
5.63% done, estimate finish Mon May 12 00:00:26 2008
5.65% done, estimate finish Mon May 12 00:00:22 2008
5.68% done, estimate finish Mon May 12 00:00:19 2008
5.70% done, estimate finish Mon May 12 00:00:15 2008
5.73% done, estimate finish Mon May 12 00:00:11 2008
5.75% done, estimate finish Mon May 12 00:00:25 2008
5.78% done, estimate finish Mon May 12 00:00:22 2008
5.81% done, estimate finish Mon May 12 00:00:18 2008
5.83% done, estimate finish Mon May 12 00:00:14 2008
5.86% done, estimate finish Mon May 12 00:00:11 2008
5.88% done, estimate finish Mon May 12 00:00:07 2008
5.91% done, estimate finish Mon May 12 00:00:04 2008
5.94% done, estimate finish Mon May 12 00:00:00 2008
5.96% done, estimate finish Sun May 11 23:59:57 2008
5.99% done, estimate finish Sun May 11 23:59:54 2008
6.01% done, estimate finish Sun May 11 23:59:50 2008
6.04% done, estimate finish Mon May 12 00:00:03 2008
6.06% done, estimate finish Mon May 12 00:00:00 2008
6.09% done, estimate finish Sun May 11 23:59:57 2008
6.12% done, estimate finish Sun May 11 23:59:53 2008
6.14% done, estimate finish Sun May 11 23:59:50 2008
6.17% done, estimate finish Sun May 11 23:59:47 2008
6.19% done, estimate finish Sun May 11 23:59:44 2008
6.22% done, estimate finish Sun May 11 23:59:40 2008
6.25% done, estimate finish Sun May 11 23:59:37 2008
6.27% done, estimate finish Sun May 11 23:59:34 2008
6.30% done, estimate finish Sun May 11 23:59:47 2008
6.32% done, estimate finish Sun May 11 23:59:44 2008
6.35% done, estimate finish Sun May 11 23:59:40 2008
6.37% done, estimate finish Sun May 11 23:59:37 2008
6.40% done, estimate finish Sun May 11 23:59:34 2008
6.43% done, estimate finish Sun May 11 23:59:31 2008
6.45% done, estimate finish Sun May 11 23:59:28 2008
6.48% done, estimate finish Sun May 11 23:59:25 2008
6.50% done, estimate finish Sun May 11 23:59:22 2008
6.53% done, estimate finish Sun May 11 23:59:19 2008
6.56% done, estimate finish Sun May 11 23:59:16 2008
6.58% done, estimate finish Sun May 11 23:59:28 2008
6.61% done, estimate finish Sun May 11 23:59:25 2008
6.63% done, estimate finish Sun May 11 23:59:22 2008
6.66% done, estimate finish Sun May 11 23:59:19 2008
6.68% done, estimate finish Sun May 11 23:59:17 2008
6.71% done, estimate finish Sun May 11 23:59:14 2008
6.74% done, estimate finish Sun May 11 23:59:11 2008
6.76% done, estimate finish Sun May 11 23:59:08 2008
6.79% done, estimate finish Sun May 11 23:59:05 2008
6.81% done, estimate finish Sun May 11 23:59:02 2008
6.84% done, estimate finish Sun May 11 23:59:00 2008
6.86% done, estimate finish Sun May 11 23:59:11 2008
6.89% done, estimate finish Sun May 11 23:59:09 2008
6.92% done, estimate finish Sun May 11 23:59:06 2008
6.94% done, estimate finish Sun May 11 23:59:03 2008
6.97% done, estimate finish Sun May 11 23:59:00 2008
6.99% done, estimate finish Sun May 11 23:58:58 2008
7.02% done, estimate finish Sun May 11 23:58:55 2008
7.04% done, estimate finish Sun May 11 23:58:52 2008
7.07% done, estimate finish Sun May 11 23:58:50 2008
7.10% done, estimate finish Sun May 11 23:58:47 2008
7.12% done, estimate finish Sun May 11 23:58:59 2008
7.15% done, estimate finish Sun May 11 23:58:56 2008
7.17% done, estimate finish Sun May 11 23:58:53 2008
7.20% done, estimate finish Sun May 11 23:58:51 2008
7.23% done, estimate finish Sun May 11 23:58:48 2008
7.25% done, estimate finish Sun May 11 23:58:46 2008
7.28% done, estimate finish Sun May 11 23:58:43 2008
7.30% done, estimate finish Sun May 11 23:58:41 2008
7.33% done, estimate finish Sun May 11 23:58:38 2008
7.35% done, estimate finish Sun May 11 23:58:36 2008
7.38% done, estimate finish Sun May 11 23:58:33 2008
7.41% done, estimate finish Sun May 11 23:58:44 2008
7.43% done, estimate finish Sun May 11 23:58:42 2008
7.46% done, estimate finish Sun May 11 23:58:39 2008
7.48% done, estimate finish Sun May 11 23:58:37 2008
7.51% done, estimate finish Sun May 11 23:58:34 2008
7.54% done, estimate finish Sun May 11 23:58:32 2008
7.56% done, estimate finish Sun May 11 23:58:29 2008
7.59% done, estimate finish Sun May 11 23:58:27 2008
7.61% done, estimate finish Sun May 11 23:58:25 2008
7.64% done, estimate finish Sun May 11 23:58:22 2008
7.66% done, estimate finish Sun May 11 23:58:20 2008
7.69% done, estimate finish Sun May 11 23:58:31 2008
7.72% done, estimate finish Sun May 11 23:58:28 2008
7.74% done, estimate finish Sun May 11 23:58:26 2008
7.77% done, estimate finish Sun May 11 23:58:24 2008
7.79% done, estimate finish Sun May 11 23:58:21 2008
7.82% done, estimate finish Sun May 11 23:58:19 2008
7.84% done, estimate finish Sun May 11 23:58:17 2008
7.87% done, estimate finish Sun May 11 23:58:27 2008
7.90% done, estimate finish Sun May 11 23:58:25 2008
7.92% done, estimate finish Sun May 11 23:58:23 2008
7.95% done, estimate finish Sun May 11 23:58:20 2008
7.97% done, estimate finish Sun May 11 23:58:18 2008
8.00% done, estimate finish Sun May 11 23:58:16 2008
8.03% done, estimate finish Sun May 11 23:58:14 2008
8.05% done, estimate finish Sun May 11 23:58:12 2008
8.08% done, estimate finish Sun May 11 23:58:09 2008
8.10% done, estimate finish Sun May 11 23:58:07 2008
8.13% done, estimate finish Sun May 11 23:58:05 2008
8.15% done, estimate finish Sun May 11 23:58:15 2008
8.18% done, estimate finish Sun May 11 23:58:13 2008
8.21% done, estimate finish Sun May 11 23:58:11 2008
8.23% done, estimate finish Sun May 11 23:58:09 2008
8.26% done, estimate finish Sun May 11 23:58:07 2008
8.28% done, estimate finish Sun May 11 23:58:05 2008
8.31% done, estimate finish Sun May 11 23:58:02 2008
8.34% done, estimate finish Sun May 11 23:58:00 2008
8.36% done, estimate finish Sun May 11 23:57:58 2008
8.39% done, estimate finish Sun May 11 23:57:56 2008
8.41% done, estimate finish Sun May 11 23:57:54 2008
8.44% done, estimate finish Sun May 11 23:58:04 2008
8.46% done, estimate finish Sun May 11 23:58:02 2008
8.49% done, estimate finish Sun May 11 23:58:00 2008
8.52% done, estimate finish Sun May 11 23:57:58 2008
8.54% done, estimate finish Sun May 11 23:57:56 2008
8.57% done, estimate finish Sun May 11 23:57:54 2008
8.59% done, estimate finish Sun May 11 23:57:52 2008
8.62% done, estimate finish Sun May 11 23:57:50 2008
8.65% done, estimate finish Sun May 11 23:57:48 2008
8.67% done, estimate finish Sun May 11 23:57:46 2008
8.70% done, estimate finish Sun May 11 23:57:44 2008
8.72% done, estimate finish Sun May 11 23:57:53 2008
8.75% done, estimate finish Sun May 11 23:57:51 2008
8.77% done, estimate finish Sun May 11 23:57:50 2008
8.80% done, estimate finish Sun May 11 23:57:48 2008
8.83% done, estimate finish Sun May 11 23:57:46 2008
8.85% done, estimate finish Sun May 11 23:57:44 2008
8.88% done, estimate finish Sun May 11 23:57:42 2008
8.90% done, estimate finish Sun May 11 23:57:40 2008
8.93% done, estimate finish Sun May 11 23:57:38 2008
8.95% done, estimate finish Sun May 11 23:57:36 2008
8.98% done, estimate finish Sun May 11 23:57:34 2008
9.01% done, estimate finish Sun May 11 23:57:44 2008
9.03% done, estimate finish Sun May 11 23:57:42 2008
9.06% done, estimate finish Sun May 11 23:57:40 2008
9.08% done, estimate finish Sun May 11 23:57:38 2008
9.11% done, estimate finish Sun May 11 23:57:36 2008
9.14% done, estimate finish Sun May 11 23:57:34 2008
9.16% done, estimate finish Sun May 11 23:57:33 2008
9.19% done, estimate finish Sun May 11 23:57:31 2008
9.21% done, estimate finish Sun May 11 23:57:29 2008
9.24% done, estimate finish Sun May 11 23:57:27 2008
9.26% done, estimate finish Sun May 11 23:57:25 2008
9.29% done, estimate finish Sun May 11 23:57:34 2008
9.32% done, estimate finish Sun May 11 23:57:33 2008
9.34% done, estimate finish Sun May 11 23:57:31 2008
9.37% done, estimate finish Sun May 11 23:57:29 2008
9.39% done, estimate finish Sun May 11 23:57:27 2008
9.42% done, estimate finish Sun May 11 23:57:26 2008
9.45% done, estimate finish Sun May 11 23:57:24 2008
9.47% done, estimate finish Sun May 11 23:57:22 2008
9.50% done, estimate finish Sun May 11 23:57:20 2008
9.52% done, estimate finish Sun May 11 23:57:19 2008
9.55% done, estimate finish Sun May 11 23:57:17 2008
9.57% done, estimate finish Sun May 11 23:57:26 2008
9.60% done, estimate finish Sun May 11 23:57:24 2008
9.63% done, estimate finish Sun May 11 23:57:22 2008
9.65% done, estimate finish Sun May 11 23:57:21 2008
9.68% done, estimate finish Sun May 11 23:57:19 2008
9.70% done, estimate finish Sun May 11 23:57:17 2008
9.73% done, estimate finish Sun May 11 23:57:16 2008
9.75% done, estimate finish Sun May 11 23:57:14 2008
9.78% done, estimate finish Sun May 11 23:57:12 2008
9.81% done, estimate finish Sun May 11 23:57:11 2008
9.83% done, estimate finish Sun May 11 23:57:09 2008
9.86% done, estimate finish Sun May 11 23:57:17 2008
9.88% done, estimate finish Sun May 11 23:57:16 2008
9.91% done, estimate finish Sun May 11 23:57:14 2008
9.93% done, estimate finish Sun May 11 23:57:13 2008
9.96% done, estimate finish Sun May 11 23:57:11 2008
9.99% done, estimate finish Sun May 11 23:57:09 2008
10.01% done, estimate finish Sun May 11 23:57:08 2008
10.04% done, estimate finish Sun May 11 23:57:06 2008
10.06% done, estimate finish Sun May 11 23:57:05 2008
10.09% done, estimate finish Sun May 11 23:57:03 2008
10.12% done, estimate finish Sun May 11 23:57:01 2008
10.14% done, estimate finish Sun May 11 23:57:10 2008
10.17% done, estimate finish Sun May 11 23:57:08 2008
10.19% done, estimate finish Sun May 11 23:57:07 2008
10.22% done, estimate finish Sun May 11 23:57:05 2008
10.24% done, estimate finish Sun May 11 23:57:03 2008
10.27% done, estimate finish Sun May 11 23:57:02 2008
10.30% done, estimate finish Sun May 11 23:57:00 2008
10.32% done, estimate finish Sun May 11 23:56:59 2008
10.35% done, estimate finish Sun May 11 23:56:57 2008
10.37% done, estimate finish Sun May 11 23:56:56 2008
10.40% done, estimate finish Sun May 11 23:56:54 2008
10.43% done, estimate finish Sun May 11 23:56:53 2008
10.45% done, estimate finish Sun May 11 23:57:01 2008
10.48% done, estimate finish Sun May 11 23:56:59 2008
10.50% done, estimate finish Sun May 11 23:56:58 2008
10.53% done, estimate finish Sun May 11 23:56:56 2008
10.55% done, estimate finish Sun May 11 23:56:55 2008
10.58% done, estimate finish Sun May 11 23:56:53 2008
10.61% done, estimate finish Sun May 11 23:56:52 2008
10.63% done, estimate finish Sun May 11 23:56:50 2008
10.66% done, estimate finish Sun May 11 23:56:49 2008
10.68% done, estimate finish Sun May 11 23:56:48 2008
10.71% done, estimate finish Sun May 11 23:56:46 2008
10.74% done, estimate finish Sun May 11 23:56:54 2008
10.76% done, estimate finish Sun May 11 23:56:53 2008
10.79% done, estimate finish Sun May 11 23:56:51 2008
10.81% done, estimate finish Sun May 11 23:56:50 2008
10.84% done, estimate finish Sun May 11 23:56:48 2008
10.86% done, estimate finish Sun May 11 23:56:47 2008
10.89% done, estimate finish Sun May 11 23:56:45 2008
10.92% done, estimate finish Sun May 11 23:56:44 2008
10.94% done, estimate finish Sun May 11 23:56:43 2008
10.97% done, estimate finish Sun May 11 23:56:41 2008
10.99% done, estimate finish Sun May 11 23:56:40 2008
11.02% done, estimate finish Sun May 11 23:56:47 2008
11.04% done, estimate finish Sun May 11 23:56:46 2008
11.07% done, estimate finish Sun May 11 23:56:45 2008
11.10% done, estimate finish Sun May 11 23:56:43 2008
11.12% done, estimate finish Sun May 11 23:56:42 2008
11.15% done, estimate finish Sun May 11 23:56:41 2008
11.17% done, estimate finish Sun May 11 23:56:39 2008
11.20% done, estimate finish Sun May 11 23:56:38 2008
11.23% done, estimate finish Sun May 11 23:56:36 2008
11.25% done, estimate finish Sun May 11 23:56:35 2008
11.28% done, estimate finish Sun May 11 23:56:34 2008
11.30% done, estimate finish Sun May 11 23:56:32 2008
11.33% done, estimate finish Sun May 11 23:56:40 2008
11.35% done, estimate finish Sun May 11 23:56:39 2008
11.38% done, estimate finish Sun May 11 23:56:37 2008
11.41% done, estimate finish Sun May 11 23:56:36 2008
11.43% done, estimate finish Sun May 11 23:56:35 2008
11.46% done, estimate finish Sun May 11 23:56:33 2008
11.48% done, estimate finish Sun May 11 23:56:32 2008
11.51% done, estimate finish Sun May 11 23:56:31 2008
11.54% done, estimate finish Sun May 11 23:56:29 2008
11.56% done, estimate finish Sun May 11 23:56:28 2008
11.59% done, estimate finish Sun May 11 23:56:27 2008
11.61% done, estimate finish Sun May 11 23:56:34 2008
11.64% done, estimate finish Sun May 11 23:56:33 2008
11.66% done, estimate finish Sun May 11 23:56:31 2008
11.69% done, estimate finish Sun May 11 23:56:30 2008
11.72% done, estimate finish Sun May 11 23:56:29 2008
11.74% done, estimate finish Sun May 11 23:56:28 2008
11.77% done, estimate finish Sun May 11 23:56:26 2008
11.79% done, estimate finish Sun May 11 23:56:25 2008
11.82% done, estimate finish Sun May 11 23:56:24 2008
11.84% done, estimate finish Sun May 11 23:56:23 2008
11.87% done, estimate finish Sun May 11 23:56:21 2008
11.90% done, estimate finish Sun May 11 23:56:20 2008
11.92% done, estimate finish Sun May 11 23:56:27 2008
11.95% done, estimate finish Sun May 11 23:56:26 2008
11.97% done, estimate finish Sun May 11 23:56:25 2008
12.00% done, estimate finish Sun May 11 23:56:24 2008
12.03% done, estimate finish Sun May 11 23:56:22 2008
12.05% done, estimate finish Sun May 11 23:56:21 2008
12.08% done, estimate finish Sun May 11 23:56:20 2008
12.10% done, estimate finish Sun May 11 23:56:19 2008
12.13% done, estimate finish Sun May 11 23:56:17 2008
12.15% done, estimate finish Sun May 11 23:56:16 2008
12.18% done, estimate finish Sun May 11 23:56:15 2008
12.21% done, estimate finish Sun May 11 23:56:22 2008
12.23% done, estimate finish Sun May 11 23:56:21 2008
12.26% done, estimate finish Sun May 11 23:56:20 2008
12.28% done, estimate finish Sun May 11 23:56:18 2008
12.31% done, estimate finish Sun May 11 23:56:17 2008
12.34% done, estimate finish Sun May 11 23:56:16 2008
12.36% done, estimate finish Sun May 11 23:56:15 2008
12.39% done, estimate finish Sun May 11 23:56:14 2008
12.41% done, estimate finish Sun May 11 23:56:12 2008
12.44% done, estimate finish Sun May 11 23:56:11 2008
12.46% done, estimate finish Sun May 11 23:56:10 2008
12.49% done, estimate finish Sun May 11 23:56:09 2008
12.52% done, estimate finish Sun May 11 23:56:16 2008
12.54% done, estimate finish Sun May 11 23:56:15 2008
12.57% done, estimate finish Sun May 11 23:56:13 2008
12.59% done, estimate finish Sun May 11 23:56:12 2008
12.62% done, estimate finish Sun May 11 23:56:11 2008
12.65% done, estimate finish Sun May 11 23:56:10 2008
12.67% done, estimate finish Sun May 11 23:56:09 2008
12.70% done, estimate finish Sun May 11 23:56:08 2008
12.72% done, estimate finish Sun May 11 23:56:07 2008
12.75% done, estimate finish Sun May 11 23:56:05 2008
12.77% done, estimate finish Sun May 11 23:56:04 2008
12.80% done, estimate finish Sun May 11 23:56:11 2008
12.83% done, estimate finish Sun May 11 23:56:10 2008
12.85% done, estimate finish Sun May 11 23:56:09 2008
12.88% done, estimate finish Sun May 11 23:56:08 2008
12.90% done, estimate finish Sun May 11 23:56:07 2008
12.93% done, estimate finish Sun May 11 23:56:05 2008
12.95% done, estimate finish Sun May 11 23:56:04 2008
12.98% done, estimate finish Sun May 11 23:56:03 2008
13.01% done, estimate finish Sun May 11 23:56:02 2008
13.03% done, estimate finish Sun May 11 23:56:01 2008
13.06% done, estimate finish Sun May 11 23:56:00 2008
13.08% done, estimate finish Sun May 11 23:55:59 2008
13.11% done, estimate finish Sun May 11 23:56:05 2008
13.14% done, estimate finish Sun May 11 23:56:04 2008
13.16% done, estimate finish Sun May 11 23:56:03 2008
13.19% done, estimate finish Sun May 11 23:56:02 2008
13.21% done, estimate finish Sun May 11 23:56:01 2008
13.24% done, estimate finish Sun May 11 23:56:00 2008
13.26% done, estimate finish Sun May 11 23:55:59 2008
13.29% done, estimate finish Sun May 11 23:55:58 2008
13.32% done, estimate finish Sun May 11 23:55:57 2008
13.34% done, estimate finish Sun May 11 23:55:56 2008
13.37% done, estimate finish Sun May 11 23:55:55 2008
13.39% done, estimate finish Sun May 11 23:55:54 2008
13.42% done, estimate finish Sun May 11 23:56:00 2008
13.45% done, estimate finish Sun May 11 23:55:59 2008
13.47% done, estimate finish Sun May 11 23:55:58 2008
13.50% done, estimate finish Sun May 11 23:55:57 2008
13.52% done, estimate finish Sun May 11 23:55:56 2008
13.55% done, estimate finish Sun May 11 23:55:55 2008
13.57% done, estimate finish Sun May 11 23:55:54 2008
13.60% done, estimate finish Sun May 11 23:55:53 2008
13.63% done, estimate finish Sun May 11 23:55:52 2008
13.65% done, estimate finish Sun May 11 23:55:51 2008
13.68% done, estimate finish Sun May 11 23:55:50 2008
13.70% done, estimate finish Sun May 11 23:55:49 2008
13.73% done, estimate finish Sun May 11 23:55:55 2008
13.75% done, estimate finish Sun May 11 23:55:54 2008
13.78% done, estimate finish Sun May 11 23:55:53 2008
13.81% done, estimate finish Sun May 11 23:55:52 2008
13.83% done, estimate finish Sun May 11 23:55:51 2008
13.86% done, estimate finish Sun May 11 23:55:50 2008
13.88% done, estimate finish Sun May 11 23:55:49 2008
13.91% done, estimate finish Sun May 11 23:55:48 2008
13.94% done, estimate finish Sun May 11 23:55:47 2008
13.96% done, estimate finish Sun May 11 23:55:46 2008
13.99% done, estimate finish Sun May 11 23:55:45 2008
14.01% done, estimate finish Sun May 11 23:55:44 2008
14.04% done, estimate finish Sun May 11 23:55:50 2008
14.06% done, estimate finish Sun May 11 23:55:49 2008
14.09% done, estimate finish Sun May 11 23:55:48 2008
14.12% done, estimate finish Sun May 11 23:55:47 2008
14.14% done, estimate finish Sun May 11 23:55:46 2008
14.17% done, estimate finish Sun May 11 23:55:45 2008
14.19% done, estimate finish Sun May 11 23:55:44 2008
14.22% done, estimate finish Sun May 11 23:55:43 2008
14.24% done, estimate finish Sun May 11 23:55:42 2008
14.27% done, estimate finish Sun May 11 23:55:41 2008
14.30% done, estimate finish Sun May 11 23:55:40 2008
14.32% done, estimate finish Sun May 11 23:55:39 2008
14.35% done, estimate finish Sun May 11 23:55:45 2008
14.37% done, estimate finish Sun May 11 23:55:44 2008
14.40% done, estimate finish Sun May 11 23:55:43 2008
14.43% done, estimate finish Sun May 11 23:55:42 2008
14.45% done, estimate finish Sun May 11 23:55:41 2008
14.48% done, estimate finish Sun May 11 23:55:40 2008
14.50% done, estimate finish Sun May 11 23:55:39 2008
14.53% done, estimate finish Sun May 11 23:55:39 2008
14.55% done, estimate finish Sun May 11 23:55:38 2008
14.58% done, estimate finish Sun May 11 23:55:37 2008
14.61% done, estimate finish Sun May 11 23:55:36 2008
14.63% done, estimate finish Sun May 11 23:55:42 2008
14.66% done, estimate finish Sun May 11 23:55:41 2008
14.68% done, estimate finish Sun May 11 23:55:40 2008
14.71% done, estimate finish Sun May 11 23:55:39 2008
14.73% done, estimate finish Sun May 11 23:55:38 2008
14.76% done, estimate finish Sun May 11 23:55:37 2008
14.79% done, estimate finish Sun May 11 23:55:36 2008
14.81% done, estimate finish Sun May 11 23:55:35 2008
14.84% done, estimate finish Sun May 11 23:55:34 2008
14.86% done, estimate finish Sun May 11 23:55:33 2008
14.89% done, estimate finish Sun May 11 23:55:32 2008
14.92% done, estimate finish Sun May 11 23:55:31 2008
14.94% done, estimate finish Sun May 11 23:55:31 2008
14.97% done, estimate finish Sun May 11 23:55:36 2008
14.99% done, estimate finish Sun May 11 23:55:35 2008
15.02% done, estimate finish Sun May 11 23:55:35 2008
15.04% done, estimate finish Sun May 11 23:55:34 2008
15.07% done, estimate finish Sun May 11 23:55:33 2008
15.10% done, estimate finish Sun May 11 23:55:32 2008
15.12% done, estimate finish Sun May 11 23:55:31 2008
15.15% done, estimate finish Sun May 11 23:55:30 2008
15.17% done, estimate finish Sun May 11 23:55:29 2008
15.20% done, estimate finish Sun May 11 23:55:28 2008
15.23% done, estimate finish Sun May 11 23:55:27 2008
15.25% done, estimate finish Sun May 11 23:55:27 2008
15.28% done, estimate finish Sun May 11 23:55:32 2008
15.30% done, estimate finish Sun May 11 23:55:31 2008
15.33% done, estimate finish Sun May 11 23:55:30 2008
15.35% done, estimate finish Sun May 11 23:55:30 2008
15.38% done, estimate finish Sun May 11 23:55:29 2008
15.41% done, estimate finish Sun May 11 23:55:28 2008
15.43% done, estimate finish Sun May 11 23:55:27 2008
15.46% done, estimate finish Sun May 11 23:55:26 2008
15.48% done, estimate finish Sun May 11 23:55:25 2008
15.51% done, estimate finish Sun May 11 23:55:24 2008
15.53% done, estimate finish Sun May 11 23:55:23 2008
15.56% done, estimate finish Sun May 11 23:55:23 2008
15.59% done, estimate finish Sun May 11 23:55:28 2008
15.61% done, estimate finish Sun May 11 23:55:27 2008
15.64% done, estimate finish Sun May 11 23:55:26 2008
15.66% done, estimate finish Sun May 11 23:55:26 2008
15.69% done, estimate finish Sun May 11 23:55:25 2008
15.72% done, estimate finish Sun May 11 23:55:24 2008
15.74% done, estimate finish Sun May 11 23:55:23 2008
15.77% done, estimate finish Sun May 11 23:55:22 2008
15.79% done, estimate finish Sun May 11 23:55:21 2008
15.82% done, estimate finish Sun May 11 23:55:21 2008
15.84% done, estimate finish Sun May 11 23:55:20 2008
15.87% done, estimate finish Sun May 11 23:55:19 2008
15.90% done, estimate finish Sun May 11 23:55:24 2008
15.92% done, estimate finish Sun May 11 23:55:24 2008
15.95% done, estimate finish Sun May 11 23:55:23 2008
15.97% done, estimate finish Sun May 11 23:55:22 2008
16.00% done, estimate finish Sun May 11 23:55:21 2008
16.03% done, estimate finish Sun May 11 23:55:20 2008
16.05% done, estimate finish Sun May 11 23:55:19 2008
16.08% done, estimate finish Sun May 11 23:55:19 2008
16.10% done, estimate finish Sun May 11 23:55:18 2008
16.13% done, estimate finish Sun May 11 23:55:17 2008
16.15% done, estimate finish Sun May 11 23:55:16 2008
16.18% done, estimate finish Sun May 11 23:55:15 2008
16.21% done, estimate finish Sun May 11 23:55:21 2008
16.23% done, estimate finish Sun May 11 23:55:20 2008
16.26% done, estimate finish Sun May 11 23:55:19 2008
16.28% done, estimate finish Sun May 11 23:55:18 2008
16.31% done, estimate finish Sun May 11 23:55:17 2008
16.33% done, estimate finish Sun May 11 23:55:17 2008
16.36% done, estimate finish Sun May 11 23:55:16 2008
16.39% done, estimate finish Sun May 11 23:55:15 2008
16.41% done, estimate finish Sun May 11 23:55:14 2008
16.44% done, estimate finish Sun May 11 23:55:13 2008
16.46% done, estimate finish Sun May 11 23:55:13 2008
16.49% done, estimate finish Sun May 11 23:55:12 2008
16.52% done, estimate finish Sun May 11 23:55:17 2008
16.54% done, estimate finish Sun May 11 23:55:16 2008
16.57% done, estimate finish Sun May 11 23:55:16 2008
16.59% done, estimate finish Sun May 11 23:55:15 2008
16.62% done, estimate finish Sun May 11 23:55:14 2008
16.64% done, estimate finish Sun May 11 23:55:13 2008
16.67% done, estimate finish Sun May 11 23:55:12 2008
16.70% done, estimate finish Sun May 11 23:55:12 2008
16.72% done, estimate finish Sun May 11 23:55:11 2008
16.75% done, estimate finish Sun May 11 23:55:10 2008
16.77% done, estimate finish Sun May 11 23:55:09 2008
16.80% done, estimate finish Sun May 11 23:55:09 2008
16.83% done, estimate finish Sun May 11 23:55:14 2008
16.85% done, estimate finish Sun May 11 23:55:13 2008
16.88% done, estimate finish Sun May 11 23:55:12 2008
16.90% done, estimate finish Sun May 11 23:55:11 2008
16.93% done, estimate finish Sun May 11 23:55:11 2008
16.95% done, estimate finish Sun May 11 23:55:10 2008
16.98% done, estimate finish Sun May 11 23:55:09 2008
17.01% done, estimate finish Sun May 11 23:55:08 2008
17.03% done, estimate finish Sun May 11 23:55:08 2008
17.06% done, estimate finish Sun May 11 23:55:07 2008
17.08% done, estimate finish Sun May 11 23:55:06 2008
17.11% done, estimate finish Sun May 11 23:55:05 2008
17.14% done, estimate finish Sun May 11 23:55:05 2008
17.16% done, estimate finish Sun May 11 23:55:10 2008
17.19% done, estimate finish Sun May 11 23:55:09 2008
17.21% done, estimate finish Sun May 11 23:55:08 2008
17.24% done, estimate finish Sun May 11 23:55:07 2008
17.26% done, estimate finish Sun May 11 23:55:07 2008
17.29% done, estimate finish Sun May 11 23:55:06 2008
17.32% done, estimate finish Sun May 11 23:55:05 2008
17.34% done, estimate finish Sun May 11 23:55:04 2008
17.37% done, estimate finish Sun May 11 23:55:04 2008
17.39% done, estimate finish Sun May 11 23:55:03 2008
17.42% done, estimate finish Sun May 11 23:55:02 2008
17.44% done, estimate finish Sun May 11 23:55:01 2008
17.47% done, estimate finish Sun May 11 23:55:06 2008
17.50% done, estimate finish Sun May 11 23:55:06 2008
17.52% done, estimate finish Sun May 11 23:55:05 2008
17.55% done, estimate finish Sun May 11 23:55:04 2008
17.57% done, estimate finish Sun May 11 23:55:04 2008
17.60% done, estimate finish Sun May 11 23:55:03 2008
17.62% done, estimate finish Sun May 11 23:55:02 2008
17.65% done, estimate finish Sun May 11 23:55:01 2008
17.68% done, estimate finish Sun May 11 23:55:01 2008
17.70% done, estimate finish Sun May 11 23:55:00 2008
17.73% done, estimate finish Sun May 11 23:54:59 2008
17.75% done, estimate finish Sun May 11 23:54:59 2008
17.78% done, estimate finish Sun May 11 23:54:58 2008
17.81% done, estimate finish Sun May 11 23:55:03 2008
17.83% done, estimate finish Sun May 11 23:55:02 2008
17.86% done, estimate finish Sun May 11 23:55:01 2008
17.88% done, estimate finish Sun May 11 23:55:01 2008
17.91% done, estimate finish Sun May 11 23:55:00 2008
17.93% done, estimate finish Sun May 11 23:54:59 2008
17.96% done, estimate finish Sun May 11 23:54:58 2008
17.99% done, estimate finish Sun May 11 23:54:58 2008
18.01% done, estimate finish Sun May 11 23:54:57 2008
18.04% done, estimate finish Sun May 11 23:54:56 2008
18.06% done, estimate finish Sun May 11 23:54:56 2008
18.09% done, estimate finish Sun May 11 23:54:55 2008
18.12% done, estimate finish Sun May 11 23:55:00 2008
18.14% done, estimate finish Sun May 11 23:54:59 2008
18.17% done, estimate finish Sun May 11 23:54:58 2008
18.19% done, estimate finish Sun May 11 23:54:58 2008
18.22% done, estimate finish Sun May 11 23:54:57 2008
18.24% done, estimate finish Sun May 11 23:54:56 2008
18.27% done, estimate finish Sun May 11 23:54:56 2008
18.30% done, estimate finish Sun May 11 23:54:55 2008
18.32% done, estimate finish Sun May 11 23:54:54 2008
18.35% done, estimate finish Sun May 11 23:54:54 2008
18.37% done, estimate finish Sun May 11 23:54:53 2008
18.40% done, estimate finish Sun May 11 23:54:52 2008
18.42% done, estimate finish Sun May 11 23:54:52 2008
18.45% done, estimate finish Sun May 11 23:54:56 2008
18.48% done, estimate finish Sun May 11 23:54:56 2008
18.50% done, estimate finish Sun May 11 23:54:55 2008
18.53% done, estimate finish Sun May 11 23:54:54 2008
18.55% done, estimate finish Sun May 11 23:54:54 2008
18.58% done, estimate finish Sun May 11 23:54:53 2008
18.61% done, estimate finish Sun May 11 23:54:52 2008
18.63% done, estimate finish Sun May 11 23:54:52 2008
18.66% done, estimate finish Sun May 11 23:54:51 2008
18.68% done, estimate finish Sun May 11 23:54:50 2008
18.71% done, estimate finish Sun May 11 23:54:50 2008
18.74% done, estimate finish Sun May 11 23:54:49 2008
18.76% done, estimate finish Sun May 11 23:54:54 2008
18.79% done, estimate finish Sun May 11 23:54:53 2008
18.81% done, estimate finish Sun May 11 23:54:52 2008
18.84% done, estimate finish Sun May 11 23:54:52 2008
18.86% done, estimate finish Sun May 11 23:54:51 2008
18.89% done, estimate finish Sun May 11 23:54:50 2008
18.92% done, estimate finish Sun May 11 23:54:50 2008
18.94% done, estimate finish Sun May 11 23:54:49 2008
18.97% done, estimate finish Sun May 11 23:54:48 2008
18.99% done, estimate finish Sun May 11 23:54:48 2008
19.02% done, estimate finish Sun May 11 23:54:47 2008
19.04% done, estimate finish Sun May 11 23:54:46 2008
19.07% done, estimate finish Sun May 11 23:54:46 2008
19.10% done, estimate finish Sun May 11 23:54:50 2008
19.12% done, estimate finish Sun May 11 23:54:50 2008
19.15% done, estimate finish Sun May 11 23:54:49 2008
19.17% done, estimate finish Sun May 11 23:54:48 2008
19.20% done, estimate finish Sun May 11 23:54:48 2008
19.22% done, estimate finish Sun May 11 23:54:47 2008
19.25% done, estimate finish Sun May 11 23:54:46 2008
19.28% done, estimate finish Sun May 11 23:54:46 2008
19.30% done, estimate finish Sun May 11 23:54:45 2008
19.33% done, estimate finish Sun May 11 23:54:44 2008
19.35% done, estimate finish Sun May 11 23:54:44 2008
19.38% done, estimate finish Sun May 11 23:54:43 2008
19.41% done, estimate finish Sun May 11 23:54:43 2008
19.43% done, estimate finish Sun May 11 23:54:47 2008
19.46% done, estimate finish Sun May 11 23:54:46 2008
19.48% done, estimate finish Sun May 11 23:54:46 2008
19.51% done, estimate finish Sun May 11 23:54:45 2008
19.53% done, estimate finish Sun May 11 23:54:45 2008
19.56% done, estimate finish Sun May 11 23:54:44 2008
19.59% done, estimate finish Sun May 11 23:54:43 2008
19.61% done, estimate finish Sun May 11 23:54:43 2008
19.64% done, estimate finish Sun May 11 23:54:42 2008
19.66% done, estimate finish Sun May 11 23:54:41 2008
19.69% done, estimate finish Sun May 11 23:54:41 2008
19.72% done, estimate finish Sun May 11 23:54:40 2008
19.74% done, estimate finish Sun May 11 23:54:45 2008
19.77% done, estimate finish Sun May 11 23:54:44 2008
19.79% done, estimate finish Sun May 11 23:54:43 2008
19.82% done, estimate finish Sun May 11 23:54:43 2008
19.84% done, estimate finish Sun May 11 23:54:42 2008
19.87% done, estimate finish Sun May 11 23:54:42 2008
19.90% done, estimate finish Sun May 11 23:54:41 2008
19.92% done, estimate finish Sun May 11 23:54:40 2008
19.95% done, estimate finish Sun May 11 23:54:40 2008
19.97% done, estimate finish Sun May 11 23:54:39 2008
20.00% done, estimate finish Sun May 11 23:54:39 2008
20.03% done, estimate finish Sun May 11 23:54:38 2008
20.05% done, estimate finish Sun May 11 23:54:37 2008
20.08% done, estimate finish Sun May 11 23:54:42 2008
20.10% done, estimate finish Sun May 11 23:54:41 2008
20.13% done, estimate finish Sun May 11 23:54:40 2008
20.15% done, estimate finish Sun May 11 23:54:40 2008
20.18% done, estimate finish Sun May 11 23:54:39 2008
20.21% done, estimate finish Sun May 11 23:54:39 2008
20.23% done, estimate finish Sun May 11 23:54:38 2008
20.26% done, estimate finish Sun May 11 23:54:37 2008
20.28% done, estimate finish Sun May 11 23:54:37 2008
20.31% done, estimate finish Sun May 11 23:54:36 2008
20.33% done, estimate finish Sun May 11 23:54:36 2008
20.36% done, estimate finish Sun May 11 23:54:35 2008
20.39% done, estimate finish Sun May 11 23:54:35 2008
20.41% done, estimate finish Sun May 11 23:54:39 2008
20.44% done, estimate finish Sun May 11 23:54:38 2008
20.46% done, estimate finish Sun May 11 23:54:38 2008
20.49% done, estimate finish Sun May 11 23:54:37 2008
20.52% done, estimate finish Sun May 11 23:54:36 2008
20.54% done, estimate finish Sun May 11 23:54:36 2008
20.57% done, estimate finish Sun May 11 23:54:35 2008
20.59% done, estimate finish Sun May 11 23:54:35 2008
20.62% done, estimate finish Sun May 11 23:54:34 2008
20.64% done, estimate finish Sun May 11 23:54:34 2008
20.67% done, estimate finish Sun May 11 23:54:33 2008
20.70% done, estimate finish Sun May 11 23:54:32 2008
20.72% done, estimate finish Sun May 11 23:54:32 2008
20.75% done, estimate finish Sun May 11 23:54:36 2008
20.77% done, estimate finish Sun May 11 23:54:35 2008
20.80% done, estimate finish Sun May 11 23:54:35 2008
20.82% done, estimate finish Sun May 11 23:54:34 2008
20.85% done, estimate finish Sun May 11 23:54:34 2008
20.88% done, estimate finish Sun May 11 23:54:33 2008
20.90% done, estimate finish Sun May 11 23:54:33 2008
20.93% done, estimate finish Sun May 11 23:54:32 2008
20.95% done, estimate finish Sun May 11 23:54:31 2008
20.98% done, estimate finish Sun May 11 23:54:31 2008
21.01% done, estimate finish Sun May 11 23:54:30 2008
21.03% done, estimate finish Sun May 11 23:54:30 2008
21.06% done, estimate finish Sun May 11 23:54:29 2008
21.08% done, estimate finish Sun May 11 23:54:33 2008
21.11% done, estimate finish Sun May 11 23:54:33 2008
21.13% done, estimate finish Sun May 11 23:54:32 2008
21.16% done, estimate finish Sun May 11 23:54:32 2008
21.19% done, estimate finish Sun May 11 23:54:31 2008
21.21% done, estimate finish Sun May 11 23:54:31 2008
21.24% done, estimate finish Sun May 11 23:54:30 2008
21.26% done, estimate finish Sun May 11 23:54:29 2008
21.29% done, estimate finish Sun May 11 23:54:29 2008
21.32% done, estimate finish Sun May 11 23:54:28 2008
21.34% done, estimate finish Sun May 11 23:54:28 2008
21.37% done, estimate finish Sun May 11 23:54:27 2008
21.39% done, estimate finish Sun May 11 23:54:27 2008
21.42% done, estimate finish Sun May 11 23:54:31 2008
21.44% done, estimate finish Sun May 11 23:54:30 2008
21.47% done, estimate finish Sun May 11 23:54:30 2008
21.50% done, estimate finish Sun May 11 23:54:29 2008
21.52% done, estimate finish Sun May 11 23:54:28 2008
21.55% done, estimate finish Sun May 11 23:54:28 2008
21.57% done, estimate finish Sun May 11 23:54:27 2008
21.60% done, estimate finish Sun May 11 23:54:27 2008
21.63% done, estimate finish Sun May 11 23:54:26 2008
21.65% done, estimate finish Sun May 11 23:54:26 2008
21.68% done, estimate finish Sun May 11 23:54:25 2008
21.70% done, estimate finish Sun May 11 23:54:25 2008
21.73% done, estimate finish Sun May 11 23:54:24 2008
21.75% done, estimate finish Sun May 11 23:54:28 2008
21.78% done, estimate finish Sun May 11 23:54:28 2008
21.81% done, estimate finish Sun May 11 23:54:27 2008
21.83% done, estimate finish Sun May 11 23:54:27 2008
21.86% done, estimate finish Sun May 11 23:54:26 2008
21.88% done, estimate finish Sun May 11 23:54:25 2008
21.91% done, estimate finish Sun May 11 23:54:25 2008
21.93% done, estimate finish Sun May 11 23:54:24 2008
21.96% done, estimate finish Sun May 11 23:54:24 2008
21.99% done, estimate finish Sun May 11 23:54:23 2008
22.01% done, estimate finish Sun May 11 23:54:23 2008
22.04% done, estimate finish Sun May 11 23:54:22 2008
22.06% done, estimate finish Sun May 11 23:54:22 2008
22.09% done, estimate finish Sun May 11 23:54:26 2008
22.12% done, estimate finish Sun May 11 23:54:25 2008
22.14% done, estimate finish Sun May 11 23:54:25 2008
22.17% done, estimate finish Sun May 11 23:54:24 2008
22.19% done, estimate finish Sun May 11 23:54:24 2008
22.22% done, estimate finish Sun May 11 23:54:23 2008
22.24% done, estimate finish Sun May 11 23:54:23 2008
22.27% done, estimate finish Sun May 11 23:54:22 2008
22.30% done, estimate finish Sun May 11 23:54:22 2008
22.32% done, estimate finish Sun May 11 23:54:21 2008
22.35% done, estimate finish Sun May 11 23:54:20 2008
22.37% done, estimate finish Sun May 11 23:54:20 2008
22.40% done, estimate finish Sun May 11 23:54:19 2008
22.43% done, estimate finish Sun May 11 23:54:23 2008
22.45% done, estimate finish Sun May 11 23:54:23 2008
22.48% done, estimate finish Sun May 11 23:54:22 2008
22.50% done, estimate finish Sun May 11 23:54:22 2008
22.53% done, estimate finish Sun May 11 23:54:21 2008
22.55% done, estimate finish Sun May 11 23:54:21 2008
22.58% done, estimate finish Sun May 11 23:54:20 2008
22.61% done, estimate finish Sun May 11 23:54:20 2008
22.63% done, estimate finish Sun May 11 23:54:19 2008
22.66% done, estimate finish Sun May 11 23:54:19 2008
22.68% done, estimate finish Sun May 11 23:54:18 2008
22.71% done, estimate finish Sun May 11 23:54:18 2008
22.73% done, estimate finish Sun May 11 23:54:17 2008
22.76% done, estimate finish Sun May 11 23:54:21 2008
22.79% done, estimate finish Sun May 11 23:54:21 2008
22.81% done, estimate finish Sun May 11 23:54:20 2008
22.84% done, estimate finish Sun May 11 23:54:19 2008
22.86% done, estimate finish Sun May 11 23:54:19 2008
22.89% done, estimate finish Sun May 11 23:54:18 2008
22.91% done, estimate finish Sun May 11 23:54:18 2008
22.94% done, estimate finish Sun May 11 23:54:17 2008
22.97% done, estimate finish Sun May 11 23:54:17 2008
22.99% done, estimate finish Sun May 11 23:54:16 2008
23.02% done, estimate finish Sun May 11 23:54:16 2008
23.04% done, estimate finish Sun May 11 23:54:15 2008
23.07% done, estimate finish Sun May 11 23:54:15 2008
23.10% done, estimate finish Sun May 11 23:54:19 2008
23.12% done, estimate finish Sun May 11 23:54:18 2008
23.15% done, estimate finish Sun May 11 23:54:18 2008
23.17% done, estimate finish Sun May 11 23:54:17 2008
23.20% done, estimate finish Sun May 11 23:54:17 2008
23.22% done, estimate finish Sun May 11 23:54:16 2008
23.25% done, estimate finish Sun May 11 23:54:16 2008
23.28% done, estimate finish Sun May 11 23:54:15 2008
23.30% done, estimate finish Sun May 11 23:54:15 2008
23.33% done, estimate finish Sun May 11 23:54:14 2008
23.35% done, estimate finish Sun May 11 23:54:14 2008
23.38% done, estimate finish Sun May 11 23:54:13 2008
23.41% done, estimate finish Sun May 11 23:54:13 2008
23.43% done, estimate finish Sun May 11 23:54:12 2008
23.46% done, estimate finish Sun May 11 23:54:16 2008
23.48% done, estimate finish Sun May 11 23:54:16 2008
23.51% done, estimate finish Sun May 11 23:54:15 2008
23.53% done, estimate finish Sun May 11 23:54:15 2008
23.56% done, estimate finish Sun May 11 23:54:14 2008
23.59% done, estimate finish Sun May 11 23:54:14 2008
23.61% done, estimate finish Sun May 11 23:54:13 2008
23.64% done, estimate finish Sun May 11 23:54:13 2008
23.66% done, estimate finish Sun May 11 23:54:12 2008
23.69% done, estimate finish Sun May 11 23:54:12 2008
23.72% done, estimate finish Sun May 11 23:54:11 2008
23.74% done, estimate finish Sun May 11 23:54:11 2008
23.77% done, estimate finish Sun May 11 23:54:10 2008
23.79% done, estimate finish Sun May 11 23:54:14 2008
23.82% done, estimate finish Sun May 11 23:54:14 2008
23.84% done, estimate finish Sun May 11 23:54:13 2008
23.87% done, estimate finish Sun May 11 23:54:13 2008
23.90% done, estimate finish Sun May 11 23:54:12 2008
23.92% done, estimate finish Sun May 11 23:54:12 2008
23.95% done, estimate finish Sun May 11 23:54:11 2008
23.97% done, estimate finish Sun May 11 23:54:11 2008
24.00% done, estimate finish Sun May 11 23:54:10 2008
24.02% done, estimate finish Sun May 11 23:54:10 2008
24.05% done, estimate finish Sun May 11 23:54:09 2008
24.08% done, estimate finish Sun May 11 23:54:09 2008
24.10% done, estimate finish Sun May 11 23:54:08 2008
24.13% done, estimate finish Sun May 11 23:54:12 2008
24.15% done, estimate finish Sun May 11 23:54:11 2008
24.18% done, estimate finish Sun May 11 23:54:11 2008
24.21% done, estimate finish Sun May 11 23:54:11 2008
24.23% done, estimate finish Sun May 11 23:54:10 2008
24.26% done, estimate finish Sun May 11 23:54:10 2008
24.28% done, estimate finish Sun May 11 23:54:09 2008
24.31% done, estimate finish Sun May 11 23:54:09 2008
24.33% done, estimate finish Sun May 11 23:54:08 2008
24.36% done, estimate finish Sun May 11 23:54:08 2008
24.39% done, estimate finish Sun May 11 23:54:07 2008
24.41% done, estimate finish Sun May 11 23:54:07 2008
24.44% done, estimate finish Sun May 11 23:54:06 2008
24.46% done, estimate finish Sun May 11 23:54:06 2008
24.49% done, estimate finish Sun May 11 23:54:10 2008
24.52% done, estimate finish Sun May 11 23:54:09 2008
24.54% done, estimate finish Sun May 11 23:54:09 2008
24.57% done, estimate finish Sun May 11 23:54:08 2008
24.59% done, estimate finish Sun May 11 23:54:08 2008
24.62% done, estimate finish Sun May 11 23:54:07 2008
24.64% done, estimate finish Sun May 11 23:54:07 2008
24.67% done, estimate finish Sun May 11 23:54:06 2008
24.70% done, estimate finish Sun May 11 23:54:06 2008
24.72% done, estimate finish Sun May 11 23:54:05 2008
24.75% done, estimate finish Sun May 11 23:54:05 2008
24.77% done, estimate finish Sun May 11 23:54:04 2008
24.80% done, estimate finish Sun May 11 23:54:04 2008
24.82% done, estimate finish Sun May 11 23:54:08 2008
24.85% done, estimate finish Sun May 11 23:54:07 2008
24.88% done, estimate finish Sun May 11 23:54:07 2008
24.90% done, estimate finish Sun May 11 23:54:06 2008
24.93% done, estimate finish Sun May 11 23:54:06 2008
24.95% done, estimate finish Sun May 11 23:54:05 2008
24.98% done, estimate finish Sun May 11 23:54:05 2008
25.01% done, estimate finish Sun May 11 23:54:04 2008
25.03% done, estimate finish Sun May 11 23:54:04 2008
25.06% done, estimate finish Sun May 11 23:54:04 2008
25.08% done, estimate finish Sun May 11 23:54:03 2008
25.11% done, estimate finish Sun May 11 23:54:03 2008
25.13% done, estimate finish Sun May 11 23:54:02 2008
25.16% done, estimate finish Sun May 11 23:54:02 2008
25.19% done, estimate finish Sun May 11 23:54:05 2008
25.21% done, estimate finish Sun May 11 23:54:05 2008
25.24% done, estimate finish Sun May 11 23:54:04 2008
25.26% done, estimate finish Sun May 11 23:54:04 2008
25.29% done, estimate finish Sun May 11 23:54:03 2008
25.32% done, estimate finish Sun May 11 23:54:03 2008
25.34% done, estimate finish Sun May 11 23:54:03 2008
25.37% done, estimate finish Sun May 11 23:54:02 2008
25.39% done, estimate finish Sun May 11 23:54:02 2008
25.42% done, estimate finish Sun May 11 23:54:01 2008
25.44% done, estimate finish Sun May 11 23:54:01 2008
25.47% done, estimate finish Sun May 11 23:54:00 2008
25.50% done, estimate finish Sun May 11 23:54:00 2008
25.52% done, estimate finish Sun May 11 23:54:03 2008
25.55% done, estimate finish Sun May 11 23:54:03 2008
25.57% done, estimate finish Sun May 11 23:54:03 2008
25.60% done, estimate finish Sun May 11 23:54:02 2008
25.63% done, estimate finish Sun May 11 23:54:02 2008
25.65% done, estimate finish Sun May 11 23:54:01 2008
25.68% done, estimate finish Sun May 11 23:54:01 2008
25.70% done, estimate finish Sun May 11 23:54:00 2008
25.73% done, estimate finish Sun May 11 23:54:00 2008
25.75% done, estimate finish Sun May 11 23:54:03 2008
25.78% done, estimate finish Sun May 11 23:54:03 2008
25.81% done, estimate finish Sun May 11 23:54:03 2008
25.83% done, estimate finish Sun May 11 23:54:02 2008
25.86% done, estimate finish Sun May 11 23:54:02 2008
25.88% done, estimate finish Sun May 11 23:54:01 2008
25.91% done, estimate finish Sun May 11 23:54:01 2008
25.93% done, estimate finish Sun May 11 23:54:00 2008
25.96% done, estimate finish Sun May 11 23:54:00 2008
25.99% done, estimate finish Sun May 11 23:54:00 2008
26.01% done, estimate finish Sun May 11 23:53:59 2008
26.04% done, estimate finish Sun May 11 23:53:59 2008
26.06% done, estimate finish Sun May 11 23:53:58 2008
26.09% done, estimate finish Sun May 11 23:53:58 2008
26.11% done, estimate finish Sun May 11 23:54:01 2008
26.14% done, estimate finish Sun May 11 23:54:01 2008
26.17% done, estimate finish Sun May 11 23:54:00 2008
26.19% done, estimate finish Sun May 11 23:54:00 2008
26.22% done, estimate finish Sun May 11 23:54:00 2008
26.24% done, estimate finish Sun May 11 23:53:59 2008
26.27% done, estimate finish Sun May 11 23:53:59 2008
26.30% done, estimate finish Sun May 11 23:53:58 2008
26.32% done, estimate finish Sun May 11 23:53:58 2008
26.35% done, estimate finish Sun May 11 23:53:57 2008
26.37% done, estimate finish Sun May 11 23:53:57 2008
26.40% done, estimate finish Sun May 11 23:53:57 2008
26.42% done, estimate finish Sun May 11 23:53:56 2008
26.45% done, estimate finish Sun May 11 23:53:59 2008
26.48% done, estimate finish Sun May 11 23:53:59 2008
26.50% done, estimate finish Sun May 11 23:53:59 2008
26.53% done, estimate finish Sun May 11 23:53:58 2008
26.55% done, estimate finish Sun May 11 23:53:58 2008
26.58% done, estimate finish Sun May 11 23:53:57 2008
26.61% done, estimate finish Sun May 11 23:53:57 2008
26.63% done, estimate finish Sun May 11 23:53:57 2008
26.66% done, estimate finish Sun May 11 23:53:56 2008
26.68% done, estimate finish Sun May 11 23:53:56 2008
26.71% done, estimate finish Sun May 11 23:53:55 2008
26.73% done, estimate finish Sun May 11 23:53:55 2008
26.76% done, estimate finish Sun May 11 23:53:55 2008
26.79% done, estimate finish Sun May 11 23:53:54 2008
26.81% done, estimate finish Sun May 11 23:53:57 2008
26.84% done, estimate finish Sun May 11 23:53:57 2008
26.86% done, estimate finish Sun May 11 23:53:57 2008
26.89% done, estimate finish Sun May 11 23:53:56 2008
26.91% done, estimate finish Sun May 11 23:53:56 2008
26.94% done, estimate finish Sun May 11 23:53:55 2008
26.97% done, estimate finish Sun May 11 23:53:55 2008
26.99% done, estimate finish Sun May 11 23:53:55 2008
27.02% done, estimate finish Sun May 11 23:53:54 2008
27.04% done, estimate finish Sun May 11 23:53:54 2008
27.07% done, estimate finish Sun May 11 23:53:53 2008
27.10% done, estimate finish Sun May 11 23:53:53 2008
27.12% done, estimate finish Sun May 11 23:53:53 2008
27.15% done, estimate finish Sun May 11 23:53:52 2008
27.17% done, estimate finish Sun May 11 23:53:55 2008
27.20% done, estimate finish Sun May 11 23:53:55 2008
27.22% done, estimate finish Sun May 11 23:53:55 2008
27.25% done, estimate finish Sun May 11 23:53:54 2008
27.28% done, estimate finish Sun May 11 23:53:54 2008
27.30% done, estimate finish Sun May 11 23:53:53 2008
27.33% done, estimate finish Sun May 11 23:53:53 2008
27.35% done, estimate finish Sun May 11 23:53:53 2008
27.38% done, estimate finish Sun May 11 23:53:52 2008
27.41% done, estimate finish Sun May 11 23:53:52 2008
27.43% done, estimate finish Sun May 11 23:53:51 2008
27.46% done, estimate finish Sun May 11 23:53:51 2008
27.48% done, estimate finish Sun May 11 23:53:51 2008
27.51% done, estimate finish Sun May 11 23:53:50 2008
27.53% done, estimate finish Sun May 11 23:53:53 2008
27.56% done, estimate finish Sun May 11 23:53:53 2008
27.59% done, estimate finish Sun May 11 23:53:53 2008
27.61% done, estimate finish Sun May 11 23:53:52 2008
27.64% done, estimate finish Sun May 11 23:53:52 2008
27.66% done, estimate finish Sun May 11 23:53:51 2008
27.69% done, estimate finish Sun May 11 23:53:51 2008
27.72% done, estimate finish Sun May 11 23:53:51 2008
27.74% done, estimate finish Sun May 11 23:53:50 2008
27.77% done, estimate finish Sun May 11 23:53:50 2008
27.79% done, estimate finish Sun May 11 23:53:49 2008
27.82% done, estimate finish Sun May 11 23:53:49 2008
27.84% done, estimate finish Sun May 11 23:53:49 2008
27.87% done, estimate finish Sun May 11 23:53:48 2008
27.90% done, estimate finish Sun May 11 23:53:52 2008
27.92% done, estimate finish Sun May 11 23:53:51 2008
27.95% done, estimate finish Sun May 11 23:53:51 2008
27.97% done, estimate finish Sun May 11 23:53:50 2008
28.00% done, estimate finish Sun May 11 23:53:50 2008
28.02% done, estimate finish Sun May 11 23:53:50 2008
28.05% done, estimate finish Sun May 11 23:53:49 2008
28.08% done, estimate finish Sun May 11 23:53:49 2008
28.10% done, estimate finish Sun May 11 23:53:48 2008
28.13% done, estimate finish Sun May 11 23:53:48 2008
28.15% done, estimate finish Sun May 11 23:53:48 2008
28.18% done, estimate finish Sun May 11 23:53:47 2008
28.21% done, estimate finish Sun May 11 23:53:47 2008
28.23% done, estimate finish Sun May 11 23:53:46 2008
28.26% done, estimate finish Sun May 11 23:53:50 2008
28.28% done, estimate finish Sun May 11 23:53:49 2008
28.31% done, estimate finish Sun May 11 23:53:49 2008
28.33% done, estimate finish Sun May 11 23:53:48 2008
28.36% done, estimate finish Sun May 11 23:53:48 2008
28.39% done, estimate finish Sun May 11 23:53:48 2008
28.41% done, estimate finish Sun May 11 23:53:47 2008
28.44% done, estimate finish Sun May 11 23:53:47 2008
28.46% done, estimate finish Sun May 11 23:53:47 2008
28.49% done, estimate finish Sun May 11 23:53:46 2008
28.52% done, estimate finish Sun May 11 23:53:46 2008
28.54% done, estimate finish Sun May 11 23:53:45 2008
28.57% done, estimate finish Sun May 11 23:53:45 2008
28.59% done, estimate finish Sun May 11 23:53:48 2008
28.62% done, estimate finish Sun May 11 23:53:48 2008
28.64% done, estimate finish Sun May 11 23:53:47 2008
28.67% done, estimate finish Sun May 11 23:53:47 2008
28.70% done, estimate finish Sun May 11 23:53:47 2008
28.72% done, estimate finish Sun May 11 23:53:46 2008
28.75% done, estimate finish Sun May 11 23:53:46 2008
28.77% done, estimate finish Sun May 11 23:53:46 2008
28.80% done, estimate finish Sun May 11 23:53:45 2008
28.82% done, estimate finish Sun May 11 23:53:45 2008
28.85% done, estimate finish Sun May 11 23:53:44 2008
28.88% done, estimate finish Sun May 11 23:53:44 2008
28.90% done, estimate finish Sun May 11 23:53:44 2008
28.93% done, estimate finish Sun May 11 23:53:43 2008
28.95% done, estimate finish Sun May 11 23:53:43 2008
28.98% done, estimate finish Sun May 11 23:53:46 2008
29.00% done, estimate finish Sun May 11 23:53:46 2008
29.03% done, estimate finish Sun May 11 23:53:45 2008
29.06% done, estimate finish Sun May 11 23:53:45 2008
29.08% done, estimate finish Sun May 11 23:53:45 2008
29.11% done, estimate finish Sun May 11 23:53:44 2008
29.13% done, estimate finish Sun May 11 23:53:44 2008
29.16% done, estimate finish Sun May 11 23:53:43 2008
29.19% done, estimate finish Sun May 11 23:53:43 2008
29.21% done, estimate finish Sun May 11 23:53:43 2008
29.24% done, estimate finish Sun May 11 23:53:42 2008
29.26% done, estimate finish Sun May 11 23:53:42 2008
29.29% done, estimate finish Sun May 11 23:53:42 2008
29.31% done, estimate finish Sun May 11 23:53:41 2008
29.34% done, estimate finish Sun May 11 23:53:44 2008
29.37% done, estimate finish Sun May 11 23:53:44 2008
29.39% done, estimate finish Sun May 11 23:53:44 2008
29.42% done, estimate finish Sun May 11 23:53:43 2008
29.44% done, estimate finish Sun May 11 23:53:43 2008
29.47% done, estimate finish Sun May 11 23:53:42 2008
29.50% done, estimate finish Sun May 11 23:53:42 2008
29.52% done, estimate finish Sun May 11 23:53:42 2008
29.55% done, estimate finish Sun May 11 23:53:41 2008
29.57% done, estimate finish Sun May 11 23:53:41 2008
29.60% done, estimate finish Sun May 11 23:53:41 2008
29.62% done, estimate finish Sun May 11 23:53:40 2008
29.65% done, estimate finish Sun May 11 23:53:40 2008
29.68% done, estimate finish Sun May 11 23:53:40 2008
29.70% done, estimate finish Sun May 11 23:53:43 2008
29.73% done, estimate finish Sun May 11 23:53:42 2008
29.75% done, estimate finish Sun May 11 23:53:42 2008
29.78% done, estimate finish Sun May 11 23:53:42 2008
29.81% done, estimate finish Sun May 11 23:53:41 2008
29.83% done, estimate finish Sun May 11 23:53:41 2008
29.86% done, estimate finish Sun May 11 23:53:40 2008
29.88% done, estimate finish Sun May 11 23:53:40 2008
29.91% done, estimate finish Sun May 11 23:53:40 2008
29.93% done, estimate finish Sun May 11 23:53:39 2008
29.96% done, estimate finish Sun May 11 23:53:39 2008
29.99% done, estimate finish Sun May 11 23:53:39 2008
30.01% done, estimate finish Sun May 11 23:53:38 2008
30.04% done, estimate finish Sun May 11 23:53:38 2008
30.06% done, estimate finish Sun May 11 23:53:41 2008
30.09% done, estimate finish Sun May 11 23:53:41 2008
30.11% done, estimate finish Sun May 11 23:53:40 2008
30.14% done, estimate finish Sun May 11 23:53:40 2008
30.17% done, estimate finish Sun May 11 23:53:40 2008
30.19% done, estimate finish Sun May 11 23:53:39 2008
30.22% done, estimate finish Sun May 11 23:53:39 2008
30.24% done, estimate finish Sun May 11 23:53:39 2008
30.27% done, estimate finish Sun May 11 23:53:38 2008
30.30% done, estimate finish Sun May 11 23:53:38 2008
30.32% done, estimate finish Sun May 11 23:53:37 2008
30.35% done, estimate finish Sun May 11 23:53:37 2008
30.37% done, estimate finish Sun May 11 23:53:37 2008
30.40% done, estimate finish Sun May 11 23:53:36 2008
30.42% done, estimate finish Sun May 11 23:53:39 2008
30.45% done, estimate finish Sun May 11 23:53:39 2008
30.48% done, estimate finish Sun May 11 23:53:39 2008
30.50% done, estimate finish Sun May 11 23:53:38 2008
30.53% done, estimate finish Sun May 11 23:53:38 2008
30.55% done, estimate finish Sun May 11 23:53:38 2008
30.58% done, estimate finish Sun May 11 23:53:37 2008
30.61% done, estimate finish Sun May 11 23:53:37 2008
30.63% done, estimate finish Sun May 11 23:53:37 2008
30.66% done, estimate finish Sun May 11 23:53:36 2008
30.68% done, estimate finish Sun May 11 23:53:36 2008
30.71% done, estimate finish Sun May 11 23:53:36 2008
30.73% done, estimate finish Sun May 11 23:53:35 2008
30.76% done, estimate finish Sun May 11 23:53:35 2008
30.79% done, estimate finish Sun May 11 23:53:38 2008
30.81% done, estimate finish Sun May 11 23:53:37 2008
30.84% done, estimate finish Sun May 11 23:53:37 2008
30.86% done, estimate finish Sun May 11 23:53:37 2008
30.89% done, estimate finish Sun May 11 23:53:36 2008
30.91% done, estimate finish Sun May 11 23:53:36 2008
30.94% done, estimate finish Sun May 11 23:53:36 2008
30.97% done, estimate finish Sun May 11 23:53:35 2008
30.99% done, estimate finish Sun May 11 23:53:35 2008
31.02% done, estimate finish Sun May 11 23:53:35 2008
31.04% done, estimate finish Sun May 11 23:53:34 2008
31.07% done, estimate finish Sun May 11 23:53:34 2008
31.10% done, estimate finish Sun May 11 23:53:34 2008
31.12% done, estimate finish Sun May 11 23:53:33 2008
31.15% done, estimate finish Sun May 11 23:53:33 2008
31.17% done, estimate finish Sun May 11 23:53:36 2008
31.20% done, estimate finish Sun May 11 23:53:36 2008
31.22% done, estimate finish Sun May 11 23:53:35 2008
31.25% done, estimate finish Sun May 11 23:53:35 2008
31.28% done, estimate finish Sun May 11 23:53:35 2008
31.30% done, estimate finish Sun May 11 23:53:34 2008
31.33% done, estimate finish Sun May 11 23:53:34 2008
31.35% done, estimate finish Sun May 11 23:53:34 2008
31.38% done, estimate finish Sun May 11 23:53:33 2008
31.41% done, estimate finish Sun May 11 23:53:33 2008
31.43% done, estimate finish Sun May 11 23:53:33 2008
31.46% done, estimate finish Sun May 11 23:53:32 2008
31.48% done, estimate finish Sun May 11 23:53:32 2008
31.51% done, estimate finish Sun May 11 23:53:32 2008
31.53% done, estimate finish Sun May 11 23:53:34 2008
31.56% done, estimate finish Sun May 11 23:53:34 2008
31.59% done, estimate finish Sun May 11 23:53:34 2008
31.61% done, estimate finish Sun May 11 23:53:33 2008
31.64% done, estimate finish Sun May 11 23:53:33 2008
31.66% done, estimate finish Sun May 11 23:53:33 2008
31.69% done, estimate finish Sun May 11 23:53:32 2008
31.71% done, estimate finish Sun May 11 23:53:32 2008
31.74% done, estimate finish Sun May 11 23:53:32 2008
31.77% done, estimate finish Sun May 11 23:53:31 2008
31.79% done, estimate finish Sun May 11 23:53:31 2008
31.82% done, estimate finish Sun May 11 23:53:31 2008
31.84% done, estimate finish Sun May 11 23:53:30 2008
31.87% done, estimate finish Sun May 11 23:53:30 2008
31.90% done, estimate finish Sun May 11 23:53:33 2008
31.92% done, estimate finish Sun May 11 23:53:33 2008
31.95% done, estimate finish Sun May 11 23:53:32 2008
31.97% done, estimate finish Sun May 11 23:53:32 2008
32.00% done, estimate finish Sun May 11 23:53:32 2008
32.02% done, estimate finish Sun May 11 23:53:31 2008
32.05% done, estimate finish Sun May 11 23:53:31 2008
32.08% done, estimate finish Sun May 11 23:53:31 2008
32.10% done, estimate finish Sun May 11 23:53:30 2008
32.13% done, estimate finish Sun May 11 23:53:30 2008
32.15% done, estimate finish Sun May 11 23:53:30 2008
32.18% done, estimate finish Sun May 11 23:53:29 2008
32.21% done, estimate finish Sun May 11 23:53:29 2008
32.23% done, estimate finish Sun May 11 23:53:29 2008
32.26% done, estimate finish Sun May 11 23:53:28 2008
32.28% done, estimate finish Sun May 11 23:53:31 2008
32.31% done, estimate finish Sun May 11 23:53:31 2008
32.33% done, estimate finish Sun May 11 23:53:31 2008
32.36% done, estimate finish Sun May 11 23:53:30 2008
32.39% done, estimate finish Sun May 11 23:53:30 2008
32.41% done, estimate finish Sun May 11 23:53:30 2008
32.44% done, estimate finish Sun May 11 23:53:29 2008
32.46% done, estimate finish Sun May 11 23:53:29 2008
32.49% done, estimate finish Sun May 11 23:53:29 2008
32.51% done, estimate finish Sun May 11 23:53:28 2008
32.54% done, estimate finish Sun May 11 23:53:28 2008
32.57% done, estimate finish Sun May 11 23:53:28 2008
32.59% done, estimate finish Sun May 11 23:53:27 2008
32.62% done, estimate finish Sun May 11 23:53:27 2008
32.64% done, estimate finish Sun May 11 23:53:30 2008
32.67% done, estimate finish Sun May 11 23:53:29 2008
32.69% done, estimate finish Sun May 11 23:53:29 2008
32.72% done, estimate finish Sun May 11 23:53:29 2008
32.75% done, estimate finish Sun May 11 23:53:29 2008
32.77% done, estimate finish Sun May 11 23:53:28 2008
32.80% done, estimate finish Sun May 11 23:53:28 2008
32.82% done, estimate finish Sun May 11 23:53:28 2008
32.85% done, estimate finish Sun May 11 23:53:27 2008
32.88% done, estimate finish Sun May 11 23:53:27 2008
32.90% done, estimate finish Sun May 11 23:53:27 2008
32.93% done, estimate finish Sun May 11 23:53:26 2008
32.95% done, estimate finish Sun May 11 23:53:26 2008
32.98% done, estimate finish Sun May 11 23:53:26 2008
33.00% done, estimate finish Sun May 11 23:53:25 2008
33.03% done, estimate finish Sun May 11 23:53:28 2008
33.06% done, estimate finish Sun May 11 23:53:28 2008
33.08% done, estimate finish Sun May 11 23:53:28 2008
33.11% done, estimate finish Sun May 11 23:53:27 2008
33.13% done, estimate finish Sun May 11 23:53:27 2008
33.16% done, estimate finish Sun May 11 23:53:27 2008
33.19% done, estimate finish Sun May 11 23:53:26 2008
33.21% done, estimate finish Sun May 11 23:53:26 2008
33.24% done, estimate finish Sun May 11 23:53:26 2008
33.26% done, estimate finish Sun May 11 23:53:25 2008
33.29% done, estimate finish Sun May 11 23:53:25 2008
33.31% done, estimate finish Sun May 11 23:53:25 2008
33.34% done, estimate finish Sun May 11 23:53:24 2008
33.37% done, estimate finish Sun May 11 23:53:24 2008
33.39% done, estimate finish Sun May 11 23:53:24 2008
33.42% done, estimate finish Sun May 11 23:53:26 2008
33.44% done, estimate finish Sun May 11 23:53:26 2008
33.47% done, estimate finish Sun May 11 23:53:26 2008
33.50% done, estimate finish Sun May 11 23:53:26 2008
33.52% done, estimate finish Sun May 11 23:53:25 2008
33.55% done, estimate finish Sun May 11 23:53:25 2008
33.57% done, estimate finish Sun May 11 23:53:25 2008
33.60% done, estimate finish Sun May 11 23:53:24 2008
33.62% done, estimate finish Sun May 11 23:53:24 2008
33.65% done, estimate finish Sun May 11 23:53:24 2008
33.68% done, estimate finish Sun May 11 23:53:23 2008
33.70% done, estimate finish Sun May 11 23:53:23 2008
33.73% done, estimate finish Sun May 11 23:53:23 2008
33.75% done, estimate finish Sun May 11 23:53:23 2008
33.78% done, estimate finish Sun May 11 23:53:25 2008
33.80% done, estimate finish Sun May 11 23:53:25 2008
33.83% done, estimate finish Sun May 11 23:53:25 2008
33.86% done, estimate finish Sun May 11 23:53:24 2008
33.88% done, estimate finish Sun May 11 23:53:24 2008
33.91% done, estimate finish Sun May 11 23:53:24 2008
33.93% done, estimate finish Sun May 11 23:53:23 2008
33.96% done, estimate finish Sun May 11 23:53:23 2008
33.99% done, estimate finish Sun May 11 23:53:23 2008
34.01% done, estimate finish Sun May 11 23:53:22 2008
34.04% done, estimate finish Sun May 11 23:53:22 2008
34.06% done, estimate finish Sun May 11 23:53:22 2008
34.09% done, estimate finish Sun May 11 23:53:22 2008
34.11% done, estimate finish Sun May 11 23:53:21 2008
34.14% done, estimate finish Sun May 11 23:53:21 2008
34.17% done, estimate finish Sun May 11 23:53:24 2008
34.19% done, estimate finish Sun May 11 23:53:23 2008
34.22% done, estimate finish Sun May 11 23:53:23 2008
34.24% done, estimate finish Sun May 11 23:53:23 2008
34.27% done, estimate finish Sun May 11 23:53:22 2008
34.30% done, estimate finish Sun May 11 23:53:22 2008
34.32% done, estimate finish Sun May 11 23:53:22 2008
34.35% done, estimate finish Sun May 11 23:53:22 2008
34.37% done, estimate finish Sun May 11 23:53:21 2008
34.40% done, estimate finish Sun May 11 23:53:21 2008
34.42% done, estimate finish Sun May 11 23:53:21 2008
34.45% done, estimate finish Sun May 11 23:53:20 2008
34.48% done, estimate finish Sun May 11 23:53:20 2008
34.50% done, estimate finish Sun May 11 23:53:20 2008
34.53% done, estimate finish Sun May 11 23:53:19 2008
34.55% done, estimate finish Sun May 11 23:53:22 2008
34.58% done, estimate finish Sun May 11 23:53:22 2008
34.60% done, estimate finish Sun May 11 23:53:22 2008
34.63% done, estimate finish Sun May 11 23:53:21 2008
34.66% done, estimate finish Sun May 11 23:53:21 2008
34.68% done, estimate finish Sun May 11 23:53:21 2008
34.71% done, estimate finish Sun May 11 23:53:20 2008
34.73% done, estimate finish Sun May 11 23:53:20 2008
34.76% done, estimate finish Sun May 11 23:53:20 2008
34.79% done, estimate finish Sun May 11 23:53:19 2008
34.81% done, estimate finish Sun May 11 23:53:19 2008
34.84% done, estimate finish Sun May 11 23:53:19 2008
34.86% done, estimate finish Sun May 11 23:53:19 2008
34.89% done, estimate finish Sun May 11 23:53:18 2008
34.91% done, estimate finish Sun May 11 23:53:18 2008
34.94% done, estimate finish Sun May 11 23:53:21 2008
34.97% done, estimate finish Sun May 11 23:53:20 2008
34.99% done, estimate finish Sun May 11 23:53:20 2008
35.02% done, estimate finish Sun May 11 23:53:20 2008
35.04% done, estimate finish Sun May 11 23:53:19 2008
35.07% done, estimate finish Sun May 11 23:53:19 2008
35.10% done, estimate finish Sun May 11 23:53:19 2008
35.12% done, estimate finish Sun May 11 23:53:19 2008
35.15% done, estimate finish Sun May 11 23:53:18 2008
35.17% done, estimate finish Sun May 11 23:53:18 2008
35.20% done, estimate finish Sun May 11 23:53:18 2008
35.22% done, estimate finish Sun May 11 23:53:17 2008
35.25% done, estimate finish Sun May 11 23:53:17 2008
35.28% done, estimate finish Sun May 11 23:53:17 2008
35.30% done, estimate finish Sun May 11 23:53:19 2008
35.33% done, estimate finish Sun May 11 23:53:19 2008
35.35% done, estimate finish Sun May 11 23:53:19 2008
35.38% done, estimate finish Sun May 11 23:53:19 2008
35.41% done, estimate finish Sun May 11 23:53:18 2008
35.43% done, estimate finish Sun May 11 23:53:18 2008
35.46% done, estimate finish Sun May 11 23:53:18 2008
35.48% done, estimate finish Sun May 11 23:53:17 2008
35.51% done, estimate finish Sun May 11 23:53:17 2008
35.53% done, estimate finish Sun May 11 23:53:17 2008
35.56% done, estimate finish Sun May 11 23:53:17 2008
35.59% done, estimate finish Sun May 11 23:53:16 2008
35.61% done, estimate finish Sun May 11 23:53:16 2008
35.64% done, estimate finish Sun May 11 23:53:16 2008
35.66% done, estimate finish Sun May 11 23:53:15 2008
35.69% done, estimate finish Sun May 11 23:53:18 2008
35.71% done, estimate finish Sun May 11 23:53:18 2008
35.74% done, estimate finish Sun May 11 23:53:17 2008
35.77% done, estimate finish Sun May 11 23:53:17 2008
35.79% done, estimate finish Sun May 11 23:53:17 2008
35.82% done, estimate finish Sun May 11 23:53:17 2008
35.84% done, estimate finish Sun May 11 23:53:16 2008
35.87% done, estimate finish Sun May 11 23:53:16 2008
35.89% done, estimate finish Sun May 11 23:53:16 2008
35.92% done, estimate finish Sun May 11 23:53:15 2008
35.95% done, estimate finish Sun May 11 23:53:15 2008
35.97% done, estimate finish Sun May 11 23:53:15 2008
36.00% done, estimate finish Sun May 11 23:53:15 2008
36.02% done, estimate finish Sun May 11 23:53:14 2008
36.05% done, estimate finish Sun May 11 23:53:14 2008
36.08% done, estimate finish Sun May 11 23:53:17 2008
36.10% done, estimate finish Sun May 11 23:53:16 2008
36.13% done, estimate finish Sun May 11 23:53:16 2008
36.15% done, estimate finish Sun May 11 23:53:16 2008
36.18% done, estimate finish Sun May 11 23:53:15 2008
36.20% done, estimate finish Sun May 11 23:53:15 2008
36.23% done, estimate finish Sun May 11 23:53:15 2008
36.26% done, estimate finish Sun May 11 23:53:15 2008
36.28% done, estimate finish Sun May 11 23:53:14 2008
36.31% done, estimate finish Sun May 11 23:53:14 2008
36.33% done, estimate finish Sun May 11 23:53:14 2008
36.36% done, estimate finish Sun May 11 23:53:14 2008
36.39% done, estimate finish Sun May 11 23:53:13 2008
36.41% done, estimate finish Sun May 11 23:53:13 2008
36.44% done, estimate finish Sun May 11 23:53:13 2008
36.46% done, estimate finish Sun May 11 23:53:15 2008
36.49% done, estimate finish Sun May 11 23:53:15 2008
36.51% done, estimate finish Sun May 11 23:53:15 2008
36.54% done, estimate finish Sun May 11 23:53:14 2008
36.57% done, estimate finish Sun May 11 23:53:14 2008
36.59% done, estimate finish Sun May 11 23:53:14 2008
36.62% done, estimate finish Sun May 11 23:53:14 2008
36.64% done, estimate finish Sun May 11 23:53:13 2008
36.67% done, estimate finish Sun May 11 23:53:13 2008
36.70% done, estimate finish Sun May 11 23:53:13 2008
36.72% done, estimate finish Sun May 11 23:53:12 2008
36.75% done, estimate finish Sun May 11 23:53:12 2008
36.77% done, estimate finish Sun May 11 23:53:12 2008
36.80% done, estimate finish Sun May 11 23:53:12 2008
36.82% done, estimate finish Sun May 11 23:53:11 2008
36.85% done, estimate finish Sun May 11 23:53:14 2008
36.88% done, estimate finish Sun May 11 23:53:14 2008
36.90% done, estimate finish Sun May 11 23:53:13 2008
36.93% done, estimate finish Sun May 11 23:53:13 2008
36.95% done, estimate finish Sun May 11 23:53:13 2008
36.98% done, estimate finish Sun May 11 23:53:13 2008
37.00% done, estimate finish Sun May 11 23:53:12 2008
37.03% done, estimate finish Sun May 11 23:53:12 2008
37.06% done, estimate finish Sun May 11 23:53:12 2008
37.08% done, estimate finish Sun May 11 23:53:11 2008
37.11% done, estimate finish Sun May 11 23:53:11 2008
37.13% done, estimate finish Sun May 11 23:53:11 2008
37.16% done, estimate finish Sun May 11 23:53:11 2008
37.19% done, estimate finish Sun May 11 23:53:10 2008
37.21% done, estimate finish Sun May 11 23:53:10 2008
37.24% done, estimate finish Sun May 11 23:53:13 2008
37.26% done, estimate finish Sun May 11 23:53:12 2008
37.29% done, estimate finish Sun May 11 23:53:12 2008
37.31% done, estimate finish Sun May 11 23:53:12 2008
37.34% done, estimate finish Sun May 11 23:53:11 2008
37.37% done, estimate finish Sun May 11 23:53:11 2008
37.39% done, estimate finish Sun May 11 23:53:11 2008
37.42% done, estimate finish Sun May 11 23:53:11 2008
37.44% done, estimate finish Sun May 11 23:53:10 2008
37.47% done, estimate finish Sun May 11 23:53:10 2008
37.50% done, estimate finish Sun May 11 23:53:10 2008
37.52% done, estimate finish Sun May 11 23:53:10 2008
37.55% done, estimate finish Sun May 11 23:53:09 2008
37.57% done, estimate finish Sun May 11 23:53:09 2008
37.60% done, estimate finish Sun May 11 23:53:09 2008
37.62% done, estimate finish Sun May 11 23:53:11 2008
37.65% done, estimate finish Sun May 11 23:53:11 2008
37.68% done, estimate finish Sun May 11 23:53:11 2008
37.70% done, estimate finish Sun May 11 23:53:10 2008
37.73% done, estimate finish Sun May 11 23:53:10 2008
37.75% done, estimate finish Sun May 11 23:53:10 2008
37.78% done, estimate finish Sun May 11 23:53:10 2008
37.81% done, estimate finish Sun May 11 23:53:09 2008
37.83% done, estimate finish Sun May 11 23:53:09 2008
37.86% done, estimate finish Sun May 11 23:53:09 2008
37.88% done, estimate finish Sun May 11 23:53:09 2008
37.91% done, estimate finish Sun May 11 23:53:08 2008
37.93% done, estimate finish Sun May 11 23:53:08 2008
37.96% done, estimate finish Sun May 11 23:53:08 2008
37.99% done, estimate finish Sun May 11 23:53:08 2008
38.01% done, estimate finish Sun May 11 23:53:07 2008
38.04% done, estimate finish Sun May 11 23:53:10 2008
38.06% done, estimate finish Sun May 11 23:53:09 2008
38.09% done, estimate finish Sun May 11 23:53:09 2008
38.11% done, estimate finish Sun May 11 23:53:09 2008
38.14% done, estimate finish Sun May 11 23:53:09 2008
38.17% done, estimate finish Sun May 11 23:53:08 2008
38.19% done, estimate finish Sun May 11 23:53:08 2008
38.22% done, estimate finish Sun May 11 23:53:08 2008
38.24% done, estimate finish Sun May 11 23:53:08 2008
38.27% done, estimate finish Sun May 11 23:53:07 2008
38.30% done, estimate finish Sun May 11 23:53:07 2008
38.32% done, estimate finish Sun May 11 23:53:07 2008
38.35% done, estimate finish Sun May 11 23:53:07 2008
38.37% done, estimate finish Sun May 11 23:53:06 2008
38.40% done, estimate finish Sun May 11 23:53:06 2008
38.42% done, estimate finish Sun May 11 23:53:08 2008
38.45% done, estimate finish Sun May 11 23:53:08 2008
38.48% done, estimate finish Sun May 11 23:53:08 2008
38.50% done, estimate finish Sun May 11 23:53:08 2008
38.53% done, estimate finish Sun May 11 23:53:07 2008
38.55% done, estimate finish Sun May 11 23:53:07 2008
38.58% done, estimate finish Sun May 11 23:53:07 2008
38.60% done, estimate finish Sun May 11 23:53:07 2008
38.63% done, estimate finish Sun May 11 23:53:06 2008
38.66% done, estimate finish Sun May 11 23:53:06 2008
38.68% done, estimate finish Sun May 11 23:53:06 2008
38.71% done, estimate finish Sun May 11 23:53:06 2008
38.73% done, estimate finish Sun May 11 23:53:05 2008
38.76% done, estimate finish Sun May 11 23:53:05 2008
38.78% done, estimate finish Sun May 11 23:53:05 2008
38.81% done, estimate finish Sun May 11 23:53:07 2008
38.84% done, estimate finish Sun May 11 23:53:07 2008
38.86% done, estimate finish Sun May 11 23:53:07 2008
38.89% done, estimate finish Sun May 11 23:53:07 2008
38.91% done, estimate finish Sun May 11 23:53:06 2008
38.94% done, estimate finish Sun May 11 23:53:06 2008
38.97% done, estimate finish Sun May 11 23:53:06 2008
38.99% done, estimate finish Sun May 11 23:53:06 2008
39.02% done, estimate finish Sun May 11 23:53:05 2008
39.04% done, estimate finish Sun May 11 23:53:05 2008
39.07% done, estimate finish Sun May 11 23:53:05 2008
39.09% done, estimate finish Sun May 11 23:53:05 2008
39.12% done, estimate finish Sun May 11 23:53:04 2008
39.15% done, estimate finish Sun May 11 23:53:04 2008
39.17% done, estimate finish Sun May 11 23:53:04 2008
39.20% done, estimate finish Sun May 11 23:53:04 2008
39.22% done, estimate finish Sun May 11 23:53:06 2008
39.25% done, estimate finish Sun May 11 23:53:06 2008
39.28% done, estimate finish Sun May 11 23:53:05 2008
39.30% done, estimate finish Sun May 11 23:53:05 2008
39.33% done, estimate finish Sun May 11 23:53:05 2008
39.35% done, estimate finish Sun May 11 23:53:05 2008
39.38% done, estimate finish Sun May 11 23:53:04 2008
39.40% done, estimate finish Sun May 11 23:53:04 2008
39.43% done, estimate finish Sun May 11 23:53:04 2008
39.46% done, estimate finish Sun May 11 23:53:04 2008
39.48% done, estimate finish Sun May 11 23:53:03 2008
39.51% done, estimate finish Sun May 11 23:53:03 2008
39.53% done, estimate finish Sun May 11 23:53:03 2008
39.56% done, estimate finish Sun May 11 23:53:03 2008
39.59% done, estimate finish Sun May 11 23:53:02 2008
39.61% done, estimate finish Sun May 11 23:53:05 2008
39.64% done, estimate finish Sun May 11 23:53:04 2008
39.66% done, estimate finish Sun May 11 23:53:04 2008
39.69% done, estimate finish Sun May 11 23:53:04 2008
39.71% done, estimate finish Sun May 11 23:53:04 2008
39.74% done, estimate finish Sun May 11 23:53:03 2008
39.77% done, estimate finish Sun May 11 23:53:03 2008
39.79% done, estimate finish Sun May 11 23:53:03 2008
39.82% done, estimate finish Sun May 11 23:53:03 2008
39.84% done, estimate finish Sun May 11 23:53:02 2008
39.87% done, estimate finish Sun May 11 23:53:02 2008
39.89% done, estimate finish Sun May 11 23:53:04 2008
39.92% done, estimate finish Sun May 11 23:53:04 2008
39.95% done, estimate finish Sun May 11 23:53:04 2008
39.97% done, estimate finish Sun May 11 23:53:04 2008
40.00% done, estimate finish Sun May 11 23:53:04 2008
40.02% done, estimate finish Sun May 11 23:53:03 2008
40.05% done, estimate finish Sun May 11 23:53:03 2008
40.08% done, estimate finish Sun May 11 23:53:03 2008
40.10% done, estimate finish Sun May 11 23:53:03 2008
40.13% done, estimate finish Sun May 11 23:53:02 2008
40.15% done, estimate finish Sun May 11 23:53:02 2008
40.18% done, estimate finish Sun May 11 23:53:02 2008
40.20% done, estimate finish Sun May 11 23:53:02 2008
40.23% done, estimate finish Sun May 11 23:53:01 2008
40.26% done, estimate finish Sun May 11 23:53:01 2008
40.28% done, estimate finish Sun May 11 23:53:01 2008
40.31% done, estimate finish Sun May 11 23:53:01 2008
40.33% done, estimate finish Sun May 11 23:53:00 2008
40.36% done, estimate finish Sun May 11 23:53:00 2008
40.39% done, estimate finish Sun May 11 23:53:00 2008
40.41% done, estimate finish Sun May 11 23:53:02 2008
40.44% done, estimate finish Sun May 11 23:53:02 2008
40.46% done, estimate finish Sun May 11 23:53:02 2008
40.49% done, estimate finish Sun May 11 23:53:01 2008
40.51% done, estimate finish Sun May 11 23:53:01 2008
40.54% done, estimate finish Sun May 11 23:53:01 2008
40.57% done, estimate finish Sun May 11 23:53:01 2008
40.59% done, estimate finish Sun May 11 23:53:00 2008
40.62% done, estimate finish Sun May 11 23:53:00 2008
40.64% done, estimate finish Sun May 11 23:53:00 2008
40.67% done, estimate finish Sun May 11 23:53:00 2008
40.70% done, estimate finish Sun May 11 23:53:00 2008
40.72% done, estimate finish Sun May 11 23:52:59 2008
40.75% done, estimate finish Sun May 11 23:52:59 2008
40.77% done, estimate finish Sun May 11 23:52:59 2008
40.80% done, estimate finish Sun May 11 23:53:01 2008
40.82% done, estimate finish Sun May 11 23:53:01 2008
40.85% done, estimate finish Sun May 11 23:53:01 2008
40.88% done, estimate finish Sun May 11 23:53:00 2008
40.90% done, estimate finish Sun May 11 23:53:00 2008
40.93% done, estimate finish Sun May 11 23:53:00 2008
40.95% done, estimate finish Sun May 11 23:53:00 2008
40.98% done, estimate finish Sun May 11 23:52:59 2008
41.00% done, estimate finish Sun May 11 23:52:59 2008
41.03% done, estimate finish Sun May 11 23:52:59 2008
41.06% done, estimate finish Sun May 11 23:52:59 2008
41.08% done, estimate finish Sun May 11 23:52:58 2008
41.11% done, estimate finish Sun May 11 23:52:58 2008
41.13% done, estimate finish Sun May 11 23:52:58 2008
41.16% done, estimate finish Sun May 11 23:52:58 2008
41.19% done, estimate finish Sun May 11 23:52:58 2008
41.21% done, estimate finish Sun May 11 23:53:00 2008
41.24% done, estimate finish Sun May 11 23:53:00 2008
41.26% done, estimate finish Sun May 11 23:52:59 2008
41.29% done, estimate finish Sun May 11 23:52:59 2008
41.31% done, estimate finish Sun May 11 23:52:59 2008
41.34% done, estimate finish Sun May 11 23:52:59 2008
41.37% done, estimate finish Sun May 11 23:52:58 2008
41.39% done, estimate finish Sun May 11 23:52:58 2008
41.42% done, estimate finish Sun May 11 23:52:58 2008
41.44% done, estimate finish Sun May 11 23:52:58 2008
41.47% done, estimate finish Sun May 11 23:52:57 2008
41.50% done, estimate finish Sun May 11 23:52:57 2008
41.52% done, estimate finish Sun May 11 23:52:57 2008
41.55% done, estimate finish Sun May 11 23:52:57 2008
41.57% done, estimate finish Sun May 11 23:52:57 2008
41.60% done, estimate finish Sun May 11 23:52:59 2008
41.62% done, estimate finish Sun May 11 23:52:58 2008
41.65% done, estimate finish Sun May 11 23:52:58 2008
41.68% done, estimate finish Sun May 11 23:53:00 2008
41.70% done, estimate finish Sun May 11 23:53:03 2008
mkisofs calculate size command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -print-size -quiet -volid generic_database -volset -appid K3B THE CD KREATOR (C) 1998-2006 SEBASTIAN TRUEG AND THE K3B TEAM -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /home/mdutku/tmp/kde-mdutku/k3bQE38bb.tmp -rational-rock -hide-list /home/mdutku/tmp/kde-mdutku/k3bZa7l2b.tmp -joliet -joliet-long -hide-joliet-list /home/mdutku/tmp/kde-mdutku/k3b5y2j2a.tmp -no-cache-inodes -full-iso9660-filenames -disable-deep-relocation -iso-level 2 -path-list /home/mdutku/tmp/kde-mdutku/k3bXjbLic.tmp
mkisofs command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -volid generic_database -volset -appid K3B THE CD KREATOR (C) 1998-2006 SEBASTIAN TRUEG AND THE K3B TEAM -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /home/mdutku/tmp/kde-mdutku/k3bQyGeHa.tmp -rational-rock -hide-list /home/mdutku/tmp/kde-mdutku/k3bg7P1kb.tmp -joliet -joliet-long -hide-joliet-list /home/mdutku/tmp/kde-mdutku/k3bFAG4Ta.tmp -no-cache-inodes -full-iso9660-filenames -disable-deep-relocation -iso-level 2 -path-list /home/mdutku/tmp/kde-mdutku/k3b67jmfc.tmp
I am an Ubuntu user since 6.10 Edgy Eft. I recently installed 8.04 Hardy Heron, tried to burn a 16x DVD+R on a new SATA DVD Writer, LG GH20NS10. It did not go. To see, whether it has to do with the operating system itself, I have downloaded Mandriva 2008 Spring and installed it.
I have run K3B and I still get the same error. Please see the attached file to see K3B error window.
This DVD+R can be burned with this SATA DVD Writer without any problem on Windows XP.
System
-----------------------
K3b Version: 1.0.4
KDE Version: 3.5.9
QT Version: 3.3.8b
Kernel: 2.6.24.4-desktop-1mnb
Devices
-----------------------
HL-DT-ST DVDRAM GH20NS10 EL00 (/dev/sr0, ) [CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R, DVD-RW, DVD-R DL, DVD+R, DVD+RW, DVD+R DL] [DVD-ROM, DVD-R Sequential, DVD-R Dual Layer Sequential, DVD-R Dual Layer Jump, DVD-RAM, DVD-RW Restricted Overwrite, DVD-RW Sequential, DVD+RW, DVD+R, DVD+R Dual Layer, CD-ROM, CD-R, CD-RW] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R, Restricted Overwrite, Layer Jump]
SAMSUNG CDRW/DVD SM-352B T809 (/dev/hdc, ) [CD-R, CD-RW, CD-ROM, DVD-ROM] [DVD-ROM, CD-ROM, CD-R, CD-RW] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R]
Burned media
-----------------------
DVD+R
K3bIsoImager
-----------------------
mkisofs print size result: 1937608 (3968221184 bytes)
Pipe throughput: 1655496704 bytes read, 1655476224 bytes written.
Used versions
-----------------------
mkisofs: 1.1.7.1
growisofs: 7.0
growisofs
-----------------------
Executing 'builtin_dd if=/dev/fd/0 of=/dev/sr0 obs=32k seek=0'
/dev/sr0: "Current Write Speed" is 16.4x1352KBps.
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
0/3968221184 ( 0.0%) @0x, remaining ??:?? RBU 100.0% UBU 0.0%
1114112/3968221184 ( 0.0%) @0.2x, remaining 1483:39 RBU 100.0% UBU 2.9%
25788416/3968221184 ( 0.6%) @5.3x, remaining 71:20 RBU 100.0% UBU 100.0%
59146240/3968221184 ( 1.5%) @7.2x, remaining 35:14 RBU 100.0% UBU 100.0%
93093888/3968221184 ( 2.3%) @7.4x, remaining 24:16 RBU 100.0% UBU 100.0%
127565824/3968221184 ( 3.2%) @7.5x, remaining 19:04 RBU 100.0% UBU 100.0%
162594816/3968221184 ( 4.1%) @7.6x, remaining 16:23 RBU 100.0% UBU 100.0%
198180864/3968221184 ( 5.0%) @7.7x, remaining 14:16 RBU 100.0% UBU 100.0%
234323968/3968221184 ( 5.9%) @7.8x, remaining 12:44 RBU 100.0% UBU 100.0%
270991360/3968221184 ( 6.8%) @7.9x, remaining 11:49 RBU 100.0% UBU 100.0%
304250880/3968221184 ( 7.7%) @7.2x, remaining 11:02 RBU 100.0% UBU 100.0%
341999616/3968221184 ( 8.6%) @8.2x, remaining 10:14 RBU 100.0% UBU 100.0%
380272640/3968221184 ( 9.6%) @8.3x, remaining 9:44 RBU 100.0% UBU 100.0%
419135488/3968221184 (10.6%) @8.4x, remaining 9:10 RBU 100.0% UBU 100.0%
458522624/3968221184 (11.6%) @8.5x, remaining 8:40 RBU 100.0% UBU 97.1%
498466816/3968221184 (12.6%) @8.7x, remaining 8:21 RBU 100.0% UBU 100.0%
538935296/3968221184 (13.6%) @8.8x, remaining 7:57 RBU 100.0% UBU 100.0%
579993600/3968221184 (14.6%) @8.9x, remaining 7:35 RBU 100.0% UBU 97.1%
621576192/3968221184 (15.7%) @9.0x, remaining 7:21 RBU 100.0% UBU 97.1%
663748608/3968221184 (16.7%) @9.1x, remaining 7:03 RBU 100.0% UBU 97.1%
706445312/3968221184 (17.8%) @9.3x, remaining 6:46 RBU 100.0% UBU 100.0%
749699072/3968221184 (18.9%) @9.4x, remaining 6:34 RBU 100.0% UBU 100.0%
793509888/3968221184 (20.0%) @9.5x, remaining 6:20 RBU 100.0% UBU 100.0%
837877760/3968221184 (21.1%) @9.6x, remaining 6:06 RBU 100.0% UBU 100.0%
882769920/3968221184 (22.2%) @9.7x, remaining 5:56 RBU 100.0% UBU 100.0%
928251904/3968221184 (23.4%) @9.9x, remaining 5:43 RBU 100.0% UBU 100.0%
974258176/3968221184 (24.6%) @10.0x, remaining 5:31 RBU 100.0% UBU 100.0%
1015971840/3968221184 (25.6%) @9.0x, remaining 5:25 RBU 100.0% UBU 97.1%
1063026688/3968221184 (26.8%) @10.2x, remaining 5:14 RBU 100.0% UBU 100.0%
1110638592/3968221184 (28.0%) @10.3x, remaining 5:03 RBU 100.0% UBU 100.0%
1158807552/3968221184 (29.2%) @10.4x, remaining 4:55 RBU 100.0% UBU 97.1%
1207533568/3968221184 (30.4%) @10.6x, remaining 4:45 RBU 100.0% UBU 100.0%
1256816640/3968221184 (31.7%) @10.7x, remaining 4:36 RBU 100.0% UBU 97.1%
1306656768/3968221184 (32.9%) @10.8x, remaining 4:28 RBU 99.9% UBU 100.0%
1357053952/3968221184 (34.2%) @10.9x, remaining 4:19 RBU 100.0% UBU 100.0%
1407975424/3968221184 (35.5%) @11.0x, remaining 4:10 RBU 100.0% UBU 100.0%
1459453952/3968221184 (36.8%) @11.2x, remaining 4:04 RBU 100.0% UBU 100.0%
1511489536/3968221184 (38.1%) @11.3x, remaining 3:55 RBU 100.0% UBU 100.0%
1564082176/3968221184 (39.4%) @11.4x, remaining 3:47 RBU 98.6% UBU 100.0%
1617231872/3968221184 (40.8%) @11.5x, remaining 3:40 RBU 99.0% UBU 100.0%
1621819392/3968221184 (40.9%) @1.0x, remaining 3:44 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 3:48 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 3:54 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 3:58 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:03 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:08 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:13 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:17 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:23 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:27 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:31 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:37 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:42 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:46 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:52 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 4:56 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 5:00 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 5:06 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 5:11 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 5:15 RBU 100.0% UBU 100.0%
1621819392/3968221184 (40.9%) @0.0x, remaining 5:21 RBU 100.0% UBU 100.0%
:-[ WRITE@LBA=c1560h failed with SK=0h/ASC=00h/ACQ=02h]: Input/output error
:-( write failed: Input/output error
/dev/sr0: flushing cache
/dev/sr0: closing track
/dev/sr0: closing session
growisofs command:
-----------------------
/usr/bin/growisofs -Z /dev/sr0=/dev/fd/0 -use-the-force-luke=notray -use-the-force-luke=tty -use-the-force-luke=tracksize:1937608 -speed=16 -use-the-force-luke=bufsize:32m
mkisofs
-----------------------
1937608
I: -input-charset not specified, using utf-8 (detected in locale settings)
Using ... (some filenames which I don't want to show to public)
0.08% done, estimate finish Sun May 11 23:46:49 2008
0.10% done, estimate finish Mon May 12 00:02:53 2008
0.13% done, estimate finish Sun May 11 23:59:43 2008
0.16% done, estimate finish Sun May 11 23:57:33 2008
0.18% done, estimate finish Sun May 11 23:56:01 2008
0.21% done, estimate finish Sun May 11 23:54:52 2008
0.23% done, estimate finish Sun May 11 23:53:58 2008
0.26% done, estimate finish Sun May 11 23:53:15 2008
0.28% done, estimate finish Sun May 11 23:52:40 2008
0.31% done, estimate finish Sun May 11 23:52:11 2008
0.34% done, estimate finish Sun May 11 23:51:46 2008
0.36% done, estimate finish Sun May 11 23:51:25 2008
0.39% done, estimate finish Sun May 11 23:55:25 2008
0.41% done, estimate finish Sun May 11 23:54:53 2008
0.44% done, estimate finish Sun May 11 23:54:24 2008
0.46% done, estimate finish Sun May 11 23:53:59 2008
0.49% done, estimate finish Sun May 11 23:53:36 2008
0.52% done, estimate finish Sun May 11 23:53:16 2008
0.54% done, estimate finish Sun May 11 23:52:57 2008
0.57% done, estimate finish Sun May 11 23:52:40 2008
0.59% done, estimate finish Sun May 11 23:52:25 2008
0.62% done, estimate finish Sun May 11 23:52:11 2008
0.65% done, estimate finish Sun May 11 23:51:58 2008
0.67% done, estimate finish Sun May 11 23:51:47 2008
0.70% done, estimate finish Sun May 11 23:51:36 2008
0.72% done, estimate finish Sun May 11 23:51:25 2008
0.75% done, estimate finish Sun May 11 23:51:16 2008
0.77% done, estimate finish Sun May 11 23:51:07 2008
0.80% done, estimate finish Sun May 11 23:50:58 2008
0.83% done, estimate finish Sun May 11 23:50:51 2008
0.85% done, estimate finish Mon May 12 00:33:46 2008
0.88% done, estimate finish Mon May 12 00:32:22 2008
0.90% done, estimate finish Mon May 12 00:38:27 2008
0.93% done, estimate finish Mon May 12 00:37:01 2008
0.95% done, estimate finish Mon May 12 00:35:41 2008
0.98% done, estimate finish Mon May 12 00:34:22 2008
1.01% done, estimate finish Mon May 12 00:33:09 2008
1.03% done, estimate finish Mon May 12 00:32:00 2008
1.06% done, estimate finish Mon May 12 00:30:55 2008
1.08% done, estimate finish Mon May 12 00:31:22 2008
1.11% done, estimate finish Mon May 12 00:30:21 2008
1.14% done, estimate finish Mon May 12 00:29:22 2008
1.16% done, estimate finish Mon May 12 00:28:25 2008
1.19% done, estimate finish Mon May 12 00:27:31 2008
1.21% done, estimate finish Mon May 12 00:26:38 2008
1.24% done, estimate finish Mon May 12 00:25:49 2008
1.26% done, estimate finish Mon May 12 00:25:01 2008
1.29% done, estimate finish Mon May 12 00:24:16 2008
1.32% done, estimate finish Mon May 12 00:23:31 2008
1.34% done, estimate finish Mon May 12 00:24:03 2008
1.37% done, estimate finish Mon May 12 00:23:22 2008
1.39% done, estimate finish Mon May 12 00:22:41 2008
1.42% done, estimate finish Mon May 12 00:22:01 2008
1.45% done, estimate finish Mon May 12 00:21:24 2008
1.47% done, estimate finish Mon May 12 00:20:48 2008
1.50% done, estimate finish Mon May 12 00:20:13 2008
1.52% done, estimate finish Mon May 12 00:19:38 2008
1.55% done, estimate finish Mon May 12 00:19:05 2008
1.57% done, estimate finish Mon May 12 00:18:34 2008
1.60% done, estimate finish Mon May 12 00:19:06 2008
1.63% done, estimate finish Mon May 12 00:18:35 2008
1.65% done, estimate finish Mon May 12 00:18:05 2008
1.68% done, estimate finish Mon May 12 00:17:36 2008
1.70% done, estimate finish Mon May 12 00:17:09 2008
1.73% done, estimate finish Mon May 12 00:16:41 2008
1.76% done, estimate finish Mon May 12 00:16:15 2008
1.78% done, estimate finish Mon May 12 00:15:49 2008
1.81% done, estimate finish Mon May 12 00:15:25 2008
1.83% done, estimate finish Mon May 12 00:15:54 2008
1.86% done, estimate finish Mon May 12 00:15:30 2008
1.88% done, estimate finish Mon May 12 00:15:07 2008
1.91% done, estimate finish Mon May 12 00:14:44 2008
1.94% done, estimate finish Mon May 12 00:14:21 2008
1.96% done, estimate finish Mon May 12 00:14:00 2008
1.99% done, estimate finish Mon May 12 00:13:39 2008
2.01% done, estimate finish Mon May 12 00:13:18 2008
2.04% done, estimate finish Mon May 12 00:12:58 2008
2.06% done, estimate finish Mon May 12 00:12:38 2008
2.09% done, estimate finish Mon May 12 00:13:07 2008
2.12% done, estimate finish Mon May 12 00:12:48 2008
2.14% done, estimate finish Mon May 12 00:12:29 2008
2.17% done, estimate finish Mon May 12 00:12:11 2008
2.19% done, estimate finish Mon May 12 00:11:53 2008
2.22% done, estimate finish Mon May 12 00:11:35 2008
2.25% done, estimate finish Mon May 12 00:11:18 2008
2.27% done, estimate finish Mon May 12 00:11:01 2008
2.30% done, estimate finish Mon May 12 00:10:45 2008
2.32% done, estimate finish Mon May 12 00:10:29 2008
2.35% done, estimate finish Mon May 12 00:10:56 2008
2.37% done, estimate finish Mon May 12 00:10:40 2008
2.40% done, estimate finish Mon May 12 00:10:25 2008
2.43% done, estimate finish Mon May 12 00:10:10 2008
2.45% done, estimate finish Mon May 12 00:09:55 2008
2.48% done, estimate finish Mon May 12 00:09:41 2008
2.50% done, estimate finish Mon May 12 00:09:27 2008
2.53% done, estimate finish Mon May 12 00:09:13 2008
2.56% done, estimate finish Mon May 12 00:08:59 2008
2.58% done, estimate finish Mon May 12 00:08:46 2008
2.61% done, estimate finish Mon May 12 00:09:11 2008
2.63% done, estimate finish Mon May 12 00:08:58 2008
2.66% done, estimate finish Mon May 12 00:08:45 2008
2.68% done, estimate finish Mon May 12 00:08:32 2008
2.71% done, estimate finish Mon May 12 00:08:20 2008
2.74% done, estimate finish Mon May 12 00:08:08 2008
2.76% done, estimate finish Mon May 12 00:07:56 2008
2.79% done, estimate finish Mon May 12 00:07:44 2008
2.81% done, estimate finish Mon May 12 00:07:33 2008
2.84% done, estimate finish Mon May 12 00:07:21 2008
2.87% done, estimate finish Mon May 12 00:07:45 2008
2.89% done, estimate finish Mon May 12 00:07:34 2008
2.92% done, estimate finish Mon May 12 00:07:23 2008
2.94% done, estimate finish Mon May 12 00:07:12 2008
2.97% done, estimate finish Mon May 12 00:07:01 2008
2.99% done, estimate finish Mon May 12 00:06:51 2008
3.02% done, estimate finish Mon May 12 00:06:41 2008
3.05% done, estimate finish Mon May 12 00:06:31 2008
3.07% done, estimate finish Mon May 12 00:06:21 2008
3.10% done, estimate finish Mon May 12 00:06:11 2008
3.12% done, estimate finish Mon May 12 00:06:33 2008
3.15% done, estimate finish Mon May 12 00:06:24 2008
3.17% done, estimate finish Mon May 12 00:06:14 2008
3.20% done, estimate finish Mon May 12 00:06:05 2008
3.23% done, estimate finish Mon May 12 00:05:56 2008
3.25% done, estimate finish Mon May 12 00:05:46 2008
3.28% done, estimate finish Mon May 12 00:05:37 2008
3.30% done, estimate finish Mon May 12 00:05:29 2008
3.33% done, estimate finish Mon May 12 00:05:20 2008
3.36% done, estimate finish Mon May 12 00:05:11 2008
3.38% done, estimate finish Mon May 12 00:05:32 2008
3.41% done, estimate finish Mon May 12 00:05:24 2008
3.43% done, estimate finish Mon May 12 00:05:16 2008
3.46% done, estimate finish Mon May 12 00:05:07 2008
3.48% done, estimate finish Mon May 12 00:04:59 2008
3.51% done, estimate finish Mon May 12 00:04:51 2008
3.54% done, estimate finish Mon May 12 00:04:43 2008
3.56% done, estimate finish Mon May 12 00:04:35 2008
3.59% done, estimate finish Mon May 12 00:04:28 2008
3.61% done, estimate finish Mon May 12 00:04:20 2008
3.64% done, estimate finish Mon May 12 00:04:40 2008
3.66% done, estimate finish Mon May 12 00:04:33 2008
3.69% done, estimate finish Mon May 12 00:04:25 2008
3.72% done, estimate finish Mon May 12 00:04:18 2008
3.74% done, estimate finish Mon May 12 00:04:11 2008
3.77% done, estimate finish Mon May 12 00:04:03 2008
3.79% done, estimate finish Mon May 12 00:03:56 2008
3.82% done, estimate finish Mon May 12 00:03:50 2008
3.84% done, estimate finish Mon May 12 00:03:43 2008
3.87% done, estimate finish Mon May 12 00:03:36 2008
3.90% done, estimate finish Mon May 12 00:03:55 2008
3.92% done, estimate finish Mon May 12 00:03:48 2008
3.95% done, estimate finish Mon May 12 00:03:42 2008
3.97% done, estimate finish Mon May 12 00:03:35 2008
4.00% done, estimate finish Mon May 12 00:03:28 2008
4.03% done, estimate finish Mon May 12 00:03:22 2008
4.05% done, estimate finish Mon May 12 00:03:16 2008
4.08% done, estimate finish Mon May 12 00:03:09 2008
4.10% done, estimate finish Mon May 12 00:03:03 2008
4.13% done, estimate finish Mon May 12 00:02:57 2008
4.15% done, estimate finish Mon May 12 00:03:15 2008
4.18% done, estimate finish Mon May 12 00:03:09 2008
4.21% done, estimate finish Mon May 12 00:03:03 2008
4.23% done, estimate finish Mon May 12 00:02:57 2008
4.26% done, estimate finish Mon May 12 00:02:51 2008
4.28% done, estimate finish Mon May 12 00:02:45 2008
4.31% done, estimate finish Mon May 12 00:02:40 2008
4.34% done, estimate finish Mon May 12 00:02:34 2008
4.36% done, estimate finish Mon May 12 00:02:29 2008
4.39% done, estimate finish Mon May 12 00:02:23 2008
4.41% done, estimate finish Mon May 12 00:02:40 2008
4.44% done, estimate finish Mon May 12 00:02:35 2008
4.46% done, estimate finish Mon May 12 00:02:29 2008
4.49% done, estimate finish Mon May 12 00:02:24 2008
4.52% done, estimate finish Mon May 12 00:02:18 2008
4.54% done, estimate finish Mon May 12 00:02:13 2008
4.57% done, estimate finish Mon May 12 00:02:08 2008
4.59% done, estimate finish Mon May 12 00:02:03 2008
4.62% done, estimate finish Mon May 12 00:01:58 2008
4.65% done, estimate finish Mon May 12 00:01:53 2008
4.67% done, estimate finish Mon May 12 00:01:48 2008
4.70% done, estimate finish Mon May 12 00:02:04 2008
4.72% done, estimate finish Mon May 12 00:01:59 2008
4.75% done, estimate finish Mon May 12 00:01:54 2008
4.77% done, estimate finish Mon May 12 00:01:49 2008
4.80% done, estimate finish Mon May 12 00:01:44 2008
4.83% done, estimate finish Mon May 12 00:01:40 2008
4.85% done, estimate finish Mon May 12 00:01:35 2008
4.88% done, estimate finish Mon May 12 00:01:30 2008
4.90% done, estimate finish Mon May 12 00:01:25 2008
4.93% done, estimate finish Mon May 12 00:01:21 2008
4.95% done, estimate finish Mon May 12 00:01:37 2008
4.98% done, estimate finish Mon May 12 00:01:32 2008
5.01% done, estimate finish Mon May 12 00:01:27 2008
5.03% done, estimate finish Mon May 12 00:01:23 2008
5.06% done, estimate finish Mon May 12 00:01:18 2008
5.08% done, estimate finish Mon May 12 00:01:14 2008
5.11% done, estimate finish Mon May 12 00:01:10 2008
5.14% done, estimate finish Mon May 12 00:01:05 2008
5.16% done, estimate finish Mon May 12 00:01:01 2008
5.19% done, estimate finish Mon May 12 00:00:57 2008
5.21% done, estimate finish Mon May 12 00:01:12 2008
5.24% done, estimate finish Mon May 12 00:01:07 2008
5.26% done, estimate finish Mon May 12 00:01:03 2008
5.29% done, estimate finish Mon May 12 00:00:59 2008
5.32% done, estimate finish Mon May 12 00:00:55 2008
5.34% done, estimate finish Mon May 12 00:00:51 2008
5.37% done, estimate finish Mon May 12 00:00:47 2008
5.39% done, estimate finish Mon May 12 00:00:43 2008
5.42% done, estimate finish Mon May 12 00:00:39 2008
5.45% done, estimate finish Mon May 12 00:00:35 2008
5.47% done, estimate finish Mon May 12 00:00:31 2008
5.50% done, estimate finish Mon May 12 00:00:45 2008
5.52% done, estimate finish Mon May 12 00:00:41 2008
5.55% done, estimate finish Mon May 12 00:00:38 2008
5.57% done, estimate finish Mon May 12 00:00:34 2008
5.60% done, estimate finish Mon May 12 00:00:30 2008
5.63% done, estimate finish Mon May 12 00:00:26 2008
5.65% done, estimate finish Mon May 12 00:00:22 2008
5.68% done, estimate finish Mon May 12 00:00:19 2008
5.70% done, estimate finish Mon May 12 00:00:15 2008
5.73% done, estimate finish Mon May 12 00:00:11 2008
5.75% done, estimate finish Mon May 12 00:00:25 2008
5.78% done, estimate finish Mon May 12 00:00:22 2008
5.81% done, estimate finish Mon May 12 00:00:18 2008
5.83% done, estimate finish Mon May 12 00:00:14 2008
5.86% done, estimate finish Mon May 12 00:00:11 2008
5.88% done, estimate finish Mon May 12 00:00:07 2008
5.91% done, estimate finish Mon May 12 00:00:04 2008
5.94% done, estimate finish Mon May 12 00:00:00 2008
5.96% done, estimate finish Sun May 11 23:59:57 2008
5.99% done, estimate finish Sun May 11 23:59:54 2008
6.01% done, estimate finish Sun May 11 23:59:50 2008
6.04% done, estimate finish Mon May 12 00:00:03 2008
6.06% done, estimate finish Mon May 12 00:00:00 2008
6.09% done, estimate finish Sun May 11 23:59:57 2008
6.12% done, estimate finish Sun May 11 23:59:53 2008
6.14% done, estimate finish Sun May 11 23:59:50 2008
6.17% done, estimate finish Sun May 11 23:59:47 2008
6.19% done, estimate finish Sun May 11 23:59:44 2008
6.22% done, estimate finish Sun May 11 23:59:40 2008
6.25% done, estimate finish Sun May 11 23:59:37 2008
6.27% done, estimate finish Sun May 11 23:59:34 2008
6.30% done, estimate finish Sun May 11 23:59:47 2008
6.32% done, estimate finish Sun May 11 23:59:44 2008
6.35% done, estimate finish Sun May 11 23:59:40 2008
6.37% done, estimate finish Sun May 11 23:59:37 2008
6.40% done, estimate finish Sun May 11 23:59:34 2008
6.43% done, estimate finish Sun May 11 23:59:31 2008
6.45% done, estimate finish Sun May 11 23:59:28 2008
6.48% done, estimate finish Sun May 11 23:59:25 2008
6.50% done, estimate finish Sun May 11 23:59:22 2008
6.53% done, estimate finish Sun May 11 23:59:19 2008
6.56% done, estimate finish Sun May 11 23:59:16 2008
6.58% done, estimate finish Sun May 11 23:59:28 2008
6.61% done, estimate finish Sun May 11 23:59:25 2008
6.63% done, estimate finish Sun May 11 23:59:22 2008
6.66% done, estimate finish Sun May 11 23:59:19 2008
6.68% done, estimate finish Sun May 11 23:59:17 2008
6.71% done, estimate finish Sun May 11 23:59:14 2008
6.74% done, estimate finish Sun May 11 23:59:11 2008
6.76% done, estimate finish Sun May 11 23:59:08 2008
6.79% done, estimate finish Sun May 11 23:59:05 2008
6.81% done, estimate finish Sun May 11 23:59:02 2008
6.84% done, estimate finish Sun May 11 23:59:00 2008
6.86% done, estimate finish Sun May 11 23:59:11 2008
6.89% done, estimate finish Sun May 11 23:59:09 2008
6.92% done, estimate finish Sun May 11 23:59:06 2008
6.94% done, estimate finish Sun May 11 23:59:03 2008
6.97% done, estimate finish Sun May 11 23:59:00 2008
6.99% done, estimate finish Sun May 11 23:58:58 2008
7.02% done, estimate finish Sun May 11 23:58:55 2008
7.04% done, estimate finish Sun May 11 23:58:52 2008
7.07% done, estimate finish Sun May 11 23:58:50 2008
7.10% done, estimate finish Sun May 11 23:58:47 2008
7.12% done, estimate finish Sun May 11 23:58:59 2008
7.15% done, estimate finish Sun May 11 23:58:56 2008
7.17% done, estimate finish Sun May 11 23:58:53 2008
7.20% done, estimate finish Sun May 11 23:58:51 2008
7.23% done, estimate finish Sun May 11 23:58:48 2008
7.25% done, estimate finish Sun May 11 23:58:46 2008
7.28% done, estimate finish Sun May 11 23:58:43 2008
7.30% done, estimate finish Sun May 11 23:58:41 2008
7.33% done, estimate finish Sun May 11 23:58:38 2008
7.35% done, estimate finish Sun May 11 23:58:36 2008
7.38% done, estimate finish Sun May 11 23:58:33 2008
7.41% done, estimate finish Sun May 11 23:58:44 2008
7.43% done, estimate finish Sun May 11 23:58:42 2008
7.46% done, estimate finish Sun May 11 23:58:39 2008
7.48% done, estimate finish Sun May 11 23:58:37 2008
7.51% done, estimate finish Sun May 11 23:58:34 2008
7.54% done, estimate finish Sun May 11 23:58:32 2008
7.56% done, estimate finish Sun May 11 23:58:29 2008
7.59% done, estimate finish Sun May 11 23:58:27 2008
7.61% done, estimate finish Sun May 11 23:58:25 2008
7.64% done, estimate finish Sun May 11 23:58:22 2008
7.66% done, estimate finish Sun May 11 23:58:20 2008
7.69% done, estimate finish Sun May 11 23:58:31 2008
7.72% done, estimate finish Sun May 11 23:58:28 2008
7.74% done, estimate finish Sun May 11 23:58:26 2008
7.77% done, estimate finish Sun May 11 23:58:24 2008
7.79% done, estimate finish Sun May 11 23:58:21 2008
7.82% done, estimate finish Sun May 11 23:58:19 2008
7.84% done, estimate finish Sun May 11 23:58:17 2008
7.87% done, estimate finish Sun May 11 23:58:27 2008
7.90% done, estimate finish Sun May 11 23:58:25 2008
7.92% done, estimate finish Sun May 11 23:58:23 2008
7.95% done, estimate finish Sun May 11 23:58:20 2008
7.97% done, estimate finish Sun May 11 23:58:18 2008
8.00% done, estimate finish Sun May 11 23:58:16 2008
8.03% done, estimate finish Sun May 11 23:58:14 2008
8.05% done, estimate finish Sun May 11 23:58:12 2008
8.08% done, estimate finish Sun May 11 23:58:09 2008
8.10% done, estimate finish Sun May 11 23:58:07 2008
8.13% done, estimate finish Sun May 11 23:58:05 2008
8.15% done, estimate finish Sun May 11 23:58:15 2008
8.18% done, estimate finish Sun May 11 23:58:13 2008
8.21% done, estimate finish Sun May 11 23:58:11 2008
8.23% done, estimate finish Sun May 11 23:58:09 2008
8.26% done, estimate finish Sun May 11 23:58:07 2008
8.28% done, estimate finish Sun May 11 23:58:05 2008
8.31% done, estimate finish Sun May 11 23:58:02 2008
8.34% done, estimate finish Sun May 11 23:58:00 2008
8.36% done, estimate finish Sun May 11 23:57:58 2008
8.39% done, estimate finish Sun May 11 23:57:56 2008
8.41% done, estimate finish Sun May 11 23:57:54 2008
8.44% done, estimate finish Sun May 11 23:58:04 2008
8.46% done, estimate finish Sun May 11 23:58:02 2008
8.49% done, estimate finish Sun May 11 23:58:00 2008
8.52% done, estimate finish Sun May 11 23:57:58 2008
8.54% done, estimate finish Sun May 11 23:57:56 2008
8.57% done, estimate finish Sun May 11 23:57:54 2008
8.59% done, estimate finish Sun May 11 23:57:52 2008
8.62% done, estimate finish Sun May 11 23:57:50 2008
8.65% done, estimate finish Sun May 11 23:57:48 2008
8.67% done, estimate finish Sun May 11 23:57:46 2008
8.70% done, estimate finish Sun May 11 23:57:44 2008
8.72% done, estimate finish Sun May 11 23:57:53 2008
8.75% done, estimate finish Sun May 11 23:57:51 2008
8.77% done, estimate finish Sun May 11 23:57:50 2008
8.80% done, estimate finish Sun May 11 23:57:48 2008
8.83% done, estimate finish Sun May 11 23:57:46 2008
8.85% done, estimate finish Sun May 11 23:57:44 2008
8.88% done, estimate finish Sun May 11 23:57:42 2008
8.90% done, estimate finish Sun May 11 23:57:40 2008
8.93% done, estimate finish Sun May 11 23:57:38 2008
8.95% done, estimate finish Sun May 11 23:57:36 2008
8.98% done, estimate finish Sun May 11 23:57:34 2008
9.01% done, estimate finish Sun May 11 23:57:44 2008
9.03% done, estimate finish Sun May 11 23:57:42 2008
9.06% done, estimate finish Sun May 11 23:57:40 2008
9.08% done, estimate finish Sun May 11 23:57:38 2008
9.11% done, estimate finish Sun May 11 23:57:36 2008
9.14% done, estimate finish Sun May 11 23:57:34 2008
9.16% done, estimate finish Sun May 11 23:57:33 2008
9.19% done, estimate finish Sun May 11 23:57:31 2008
9.21% done, estimate finish Sun May 11 23:57:29 2008
9.24% done, estimate finish Sun May 11 23:57:27 2008
9.26% done, estimate finish Sun May 11 23:57:25 2008
9.29% done, estimate finish Sun May 11 23:57:34 2008
9.32% done, estimate finish Sun May 11 23:57:33 2008
9.34% done, estimate finish Sun May 11 23:57:31 2008
9.37% done, estimate finish Sun May 11 23:57:29 2008
9.39% done, estimate finish Sun May 11 23:57:27 2008
9.42% done, estimate finish Sun May 11 23:57:26 2008
9.45% done, estimate finish Sun May 11 23:57:24 2008
9.47% done, estimate finish Sun May 11 23:57:22 2008
9.50% done, estimate finish Sun May 11 23:57:20 2008
9.52% done, estimate finish Sun May 11 23:57:19 2008
9.55% done, estimate finish Sun May 11 23:57:17 2008
9.57% done, estimate finish Sun May 11 23:57:26 2008
9.60% done, estimate finish Sun May 11 23:57:24 2008
9.63% done, estimate finish Sun May 11 23:57:22 2008
9.65% done, estimate finish Sun May 11 23:57:21 2008
9.68% done, estimate finish Sun May 11 23:57:19 2008
9.70% done, estimate finish Sun May 11 23:57:17 2008
9.73% done, estimate finish Sun May 11 23:57:16 2008
9.75% done, estimate finish Sun May 11 23:57:14 2008
9.78% done, estimate finish Sun May 11 23:57:12 2008
9.81% done, estimate finish Sun May 11 23:57:11 2008
9.83% done, estimate finish Sun May 11 23:57:09 2008
9.86% done, estimate finish Sun May 11 23:57:17 2008
9.88% done, estimate finish Sun May 11 23:57:16 2008
9.91% done, estimate finish Sun May 11 23:57:14 2008
9.93% done, estimate finish Sun May 11 23:57:13 2008
9.96% done, estimate finish Sun May 11 23:57:11 2008
9.99% done, estimate finish Sun May 11 23:57:09 2008
10.01% done, estimate finish Sun May 11 23:57:08 2008
10.04% done, estimate finish Sun May 11 23:57:06 2008
10.06% done, estimate finish Sun May 11 23:57:05 2008
10.09% done, estimate finish Sun May 11 23:57:03 2008
10.12% done, estimate finish Sun May 11 23:57:01 2008
10.14% done, estimate finish Sun May 11 23:57:10 2008
10.17% done, estimate finish Sun May 11 23:57:08 2008
10.19% done, estimate finish Sun May 11 23:57:07 2008
10.22% done, estimate finish Sun May 11 23:57:05 2008
10.24% done, estimate finish Sun May 11 23:57:03 2008
10.27% done, estimate finish Sun May 11 23:57:02 2008
10.30% done, estimate finish Sun May 11 23:57:00 2008
10.32% done, estimate finish Sun May 11 23:56:59 2008
10.35% done, estimate finish Sun May 11 23:56:57 2008
10.37% done, estimate finish Sun May 11 23:56:56 2008
10.40% done, estimate finish Sun May 11 23:56:54 2008
10.43% done, estimate finish Sun May 11 23:56:53 2008
10.45% done, estimate finish Sun May 11 23:57:01 2008
10.48% done, estimate finish Sun May 11 23:56:59 2008
10.50% done, estimate finish Sun May 11 23:56:58 2008
10.53% done, estimate finish Sun May 11 23:56:56 2008
10.55% done, estimate finish Sun May 11 23:56:55 2008
10.58% done, estimate finish Sun May 11 23:56:53 2008
10.61% done, estimate finish Sun May 11 23:56:52 2008
10.63% done, estimate finish Sun May 11 23:56:50 2008
10.66% done, estimate finish Sun May 11 23:56:49 2008
10.68% done, estimate finish Sun May 11 23:56:48 2008
10.71% done, estimate finish Sun May 11 23:56:46 2008
10.74% done, estimate finish Sun May 11 23:56:54 2008
10.76% done, estimate finish Sun May 11 23:56:53 2008
10.79% done, estimate finish Sun May 11 23:56:51 2008
10.81% done, estimate finish Sun May 11 23:56:50 2008
10.84% done, estimate finish Sun May 11 23:56:48 2008
10.86% done, estimate finish Sun May 11 23:56:47 2008
10.89% done, estimate finish Sun May 11 23:56:45 2008
10.92% done, estimate finish Sun May 11 23:56:44 2008
10.94% done, estimate finish Sun May 11 23:56:43 2008
10.97% done, estimate finish Sun May 11 23:56:41 2008
10.99% done, estimate finish Sun May 11 23:56:40 2008
11.02% done, estimate finish Sun May 11 23:56:47 2008
11.04% done, estimate finish Sun May 11 23:56:46 2008
11.07% done, estimate finish Sun May 11 23:56:45 2008
11.10% done, estimate finish Sun May 11 23:56:43 2008
11.12% done, estimate finish Sun May 11 23:56:42 2008
11.15% done, estimate finish Sun May 11 23:56:41 2008
11.17% done, estimate finish Sun May 11 23:56:39 2008
11.20% done, estimate finish Sun May 11 23:56:38 2008
11.23% done, estimate finish Sun May 11 23:56:36 2008
11.25% done, estimate finish Sun May 11 23:56:35 2008
11.28% done, estimate finish Sun May 11 23:56:34 2008
11.30% done, estimate finish Sun May 11 23:56:32 2008
11.33% done, estimate finish Sun May 11 23:56:40 2008
11.35% done, estimate finish Sun May 11 23:56:39 2008
11.38% done, estimate finish Sun May 11 23:56:37 2008
11.41% done, estimate finish Sun May 11 23:56:36 2008
11.43% done, estimate finish Sun May 11 23:56:35 2008
11.46% done, estimate finish Sun May 11 23:56:33 2008
11.48% done, estimate finish Sun May 11 23:56:32 2008
11.51% done, estimate finish Sun May 11 23:56:31 2008
11.54% done, estimate finish Sun May 11 23:56:29 2008
11.56% done, estimate finish Sun May 11 23:56:28 2008
11.59% done, estimate finish Sun May 11 23:56:27 2008
11.61% done, estimate finish Sun May 11 23:56:34 2008
11.64% done, estimate finish Sun May 11 23:56:33 2008
11.66% done, estimate finish Sun May 11 23:56:31 2008
11.69% done, estimate finish Sun May 11 23:56:30 2008
11.72% done, estimate finish Sun May 11 23:56:29 2008
11.74% done, estimate finish Sun May 11 23:56:28 2008
11.77% done, estimate finish Sun May 11 23:56:26 2008
11.79% done, estimate finish Sun May 11 23:56:25 2008
11.82% done, estimate finish Sun May 11 23:56:24 2008
11.84% done, estimate finish Sun May 11 23:56:23 2008
11.87% done, estimate finish Sun May 11 23:56:21 2008
11.90% done, estimate finish Sun May 11 23:56:20 2008
11.92% done, estimate finish Sun May 11 23:56:27 2008
11.95% done, estimate finish Sun May 11 23:56:26 2008
11.97% done, estimate finish Sun May 11 23:56:25 2008
12.00% done, estimate finish Sun May 11 23:56:24 2008
12.03% done, estimate finish Sun May 11 23:56:22 2008
12.05% done, estimate finish Sun May 11 23:56:21 2008
12.08% done, estimate finish Sun May 11 23:56:20 2008
12.10% done, estimate finish Sun May 11 23:56:19 2008
12.13% done, estimate finish Sun May 11 23:56:17 2008
12.15% done, estimate finish Sun May 11 23:56:16 2008
12.18% done, estimate finish Sun May 11 23:56:15 2008
12.21% done, estimate finish Sun May 11 23:56:22 2008
12.23% done, estimate finish Sun May 11 23:56:21 2008
12.26% done, estimate finish Sun May 11 23:56:20 2008
12.28% done, estimate finish Sun May 11 23:56:18 2008
12.31% done, estimate finish Sun May 11 23:56:17 2008
12.34% done, estimate finish Sun May 11 23:56:16 2008
12.36% done, estimate finish Sun May 11 23:56:15 2008
12.39% done, estimate finish Sun May 11 23:56:14 2008
12.41% done, estimate finish Sun May 11 23:56:12 2008
12.44% done, estimate finish Sun May 11 23:56:11 2008
12.46% done, estimate finish Sun May 11 23:56:10 2008
12.49% done, estimate finish Sun May 11 23:56:09 2008
12.52% done, estimate finish Sun May 11 23:56:16 2008
12.54% done, estimate finish Sun May 11 23:56:15 2008
12.57% done, estimate finish Sun May 11 23:56:13 2008
12.59% done, estimate finish Sun May 11 23:56:12 2008
12.62% done, estimate finish Sun May 11 23:56:11 2008
12.65% done, estimate finish Sun May 11 23:56:10 2008
12.67% done, estimate finish Sun May 11 23:56:09 2008
12.70% done, estimate finish Sun May 11 23:56:08 2008
12.72% done, estimate finish Sun May 11 23:56:07 2008
12.75% done, estimate finish Sun May 11 23:56:05 2008
12.77% done, estimate finish Sun May 11 23:56:04 2008
12.80% done, estimate finish Sun May 11 23:56:11 2008
12.83% done, estimate finish Sun May 11 23:56:10 2008
12.85% done, estimate finish Sun May 11 23:56:09 2008
12.88% done, estimate finish Sun May 11 23:56:08 2008
12.90% done, estimate finish Sun May 11 23:56:07 2008
12.93% done, estimate finish Sun May 11 23:56:05 2008
12.95% done, estimate finish Sun May 11 23:56:04 2008
12.98% done, estimate finish Sun May 11 23:56:03 2008
13.01% done, estimate finish Sun May 11 23:56:02 2008
13.03% done, estimate finish Sun May 11 23:56:01 2008
13.06% done, estimate finish Sun May 11 23:56:00 2008
13.08% done, estimate finish Sun May 11 23:55:59 2008
13.11% done, estimate finish Sun May 11 23:56:05 2008
13.14% done, estimate finish Sun May 11 23:56:04 2008
13.16% done, estimate finish Sun May 11 23:56:03 2008
13.19% done, estimate finish Sun May 11 23:56:02 2008
13.21% done, estimate finish Sun May 11 23:56:01 2008
13.24% done, estimate finish Sun May 11 23:56:00 2008
13.26% done, estimate finish Sun May 11 23:55:59 2008
13.29% done, estimate finish Sun May 11 23:55:58 2008
13.32% done, estimate finish Sun May 11 23:55:57 2008
13.34% done, estimate finish Sun May 11 23:55:56 2008
13.37% done, estimate finish Sun May 11 23:55:55 2008
13.39% done, estimate finish Sun May 11 23:55:54 2008
13.42% done, estimate finish Sun May 11 23:56:00 2008
13.45% done, estimate finish Sun May 11 23:55:59 2008
13.47% done, estimate finish Sun May 11 23:55:58 2008
13.50% done, estimate finish Sun May 11 23:55:57 2008
13.52% done, estimate finish Sun May 11 23:55:56 2008
13.55% done, estimate finish Sun May 11 23:55:55 2008
13.57% done, estimate finish Sun May 11 23:55:54 2008
13.60% done, estimate finish Sun May 11 23:55:53 2008
13.63% done, estimate finish Sun May 11 23:55:52 2008
13.65% done, estimate finish Sun May 11 23:55:51 2008
13.68% done, estimate finish Sun May 11 23:55:50 2008
13.70% done, estimate finish Sun May 11 23:55:49 2008
13.73% done, estimate finish Sun May 11 23:55:55 2008
13.75% done, estimate finish Sun May 11 23:55:54 2008
13.78% done, estimate finish Sun May 11 23:55:53 2008
13.81% done, estimate finish Sun May 11 23:55:52 2008
13.83% done, estimate finish Sun May 11 23:55:51 2008
13.86% done, estimate finish Sun May 11 23:55:50 2008
13.88% done, estimate finish Sun May 11 23:55:49 2008
13.91% done, estimate finish Sun May 11 23:55:48 2008
13.94% done, estimate finish Sun May 11 23:55:47 2008
13.96% done, estimate finish Sun May 11 23:55:46 2008
13.99% done, estimate finish Sun May 11 23:55:45 2008
14.01% done, estimate finish Sun May 11 23:55:44 2008
14.04% done, estimate finish Sun May 11 23:55:50 2008
14.06% done, estimate finish Sun May 11 23:55:49 2008
14.09% done, estimate finish Sun May 11 23:55:48 2008
14.12% done, estimate finish Sun May 11 23:55:47 2008
14.14% done, estimate finish Sun May 11 23:55:46 2008
14.17% done, estimate finish Sun May 11 23:55:45 2008
14.19% done, estimate finish Sun May 11 23:55:44 2008
14.22% done, estimate finish Sun May 11 23:55:43 2008
14.24% done, estimate finish Sun May 11 23:55:42 2008
14.27% done, estimate finish Sun May 11 23:55:41 2008
14.30% done, estimate finish Sun May 11 23:55:40 2008
14.32% done, estimate finish Sun May 11 23:55:39 2008
14.35% done, estimate finish Sun May 11 23:55:45 2008
14.37% done, estimate finish Sun May 11 23:55:44 2008
14.40% done, estimate finish Sun May 11 23:55:43 2008
14.43% done, estimate finish Sun May 11 23:55:42 2008
14.45% done, estimate finish Sun May 11 23:55:41 2008
14.48% done, estimate finish Sun May 11 23:55:40 2008
14.50% done, estimate finish Sun May 11 23:55:39 2008
14.53% done, estimate finish Sun May 11 23:55:39 2008
14.55% done, estimate finish Sun May 11 23:55:38 2008
14.58% done, estimate finish Sun May 11 23:55:37 2008
14.61% done, estimate finish Sun May 11 23:55:36 2008
14.63% done, estimate finish Sun May 11 23:55:42 2008
14.66% done, estimate finish Sun May 11 23:55:41 2008
14.68% done, estimate finish Sun May 11 23:55:40 2008
14.71% done, estimate finish Sun May 11 23:55:39 2008
14.73% done, estimate finish Sun May 11 23:55:38 2008
14.76% done, estimate finish Sun May 11 23:55:37 2008
14.79% done, estimate finish Sun May 11 23:55:36 2008
14.81% done, estimate finish Sun May 11 23:55:35 2008
14.84% done, estimate finish Sun May 11 23:55:34 2008
14.86% done, estimate finish Sun May 11 23:55:33 2008
14.89% done, estimate finish Sun May 11 23:55:32 2008
14.92% done, estimate finish Sun May 11 23:55:31 2008
14.94% done, estimate finish Sun May 11 23:55:31 2008
14.97% done, estimate finish Sun May 11 23:55:36 2008
14.99% done, estimate finish Sun May 11 23:55:35 2008
15.02% done, estimate finish Sun May 11 23:55:35 2008
15.04% done, estimate finish Sun May 11 23:55:34 2008
15.07% done, estimate finish Sun May 11 23:55:33 2008
15.10% done, estimate finish Sun May 11 23:55:32 2008
15.12% done, estimate finish Sun May 11 23:55:31 2008
15.15% done, estimate finish Sun May 11 23:55:30 2008
15.17% done, estimate finish Sun May 11 23:55:29 2008
15.20% done, estimate finish Sun May 11 23:55:28 2008
15.23% done, estimate finish Sun May 11 23:55:27 2008
15.25% done, estimate finish Sun May 11 23:55:27 2008
15.28% done, estimate finish Sun May 11 23:55:32 2008
15.30% done, estimate finish Sun May 11 23:55:31 2008
15.33% done, estimate finish Sun May 11 23:55:30 2008
15.35% done, estimate finish Sun May 11 23:55:30 2008
15.38% done, estimate finish Sun May 11 23:55:29 2008
15.41% done, estimate finish Sun May 11 23:55:28 2008
15.43% done, estimate finish Sun May 11 23:55:27 2008
15.46% done, estimate finish Sun May 11 23:55:26 2008
15.48% done, estimate finish Sun May 11 23:55:25 2008
15.51% done, estimate finish Sun May 11 23:55:24 2008
15.53% done, estimate finish Sun May 11 23:55:23 2008
15.56% done, estimate finish Sun May 11 23:55:23 2008
15.59% done, estimate finish Sun May 11 23:55:28 2008
15.61% done, estimate finish Sun May 11 23:55:27 2008
15.64% done, estimate finish Sun May 11 23:55:26 2008
15.66% done, estimate finish Sun May 11 23:55:26 2008
15.69% done, estimate finish Sun May 11 23:55:25 2008
15.72% done, estimate finish Sun May 11 23:55:24 2008
15.74% done, estimate finish Sun May 11 23:55:23 2008
15.77% done, estimate finish Sun May 11 23:55:22 2008
15.79% done, estimate finish Sun May 11 23:55:21 2008
15.82% done, estimate finish Sun May 11 23:55:21 2008
15.84% done, estimate finish Sun May 11 23:55:20 2008
15.87% done, estimate finish Sun May 11 23:55:19 2008
15.90% done, estimate finish Sun May 11 23:55:24 2008
15.92% done, estimate finish Sun May 11 23:55:24 2008
15.95% done, estimate finish Sun May 11 23:55:23 2008
15.97% done, estimate finish Sun May 11 23:55:22 2008
16.00% done, estimate finish Sun May 11 23:55:21 2008
16.03% done, estimate finish Sun May 11 23:55:20 2008
16.05% done, estimate finish Sun May 11 23:55:19 2008
16.08% done, estimate finish Sun May 11 23:55:19 2008
16.10% done, estimate finish Sun May 11 23:55:18 2008
16.13% done, estimate finish Sun May 11 23:55:17 2008
16.15% done, estimate finish Sun May 11 23:55:16 2008
16.18% done, estimate finish Sun May 11 23:55:15 2008
16.21% done, estimate finish Sun May 11 23:55:21 2008
16.23% done, estimate finish Sun May 11 23:55:20 2008
16.26% done, estimate finish Sun May 11 23:55:19 2008
16.28% done, estimate finish Sun May 11 23:55:18 2008
16.31% done, estimate finish Sun May 11 23:55:17 2008
16.33% done, estimate finish Sun May 11 23:55:17 2008
16.36% done, estimate finish Sun May 11 23:55:16 2008
16.39% done, estimate finish Sun May 11 23:55:15 2008
16.41% done, estimate finish Sun May 11 23:55:14 2008
16.44% done, estimate finish Sun May 11 23:55:13 2008
16.46% done, estimate finish Sun May 11 23:55:13 2008
16.49% done, estimate finish Sun May 11 23:55:12 2008
16.52% done, estimate finish Sun May 11 23:55:17 2008
16.54% done, estimate finish Sun May 11 23:55:16 2008
16.57% done, estimate finish Sun May 11 23:55:16 2008
16.59% done, estimate finish Sun May 11 23:55:15 2008
16.62% done, estimate finish Sun May 11 23:55:14 2008
16.64% done, estimate finish Sun May 11 23:55:13 2008
16.67% done, estimate finish Sun May 11 23:55:12 2008
16.70% done, estimate finish Sun May 11 23:55:12 2008
16.72% done, estimate finish Sun May 11 23:55:11 2008
16.75% done, estimate finish Sun May 11 23:55:10 2008
16.77% done, estimate finish Sun May 11 23:55:09 2008
16.80% done, estimate finish Sun May 11 23:55:09 2008
16.83% done, estimate finish Sun May 11 23:55:14 2008
16.85% done, estimate finish Sun May 11 23:55:13 2008
16.88% done, estimate finish Sun May 11 23:55:12 2008
16.90% done, estimate finish Sun May 11 23:55:11 2008
16.93% done, estimate finish Sun May 11 23:55:11 2008
16.95% done, estimate finish Sun May 11 23:55:10 2008
16.98% done, estimate finish Sun May 11 23:55:09 2008
17.01% done, estimate finish Sun May 11 23:55:08 2008
17.03% done, estimate finish Sun May 11 23:55:08 2008
17.06% done, estimate finish Sun May 11 23:55:07 2008
17.08% done, estimate finish Sun May 11 23:55:06 2008
17.11% done, estimate finish Sun May 11 23:55:05 2008
17.14% done, estimate finish Sun May 11 23:55:05 2008
17.16% done, estimate finish Sun May 11 23:55:10 2008
17.19% done, estimate finish Sun May 11 23:55:09 2008
17.21% done, estimate finish Sun May 11 23:55:08 2008
17.24% done, estimate finish Sun May 11 23:55:07 2008
17.26% done, estimate finish Sun May 11 23:55:07 2008
17.29% done, estimate finish Sun May 11 23:55:06 2008
17.32% done, estimate finish Sun May 11 23:55:05 2008
17.34% done, estimate finish Sun May 11 23:55:04 2008
17.37% done, estimate finish Sun May 11 23:55:04 2008
17.39% done, estimate finish Sun May 11 23:55:03 2008
17.42% done, estimate finish Sun May 11 23:55:02 2008
17.44% done, estimate finish Sun May 11 23:55:01 2008
17.47% done, estimate finish Sun May 11 23:55:06 2008
17.50% done, estimate finish Sun May 11 23:55:06 2008
17.52% done, estimate finish Sun May 11 23:55:05 2008
17.55% done, estimate finish Sun May 11 23:55:04 2008
17.57% done, estimate finish Sun May 11 23:55:04 2008
17.60% done, estimate finish Sun May 11 23:55:03 2008
17.62% done, estimate finish Sun May 11 23:55:02 2008
17.65% done, estimate finish Sun May 11 23:55:01 2008
17.68% done, estimate finish Sun May 11 23:55:01 2008
17.70% done, estimate finish Sun May 11 23:55:00 2008
17.73% done, estimate finish Sun May 11 23:54:59 2008
17.75% done, estimate finish Sun May 11 23:54:59 2008
17.78% done, estimate finish Sun May 11 23:54:58 2008
17.81% done, estimate finish Sun May 11 23:55:03 2008
17.83% done, estimate finish Sun May 11 23:55:02 2008
17.86% done, estimate finish Sun May 11 23:55:01 2008
17.88% done, estimate finish Sun May 11 23:55:01 2008
17.91% done, estimate finish Sun May 11 23:55:00 2008
17.93% done, estimate finish Sun May 11 23:54:59 2008
17.96% done, estimate finish Sun May 11 23:54:58 2008
17.99% done, estimate finish Sun May 11 23:54:58 2008
18.01% done, estimate finish Sun May 11 23:54:57 2008
18.04% done, estimate finish Sun May 11 23:54:56 2008
18.06% done, estimate finish Sun May 11 23:54:56 2008
18.09% done, estimate finish Sun May 11 23:54:55 2008
18.12% done, estimate finish Sun May 11 23:55:00 2008
18.14% done, estimate finish Sun May 11 23:54:59 2008
18.17% done, estimate finish Sun May 11 23:54:58 2008
18.19% done, estimate finish Sun May 11 23:54:58 2008
18.22% done, estimate finish Sun May 11 23:54:57 2008
18.24% done, estimate finish Sun May 11 23:54:56 2008
18.27% done, estimate finish Sun May 11 23:54:56 2008
18.30% done, estimate finish Sun May 11 23:54:55 2008
18.32% done, estimate finish Sun May 11 23:54:54 2008
18.35% done, estimate finish Sun May 11 23:54:54 2008
18.37% done, estimate finish Sun May 11 23:54:53 2008
18.40% done, estimate finish Sun May 11 23:54:52 2008
18.42% done, estimate finish Sun May 11 23:54:52 2008
18.45% done, estimate finish Sun May 11 23:54:56 2008
18.48% done, estimate finish Sun May 11 23:54:56 2008
18.50% done, estimate finish Sun May 11 23:54:55 2008
18.53% done, estimate finish Sun May 11 23:54:54 2008
18.55% done, estimate finish Sun May 11 23:54:54 2008
18.58% done, estimate finish Sun May 11 23:54:53 2008
18.61% done, estimate finish Sun May 11 23:54:52 2008
18.63% done, estimate finish Sun May 11 23:54:52 2008
18.66% done, estimate finish Sun May 11 23:54:51 2008
18.68% done, estimate finish Sun May 11 23:54:50 2008
18.71% done, estimate finish Sun May 11 23:54:50 2008
18.74% done, estimate finish Sun May 11 23:54:49 2008
18.76% done, estimate finish Sun May 11 23:54:54 2008
18.79% done, estimate finish Sun May 11 23:54:53 2008
18.81% done, estimate finish Sun May 11 23:54:52 2008
18.84% done, estimate finish Sun May 11 23:54:52 2008
18.86% done, estimate finish Sun May 11 23:54:51 2008
18.89% done, estimate finish Sun May 11 23:54:50 2008
18.92% done, estimate finish Sun May 11 23:54:50 2008
18.94% done, estimate finish Sun May 11 23:54:49 2008
18.97% done, estimate finish Sun May 11 23:54:48 2008
18.99% done, estimate finish Sun May 11 23:54:48 2008
19.02% done, estimate finish Sun May 11 23:54:47 2008
19.04% done, estimate finish Sun May 11 23:54:46 2008
19.07% done, estimate finish Sun May 11 23:54:46 2008
19.10% done, estimate finish Sun May 11 23:54:50 2008
19.12% done, estimate finish Sun May 11 23:54:50 2008
19.15% done, estimate finish Sun May 11 23:54:49 2008
19.17% done, estimate finish Sun May 11 23:54:48 2008
19.20% done, estimate finish Sun May 11 23:54:48 2008
19.22% done, estimate finish Sun May 11 23:54:47 2008
19.25% done, estimate finish Sun May 11 23:54:46 2008
19.28% done, estimate finish Sun May 11 23:54:46 2008
19.30% done, estimate finish Sun May 11 23:54:45 2008
19.33% done, estimate finish Sun May 11 23:54:44 2008
19.35% done, estimate finish Sun May 11 23:54:44 2008
19.38% done, estimate finish Sun May 11 23:54:43 2008
19.41% done, estimate finish Sun May 11 23:54:43 2008
19.43% done, estimate finish Sun May 11 23:54:47 2008
19.46% done, estimate finish Sun May 11 23:54:46 2008
19.48% done, estimate finish Sun May 11 23:54:46 2008
19.51% done, estimate finish Sun May 11 23:54:45 2008
19.53% done, estimate finish Sun May 11 23:54:45 2008
19.56% done, estimate finish Sun May 11 23:54:44 2008
19.59% done, estimate finish Sun May 11 23:54:43 2008
19.61% done, estimate finish Sun May 11 23:54:43 2008
19.64% done, estimate finish Sun May 11 23:54:42 2008
19.66% done, estimate finish Sun May 11 23:54:41 2008
19.69% done, estimate finish Sun May 11 23:54:41 2008
19.72% done, estimate finish Sun May 11 23:54:40 2008
19.74% done, estimate finish Sun May 11 23:54:45 2008
19.77% done, estimate finish Sun May 11 23:54:44 2008
19.79% done, estimate finish Sun May 11 23:54:43 2008
19.82% done, estimate finish Sun May 11 23:54:43 2008
19.84% done, estimate finish Sun May 11 23:54:42 2008
19.87% done, estimate finish Sun May 11 23:54:42 2008
19.90% done, estimate finish Sun May 11 23:54:41 2008
19.92% done, estimate finish Sun May 11 23:54:40 2008
19.95% done, estimate finish Sun May 11 23:54:40 2008
19.97% done, estimate finish Sun May 11 23:54:39 2008
20.00% done, estimate finish Sun May 11 23:54:39 2008
20.03% done, estimate finish Sun May 11 23:54:38 2008
20.05% done, estimate finish Sun May 11 23:54:37 2008
20.08% done, estimate finish Sun May 11 23:54:42 2008
20.10% done, estimate finish Sun May 11 23:54:41 2008
20.13% done, estimate finish Sun May 11 23:54:40 2008
20.15% done, estimate finish Sun May 11 23:54:40 2008
20.18% done, estimate finish Sun May 11 23:54:39 2008
20.21% done, estimate finish Sun May 11 23:54:39 2008
20.23% done, estimate finish Sun May 11 23:54:38 2008
20.26% done, estimate finish Sun May 11 23:54:37 2008
20.28% done, estimate finish Sun May 11 23:54:37 2008
20.31% done, estimate finish Sun May 11 23:54:36 2008
20.33% done, estimate finish Sun May 11 23:54:36 2008
20.36% done, estimate finish Sun May 11 23:54:35 2008
20.39% done, estimate finish Sun May 11 23:54:35 2008
20.41% done, estimate finish Sun May 11 23:54:39 2008
20.44% done, estimate finish Sun May 11 23:54:38 2008
20.46% done, estimate finish Sun May 11 23:54:38 2008
20.49% done, estimate finish Sun May 11 23:54:37 2008
20.52% done, estimate finish Sun May 11 23:54:36 2008
20.54% done, estimate finish Sun May 11 23:54:36 2008
20.57% done, estimate finish Sun May 11 23:54:35 2008
20.59% done, estimate finish Sun May 11 23:54:35 2008
20.62% done, estimate finish Sun May 11 23:54:34 2008
20.64% done, estimate finish Sun May 11 23:54:34 2008
20.67% done, estimate finish Sun May 11 23:54:33 2008
20.70% done, estimate finish Sun May 11 23:54:32 2008
20.72% done, estimate finish Sun May 11 23:54:32 2008
20.75% done, estimate finish Sun May 11 23:54:36 2008
20.77% done, estimate finish Sun May 11 23:54:35 2008
20.80% done, estimate finish Sun May 11 23:54:35 2008
20.82% done, estimate finish Sun May 11 23:54:34 2008
20.85% done, estimate finish Sun May 11 23:54:34 2008
20.88% done, estimate finish Sun May 11 23:54:33 2008
20.90% done, estimate finish Sun May 11 23:54:33 2008
20.93% done, estimate finish Sun May 11 23:54:32 2008
20.95% done, estimate finish Sun May 11 23:54:31 2008
20.98% done, estimate finish Sun May 11 23:54:31 2008
21.01% done, estimate finish Sun May 11 23:54:30 2008
21.03% done, estimate finish Sun May 11 23:54:30 2008
21.06% done, estimate finish Sun May 11 23:54:29 2008
21.08% done, estimate finish Sun May 11 23:54:33 2008
21.11% done, estimate finish Sun May 11 23:54:33 2008
21.13% done, estimate finish Sun May 11 23:54:32 2008
21.16% done, estimate finish Sun May 11 23:54:32 2008
21.19% done, estimate finish Sun May 11 23:54:31 2008
21.21% done, estimate finish Sun May 11 23:54:31 2008
21.24% done, estimate finish Sun May 11 23:54:30 2008
21.26% done, estimate finish Sun May 11 23:54:29 2008
21.29% done, estimate finish Sun May 11 23:54:29 2008
21.32% done, estimate finish Sun May 11 23:54:28 2008
21.34% done, estimate finish Sun May 11 23:54:28 2008
21.37% done, estimate finish Sun May 11 23:54:27 2008
21.39% done, estimate finish Sun May 11 23:54:27 2008
21.42% done, estimate finish Sun May 11 23:54:31 2008
21.44% done, estimate finish Sun May 11 23:54:30 2008
21.47% done, estimate finish Sun May 11 23:54:30 2008
21.50% done, estimate finish Sun May 11 23:54:29 2008
21.52% done, estimate finish Sun May 11 23:54:28 2008
21.55% done, estimate finish Sun May 11 23:54:28 2008
21.57% done, estimate finish Sun May 11 23:54:27 2008
21.60% done, estimate finish Sun May 11 23:54:27 2008
21.63% done, estimate finish Sun May 11 23:54:26 2008
21.65% done, estimate finish Sun May 11 23:54:26 2008
21.68% done, estimate finish Sun May 11 23:54:25 2008
21.70% done, estimate finish Sun May 11 23:54:25 2008
21.73% done, estimate finish Sun May 11 23:54:24 2008
21.75% done, estimate finish Sun May 11 23:54:28 2008
21.78% done, estimate finish Sun May 11 23:54:28 2008
21.81% done, estimate finish Sun May 11 23:54:27 2008
21.83% done, estimate finish Sun May 11 23:54:27 2008
21.86% done, estimate finish Sun May 11 23:54:26 2008
21.88% done, estimate finish Sun May 11 23:54:25 2008
21.91% done, estimate finish Sun May 11 23:54:25 2008
21.93% done, estimate finish Sun May 11 23:54:24 2008
21.96% done, estimate finish Sun May 11 23:54:24 2008
21.99% done, estimate finish Sun May 11 23:54:23 2008
22.01% done, estimate finish Sun May 11 23:54:23 2008
22.04% done, estimate finish Sun May 11 23:54:22 2008
22.06% done, estimate finish Sun May 11 23:54:22 2008
22.09% done, estimate finish Sun May 11 23:54:26 2008
22.12% done, estimate finish Sun May 11 23:54:25 2008
22.14% done, estimate finish Sun May 11 23:54:25 2008
22.17% done, estimate finish Sun May 11 23:54:24 2008
22.19% done, estimate finish Sun May 11 23:54:24 2008
22.22% done, estimate finish Sun May 11 23:54:23 2008
22.24% done, estimate finish Sun May 11 23:54:23 2008
22.27% done, estimate finish Sun May 11 23:54:22 2008
22.30% done, estimate finish Sun May 11 23:54:22 2008
22.32% done, estimate finish Sun May 11 23:54:21 2008
22.35% done, estimate finish Sun May 11 23:54:20 2008
22.37% done, estimate finish Sun May 11 23:54:20 2008
22.40% done, estimate finish Sun May 11 23:54:19 2008
22.43% done, estimate finish Sun May 11 23:54:23 2008
22.45% done, estimate finish Sun May 11 23:54:23 2008
22.48% done, estimate finish Sun May 11 23:54:22 2008
22.50% done, estimate finish Sun May 11 23:54:22 2008
22.53% done, estimate finish Sun May 11 23:54:21 2008
22.55% done, estimate finish Sun May 11 23:54:21 2008
22.58% done, estimate finish Sun May 11 23:54:20 2008
22.61% done, estimate finish Sun May 11 23:54:20 2008
22.63% done, estimate finish Sun May 11 23:54:19 2008
22.66% done, estimate finish Sun May 11 23:54:19 2008
22.68% done, estimate finish Sun May 11 23:54:18 2008
22.71% done, estimate finish Sun May 11 23:54:18 2008
22.73% done, estimate finish Sun May 11 23:54:17 2008
22.76% done, estimate finish Sun May 11 23:54:21 2008
22.79% done, estimate finish Sun May 11 23:54:21 2008
22.81% done, estimate finish Sun May 11 23:54:20 2008
22.84% done, estimate finish Sun May 11 23:54:19 2008
22.86% done, estimate finish Sun May 11 23:54:19 2008
22.89% done, estimate finish Sun May 11 23:54:18 2008
22.91% done, estimate finish Sun May 11 23:54:18 2008
22.94% done, estimate finish Sun May 11 23:54:17 2008
22.97% done, estimate finish Sun May 11 23:54:17 2008
22.99% done, estimate finish Sun May 11 23:54:16 2008
23.02% done, estimate finish Sun May 11 23:54:16 2008
23.04% done, estimate finish Sun May 11 23:54:15 2008
23.07% done, estimate finish Sun May 11 23:54:15 2008
23.10% done, estimate finish Sun May 11 23:54:19 2008
23.12% done, estimate finish Sun May 11 23:54:18 2008
23.15% done, estimate finish Sun May 11 23:54:18 2008
23.17% done, estimate finish Sun May 11 23:54:17 2008
23.20% done, estimate finish Sun May 11 23:54:17 2008
23.22% done, estimate finish Sun May 11 23:54:16 2008
23.25% done, estimate finish Sun May 11 23:54:16 2008
23.28% done, estimate finish Sun May 11 23:54:15 2008
23.30% done, estimate finish Sun May 11 23:54:15 2008
23.33% done, estimate finish Sun May 11 23:54:14 2008
23.35% done, estimate finish Sun May 11 23:54:14 2008
23.38% done, estimate finish Sun May 11 23:54:13 2008
23.41% done, estimate finish Sun May 11 23:54:13 2008
23.43% done, estimate finish Sun May 11 23:54:12 2008
23.46% done, estimate finish Sun May 11 23:54:16 2008
23.48% done, estimate finish Sun May 11 23:54:16 2008
23.51% done, estimate finish Sun May 11 23:54:15 2008
23.53% done, estimate finish Sun May 11 23:54:15 2008
23.56% done, estimate finish Sun May 11 23:54:14 2008
23.59% done, estimate finish Sun May 11 23:54:14 2008
23.61% done, estimate finish Sun May 11 23:54:13 2008
23.64% done, estimate finish Sun May 11 23:54:13 2008
23.66% done, estimate finish Sun May 11 23:54:12 2008
23.69% done, estimate finish Sun May 11 23:54:12 2008
23.72% done, estimate finish Sun May 11 23:54:11 2008
23.74% done, estimate finish Sun May 11 23:54:11 2008
23.77% done, estimate finish Sun May 11 23:54:10 2008
23.79% done, estimate finish Sun May 11 23:54:14 2008
23.82% done, estimate finish Sun May 11 23:54:14 2008
23.84% done, estimate finish Sun May 11 23:54:13 2008
23.87% done, estimate finish Sun May 11 23:54:13 2008
23.90% done, estimate finish Sun May 11 23:54:12 2008
23.92% done, estimate finish Sun May 11 23:54:12 2008
23.95% done, estimate finish Sun May 11 23:54:11 2008
23.97% done, estimate finish Sun May 11 23:54:11 2008
24.00% done, estimate finish Sun May 11 23:54:10 2008
24.02% done, estimate finish Sun May 11 23:54:10 2008
24.05% done, estimate finish Sun May 11 23:54:09 2008
24.08% done, estimate finish Sun May 11 23:54:09 2008
24.10% done, estimate finish Sun May 11 23:54:08 2008
24.13% done, estimate finish Sun May 11 23:54:12 2008
24.15% done, estimate finish Sun May 11 23:54:11 2008
24.18% done, estimate finish Sun May 11 23:54:11 2008
24.21% done, estimate finish Sun May 11 23:54:11 2008
24.23% done, estimate finish Sun May 11 23:54:10 2008
24.26% done, estimate finish Sun May 11 23:54:10 2008
24.28% done, estimate finish Sun May 11 23:54:09 2008
24.31% done, estimate finish Sun May 11 23:54:09 2008
24.33% done, estimate finish Sun May 11 23:54:08 2008
24.36% done, estimate finish Sun May 11 23:54:08 2008
24.39% done, estimate finish Sun May 11 23:54:07 2008
24.41% done, estimate finish Sun May 11 23:54:07 2008
24.44% done, estimate finish Sun May 11 23:54:06 2008
24.46% done, estimate finish Sun May 11 23:54:06 2008
24.49% done, estimate finish Sun May 11 23:54:10 2008
24.52% done, estimate finish Sun May 11 23:54:09 2008
24.54% done, estimate finish Sun May 11 23:54:09 2008
24.57% done, estimate finish Sun May 11 23:54:08 2008
24.59% done, estimate finish Sun May 11 23:54:08 2008
24.62% done, estimate finish Sun May 11 23:54:07 2008
24.64% done, estimate finish Sun May 11 23:54:07 2008
24.67% done, estimate finish Sun May 11 23:54:06 2008
24.70% done, estimate finish Sun May 11 23:54:06 2008
24.72% done, estimate finish Sun May 11 23:54:05 2008
24.75% done, estimate finish Sun May 11 23:54:05 2008
24.77% done, estimate finish Sun May 11 23:54:04 2008
24.80% done, estimate finish Sun May 11 23:54:04 2008
24.82% done, estimate finish Sun May 11 23:54:08 2008
24.85% done, estimate finish Sun May 11 23:54:07 2008
24.88% done, estimate finish Sun May 11 23:54:07 2008
24.90% done, estimate finish Sun May 11 23:54:06 2008
24.93% done, estimate finish Sun May 11 23:54:06 2008
24.95% done, estimate finish Sun May 11 23:54:05 2008
24.98% done, estimate finish Sun May 11 23:54:05 2008
25.01% done, estimate finish Sun May 11 23:54:04 2008
25.03% done, estimate finish Sun May 11 23:54:04 2008
25.06% done, estimate finish Sun May 11 23:54:04 2008
25.08% done, estimate finish Sun May 11 23:54:03 2008
25.11% done, estimate finish Sun May 11 23:54:03 2008
25.13% done, estimate finish Sun May 11 23:54:02 2008
25.16% done, estimate finish Sun May 11 23:54:02 2008
25.19% done, estimate finish Sun May 11 23:54:05 2008
25.21% done, estimate finish Sun May 11 23:54:05 2008
25.24% done, estimate finish Sun May 11 23:54:04 2008
25.26% done, estimate finish Sun May 11 23:54:04 2008
25.29% done, estimate finish Sun May 11 23:54:03 2008
25.32% done, estimate finish Sun May 11 23:54:03 2008
25.34% done, estimate finish Sun May 11 23:54:03 2008
25.37% done, estimate finish Sun May 11 23:54:02 2008
25.39% done, estimate finish Sun May 11 23:54:02 2008
25.42% done, estimate finish Sun May 11 23:54:01 2008
25.44% done, estimate finish Sun May 11 23:54:01 2008
25.47% done, estimate finish Sun May 11 23:54:00 2008
25.50% done, estimate finish Sun May 11 23:54:00 2008
25.52% done, estimate finish Sun May 11 23:54:03 2008
25.55% done, estimate finish Sun May 11 23:54:03 2008
25.57% done, estimate finish Sun May 11 23:54:03 2008
25.60% done, estimate finish Sun May 11 23:54:02 2008
25.63% done, estimate finish Sun May 11 23:54:02 2008
25.65% done, estimate finish Sun May 11 23:54:01 2008
25.68% done, estimate finish Sun May 11 23:54:01 2008
25.70% done, estimate finish Sun May 11 23:54:00 2008
25.73% done, estimate finish Sun May 11 23:54:00 2008
25.75% done, estimate finish Sun May 11 23:54:03 2008
25.78% done, estimate finish Sun May 11 23:54:03 2008
25.81% done, estimate finish Sun May 11 23:54:03 2008
25.83% done, estimate finish Sun May 11 23:54:02 2008
25.86% done, estimate finish Sun May 11 23:54:02 2008
25.88% done, estimate finish Sun May 11 23:54:01 2008
25.91% done, estimate finish Sun May 11 23:54:01 2008
25.93% done, estimate finish Sun May 11 23:54:00 2008
25.96% done, estimate finish Sun May 11 23:54:00 2008
25.99% done, estimate finish Sun May 11 23:54:00 2008
26.01% done, estimate finish Sun May 11 23:53:59 2008
26.04% done, estimate finish Sun May 11 23:53:59 2008
26.06% done, estimate finish Sun May 11 23:53:58 2008
26.09% done, estimate finish Sun May 11 23:53:58 2008
26.11% done, estimate finish Sun May 11 23:54:01 2008
26.14% done, estimate finish Sun May 11 23:54:01 2008
26.17% done, estimate finish Sun May 11 23:54:00 2008
26.19% done, estimate finish Sun May 11 23:54:00 2008
26.22% done, estimate finish Sun May 11 23:54:00 2008
26.24% done, estimate finish Sun May 11 23:53:59 2008
26.27% done, estimate finish Sun May 11 23:53:59 2008
26.30% done, estimate finish Sun May 11 23:53:58 2008
26.32% done, estimate finish Sun May 11 23:53:58 2008
26.35% done, estimate finish Sun May 11 23:53:57 2008
26.37% done, estimate finish Sun May 11 23:53:57 2008
26.40% done, estimate finish Sun May 11 23:53:57 2008
26.42% done, estimate finish Sun May 11 23:53:56 2008
26.45% done, estimate finish Sun May 11 23:53:59 2008
26.48% done, estimate finish Sun May 11 23:53:59 2008
26.50% done, estimate finish Sun May 11 23:53:59 2008
26.53% done, estimate finish Sun May 11 23:53:58 2008
26.55% done, estimate finish Sun May 11 23:53:58 2008
26.58% done, estimate finish Sun May 11 23:53:57 2008
26.61% done, estimate finish Sun May 11 23:53:57 2008
26.63% done, estimate finish Sun May 11 23:53:57 2008
26.66% done, estimate finish Sun May 11 23:53:56 2008
26.68% done, estimate finish Sun May 11 23:53:56 2008
26.71% done, estimate finish Sun May 11 23:53:55 2008
26.73% done, estimate finish Sun May 11 23:53:55 2008
26.76% done, estimate finish Sun May 11 23:53:55 2008
26.79% done, estimate finish Sun May 11 23:53:54 2008
26.81% done, estimate finish Sun May 11 23:53:57 2008
26.84% done, estimate finish Sun May 11 23:53:57 2008
26.86% done, estimate finish Sun May 11 23:53:57 2008
26.89% done, estimate finish Sun May 11 23:53:56 2008
26.91% done, estimate finish Sun May 11 23:53:56 2008
26.94% done, estimate finish Sun May 11 23:53:55 2008
26.97% done, estimate finish Sun May 11 23:53:55 2008
26.99% done, estimate finish Sun May 11 23:53:55 2008
27.02% done, estimate finish Sun May 11 23:53:54 2008
27.04% done, estimate finish Sun May 11 23:53:54 2008
27.07% done, estimate finish Sun May 11 23:53:53 2008
27.10% done, estimate finish Sun May 11 23:53:53 2008
27.12% done, estimate finish Sun May 11 23:53:53 2008
27.15% done, estimate finish Sun May 11 23:53:52 2008
27.17% done, estimate finish Sun May 11 23:53:55 2008
27.20% done, estimate finish Sun May 11 23:53:55 2008
27.22% done, estimate finish Sun May 11 23:53:55 2008
27.25% done, estimate finish Sun May 11 23:53:54 2008
27.28% done, estimate finish Sun May 11 23:53:54 2008
27.30% done, estimate finish Sun May 11 23:53:53 2008
27.33% done, estimate finish Sun May 11 23:53:53 2008
27.35% done, estimate finish Sun May 11 23:53:53 2008
27.38% done, estimate finish Sun May 11 23:53:52 2008
27.41% done, estimate finish Sun May 11 23:53:52 2008
27.43% done, estimate finish Sun May 11 23:53:51 2008
27.46% done, estimate finish Sun May 11 23:53:51 2008
27.48% done, estimate finish Sun May 11 23:53:51 2008
27.51% done, estimate finish Sun May 11 23:53:50 2008
27.53% done, estimate finish Sun May 11 23:53:53 2008
27.56% done, estimate finish Sun May 11 23:53:53 2008
27.59% done, estimate finish Sun May 11 23:53:53 2008
27.61% done, estimate finish Sun May 11 23:53:52 2008
27.64% done, estimate finish Sun May 11 23:53:52 2008
27.66% done, estimate finish Sun May 11 23:53:51 2008
27.69% done, estimate finish Sun May 11 23:53:51 2008
27.72% done, estimate finish Sun May 11 23:53:51 2008
27.74% done, estimate finish Sun May 11 23:53:50 2008
27.77% done, estimate finish Sun May 11 23:53:50 2008
27.79% done, estimate finish Sun May 11 23:53:49 2008
27.82% done, estimate finish Sun May 11 23:53:49 2008
27.84% done, estimate finish Sun May 11 23:53:49 2008
27.87% done, estimate finish Sun May 11 23:53:48 2008
27.90% done, estimate finish Sun May 11 23:53:52 2008
27.92% done, estimate finish Sun May 11 23:53:51 2008
27.95% done, estimate finish Sun May 11 23:53:51 2008
27.97% done, estimate finish Sun May 11 23:53:50 2008
28.00% done, estimate finish Sun May 11 23:53:50 2008
28.02% done, estimate finish Sun May 11 23:53:50 2008
28.05% done, estimate finish Sun May 11 23:53:49 2008
28.08% done, estimate finish Sun May 11 23:53:49 2008
28.10% done, estimate finish Sun May 11 23:53:48 2008
28.13% done, estimate finish Sun May 11 23:53:48 2008
28.15% done, estimate finish Sun May 11 23:53:48 2008
28.18% done, estimate finish Sun May 11 23:53:47 2008
28.21% done, estimate finish Sun May 11 23:53:47 2008
28.23% done, estimate finish Sun May 11 23:53:46 2008
28.26% done, estimate finish Sun May 11 23:53:50 2008
28.28% done, estimate finish Sun May 11 23:53:49 2008
28.31% done, estimate finish Sun May 11 23:53:49 2008
28.33% done, estimate finish Sun May 11 23:53:48 2008
28.36% done, estimate finish Sun May 11 23:53:48 2008
28.39% done, estimate finish Sun May 11 23:53:48 2008
28.41% done, estimate finish Sun May 11 23:53:47 2008
28.44% done, estimate finish Sun May 11 23:53:47 2008
28.46% done, estimate finish Sun May 11 23:53:47 2008
28.49% done, estimate finish Sun May 11 23:53:46 2008
28.52% done, estimate finish Sun May 11 23:53:46 2008
28.54% done, estimate finish Sun May 11 23:53:45 2008
28.57% done, estimate finish Sun May 11 23:53:45 2008
28.59% done, estimate finish Sun May 11 23:53:48 2008
28.62% done, estimate finish Sun May 11 23:53:48 2008
28.64% done, estimate finish Sun May 11 23:53:47 2008
28.67% done, estimate finish Sun May 11 23:53:47 2008
28.70% done, estimate finish Sun May 11 23:53:47 2008
28.72% done, estimate finish Sun May 11 23:53:46 2008
28.75% done, estimate finish Sun May 11 23:53:46 2008
28.77% done, estimate finish Sun May 11 23:53:46 2008
28.80% done, estimate finish Sun May 11 23:53:45 2008
28.82% done, estimate finish Sun May 11 23:53:45 2008
28.85% done, estimate finish Sun May 11 23:53:44 2008
28.88% done, estimate finish Sun May 11 23:53:44 2008
28.90% done, estimate finish Sun May 11 23:53:44 2008
28.93% done, estimate finish Sun May 11 23:53:43 2008
28.95% done, estimate finish Sun May 11 23:53:43 2008
28.98% done, estimate finish Sun May 11 23:53:46 2008
29.00% done, estimate finish Sun May 11 23:53:46 2008
29.03% done, estimate finish Sun May 11 23:53:45 2008
29.06% done, estimate finish Sun May 11 23:53:45 2008
29.08% done, estimate finish Sun May 11 23:53:45 2008
29.11% done, estimate finish Sun May 11 23:53:44 2008
29.13% done, estimate finish Sun May 11 23:53:44 2008
29.16% done, estimate finish Sun May 11 23:53:43 2008
29.19% done, estimate finish Sun May 11 23:53:43 2008
29.21% done, estimate finish Sun May 11 23:53:43 2008
29.24% done, estimate finish Sun May 11 23:53:42 2008
29.26% done, estimate finish Sun May 11 23:53:42 2008
29.29% done, estimate finish Sun May 11 23:53:42 2008
29.31% done, estimate finish Sun May 11 23:53:41 2008
29.34% done, estimate finish Sun May 11 23:53:44 2008
29.37% done, estimate finish Sun May 11 23:53:44 2008
29.39% done, estimate finish Sun May 11 23:53:44 2008
29.42% done, estimate finish Sun May 11 23:53:43 2008
29.44% done, estimate finish Sun May 11 23:53:43 2008
29.47% done, estimate finish Sun May 11 23:53:42 2008
29.50% done, estimate finish Sun May 11 23:53:42 2008
29.52% done, estimate finish Sun May 11 23:53:42 2008
29.55% done, estimate finish Sun May 11 23:53:41 2008
29.57% done, estimate finish Sun May 11 23:53:41 2008
29.60% done, estimate finish Sun May 11 23:53:41 2008
29.62% done, estimate finish Sun May 11 23:53:40 2008
29.65% done, estimate finish Sun May 11 23:53:40 2008
29.68% done, estimate finish Sun May 11 23:53:40 2008
29.70% done, estimate finish Sun May 11 23:53:43 2008
29.73% done, estimate finish Sun May 11 23:53:42 2008
29.75% done, estimate finish Sun May 11 23:53:42 2008
29.78% done, estimate finish Sun May 11 23:53:42 2008
29.81% done, estimate finish Sun May 11 23:53:41 2008
29.83% done, estimate finish Sun May 11 23:53:41 2008
29.86% done, estimate finish Sun May 11 23:53:40 2008
29.88% done, estimate finish Sun May 11 23:53:40 2008
29.91% done, estimate finish Sun May 11 23:53:40 2008
29.93% done, estimate finish Sun May 11 23:53:39 2008
29.96% done, estimate finish Sun May 11 23:53:39 2008
29.99% done, estimate finish Sun May 11 23:53:39 2008
30.01% done, estimate finish Sun May 11 23:53:38 2008
30.04% done, estimate finish Sun May 11 23:53:38 2008
30.06% done, estimate finish Sun May 11 23:53:41 2008
30.09% done, estimate finish Sun May 11 23:53:41 2008
30.11% done, estimate finish Sun May 11 23:53:40 2008
30.14% done, estimate finish Sun May 11 23:53:40 2008
30.17% done, estimate finish Sun May 11 23:53:40 2008
30.19% done, estimate finish Sun May 11 23:53:39 2008
30.22% done, estimate finish Sun May 11 23:53:39 2008
30.24% done, estimate finish Sun May 11 23:53:39 2008
30.27% done, estimate finish Sun May 11 23:53:38 2008
30.30% done, estimate finish Sun May 11 23:53:38 2008
30.32% done, estimate finish Sun May 11 23:53:37 2008
30.35% done, estimate finish Sun May 11 23:53:37 2008
30.37% done, estimate finish Sun May 11 23:53:37 2008
30.40% done, estimate finish Sun May 11 23:53:36 2008
30.42% done, estimate finish Sun May 11 23:53:39 2008
30.45% done, estimate finish Sun May 11 23:53:39 2008
30.48% done, estimate finish Sun May 11 23:53:39 2008
30.50% done, estimate finish Sun May 11 23:53:38 2008
30.53% done, estimate finish Sun May 11 23:53:38 2008
30.55% done, estimate finish Sun May 11 23:53:38 2008
30.58% done, estimate finish Sun May 11 23:53:37 2008
30.61% done, estimate finish Sun May 11 23:53:37 2008
30.63% done, estimate finish Sun May 11 23:53:37 2008
30.66% done, estimate finish Sun May 11 23:53:36 2008
30.68% done, estimate finish Sun May 11 23:53:36 2008
30.71% done, estimate finish Sun May 11 23:53:36 2008
30.73% done, estimate finish Sun May 11 23:53:35 2008
30.76% done, estimate finish Sun May 11 23:53:35 2008
30.79% done, estimate finish Sun May 11 23:53:38 2008
30.81% done, estimate finish Sun May 11 23:53:37 2008
30.84% done, estimate finish Sun May 11 23:53:37 2008
30.86% done, estimate finish Sun May 11 23:53:37 2008
30.89% done, estimate finish Sun May 11 23:53:36 2008
30.91% done, estimate finish Sun May 11 23:53:36 2008
30.94% done, estimate finish Sun May 11 23:53:36 2008
30.97% done, estimate finish Sun May 11 23:53:35 2008
30.99% done, estimate finish Sun May 11 23:53:35 2008
31.02% done, estimate finish Sun May 11 23:53:35 2008
31.04% done, estimate finish Sun May 11 23:53:34 2008
31.07% done, estimate finish Sun May 11 23:53:34 2008
31.10% done, estimate finish Sun May 11 23:53:34 2008
31.12% done, estimate finish Sun May 11 23:53:33 2008
31.15% done, estimate finish Sun May 11 23:53:33 2008
31.17% done, estimate finish Sun May 11 23:53:36 2008
31.20% done, estimate finish Sun May 11 23:53:36 2008
31.22% done, estimate finish Sun May 11 23:53:35 2008
31.25% done, estimate finish Sun May 11 23:53:35 2008
31.28% done, estimate finish Sun May 11 23:53:35 2008
31.30% done, estimate finish Sun May 11 23:53:34 2008
31.33% done, estimate finish Sun May 11 23:53:34 2008
31.35% done, estimate finish Sun May 11 23:53:34 2008
31.38% done, estimate finish Sun May 11 23:53:33 2008
31.41% done, estimate finish Sun May 11 23:53:33 2008
31.43% done, estimate finish Sun May 11 23:53:33 2008
31.46% done, estimate finish Sun May 11 23:53:32 2008
31.48% done, estimate finish Sun May 11 23:53:32 2008
31.51% done, estimate finish Sun May 11 23:53:32 2008
31.53% done, estimate finish Sun May 11 23:53:34 2008
31.56% done, estimate finish Sun May 11 23:53:34 2008
31.59% done, estimate finish Sun May 11 23:53:34 2008
31.61% done, estimate finish Sun May 11 23:53:33 2008
31.64% done, estimate finish Sun May 11 23:53:33 2008
31.66% done, estimate finish Sun May 11 23:53:33 2008
31.69% done, estimate finish Sun May 11 23:53:32 2008
31.71% done, estimate finish Sun May 11 23:53:32 2008
31.74% done, estimate finish Sun May 11 23:53:32 2008
31.77% done, estimate finish Sun May 11 23:53:31 2008
31.79% done, estimate finish Sun May 11 23:53:31 2008
31.82% done, estimate finish Sun May 11 23:53:31 2008
31.84% done, estimate finish Sun May 11 23:53:30 2008
31.87% done, estimate finish Sun May 11 23:53:30 2008
31.90% done, estimate finish Sun May 11 23:53:33 2008
31.92% done, estimate finish Sun May 11 23:53:33 2008
31.95% done, estimate finish Sun May 11 23:53:32 2008
31.97% done, estimate finish Sun May 11 23:53:32 2008
32.00% done, estimate finish Sun May 11 23:53:32 2008
32.02% done, estimate finish Sun May 11 23:53:31 2008
32.05% done, estimate finish Sun May 11 23:53:31 2008
32.08% done, estimate finish Sun May 11 23:53:31 2008
32.10% done, estimate finish Sun May 11 23:53:30 2008
32.13% done, estimate finish Sun May 11 23:53:30 2008
32.15% done, estimate finish Sun May 11 23:53:30 2008
32.18% done, estimate finish Sun May 11 23:53:29 2008
32.21% done, estimate finish Sun May 11 23:53:29 2008
32.23% done, estimate finish Sun May 11 23:53:29 2008
32.26% done, estimate finish Sun May 11 23:53:28 2008
32.28% done, estimate finish Sun May 11 23:53:31 2008
32.31% done, estimate finish Sun May 11 23:53:31 2008
32.33% done, estimate finish Sun May 11 23:53:31 2008
32.36% done, estimate finish Sun May 11 23:53:30 2008
32.39% done, estimate finish Sun May 11 23:53:30 2008
32.41% done, estimate finish Sun May 11 23:53:30 2008
32.44% done, estimate finish Sun May 11 23:53:29 2008
32.46% done, estimate finish Sun May 11 23:53:29 2008
32.49% done, estimate finish Sun May 11 23:53:29 2008
32.51% done, estimate finish Sun May 11 23:53:28 2008
32.54% done, estimate finish Sun May 11 23:53:28 2008
32.57% done, estimate finish Sun May 11 23:53:28 2008
32.59% done, estimate finish Sun May 11 23:53:27 2008
32.62% done, estimate finish Sun May 11 23:53:27 2008
32.64% done, estimate finish Sun May 11 23:53:30 2008
32.67% done, estimate finish Sun May 11 23:53:29 2008
32.69% done, estimate finish Sun May 11 23:53:29 2008
32.72% done, estimate finish Sun May 11 23:53:29 2008
32.75% done, estimate finish Sun May 11 23:53:29 2008
32.77% done, estimate finish Sun May 11 23:53:28 2008
32.80% done, estimate finish Sun May 11 23:53:28 2008
32.82% done, estimate finish Sun May 11 23:53:28 2008
32.85% done, estimate finish Sun May 11 23:53:27 2008
32.88% done, estimate finish Sun May 11 23:53:27 2008
32.90% done, estimate finish Sun May 11 23:53:27 2008
32.93% done, estimate finish Sun May 11 23:53:26 2008
32.95% done, estimate finish Sun May 11 23:53:26 2008
32.98% done, estimate finish Sun May 11 23:53:26 2008
33.00% done, estimate finish Sun May 11 23:53:25 2008
33.03% done, estimate finish Sun May 11 23:53:28 2008
33.06% done, estimate finish Sun May 11 23:53:28 2008
33.08% done, estimate finish Sun May 11 23:53:28 2008
33.11% done, estimate finish Sun May 11 23:53:27 2008
33.13% done, estimate finish Sun May 11 23:53:27 2008
33.16% done, estimate finish Sun May 11 23:53:27 2008
33.19% done, estimate finish Sun May 11 23:53:26 2008
33.21% done, estimate finish Sun May 11 23:53:26 2008
33.24% done, estimate finish Sun May 11 23:53:26 2008
33.26% done, estimate finish Sun May 11 23:53:25 2008
33.29% done, estimate finish Sun May 11 23:53:25 2008
33.31% done, estimate finish Sun May 11 23:53:25 2008
33.34% done, estimate finish Sun May 11 23:53:24 2008
33.37% done, estimate finish Sun May 11 23:53:24 2008
33.39% done, estimate finish Sun May 11 23:53:24 2008
33.42% done, estimate finish Sun May 11 23:53:26 2008
33.44% done, estimate finish Sun May 11 23:53:26 2008
33.47% done, estimate finish Sun May 11 23:53:26 2008
33.50% done, estimate finish Sun May 11 23:53:26 2008
33.52% done, estimate finish Sun May 11 23:53:25 2008
33.55% done, estimate finish Sun May 11 23:53:25 2008
33.57% done, estimate finish Sun May 11 23:53:25 2008
33.60% done, estimate finish Sun May 11 23:53:24 2008
33.62% done, estimate finish Sun May 11 23:53:24 2008
33.65% done, estimate finish Sun May 11 23:53:24 2008
33.68% done, estimate finish Sun May 11 23:53:23 2008
33.70% done, estimate finish Sun May 11 23:53:23 2008
33.73% done, estimate finish Sun May 11 23:53:23 2008
33.75% done, estimate finish Sun May 11 23:53:23 2008
33.78% done, estimate finish Sun May 11 23:53:25 2008
33.80% done, estimate finish Sun May 11 23:53:25 2008
33.83% done, estimate finish Sun May 11 23:53:25 2008
33.86% done, estimate finish Sun May 11 23:53:24 2008
33.88% done, estimate finish Sun May 11 23:53:24 2008
33.91% done, estimate finish Sun May 11 23:53:24 2008
33.93% done, estimate finish Sun May 11 23:53:23 2008
33.96% done, estimate finish Sun May 11 23:53:23 2008
33.99% done, estimate finish Sun May 11 23:53:23 2008
34.01% done, estimate finish Sun May 11 23:53:22 2008
34.04% done, estimate finish Sun May 11 23:53:22 2008
34.06% done, estimate finish Sun May 11 23:53:22 2008
34.09% done, estimate finish Sun May 11 23:53:22 2008
34.11% done, estimate finish Sun May 11 23:53:21 2008
34.14% done, estimate finish Sun May 11 23:53:21 2008
34.17% done, estimate finish Sun May 11 23:53:24 2008
34.19% done, estimate finish Sun May 11 23:53:23 2008
34.22% done, estimate finish Sun May 11 23:53:23 2008
34.24% done, estimate finish Sun May 11 23:53:23 2008
34.27% done, estimate finish Sun May 11 23:53:22 2008
34.30% done, estimate finish Sun May 11 23:53:22 2008
34.32% done, estimate finish Sun May 11 23:53:22 2008
34.35% done, estimate finish Sun May 11 23:53:22 2008
34.37% done, estimate finish Sun May 11 23:53:21 2008
34.40% done, estimate finish Sun May 11 23:53:21 2008
34.42% done, estimate finish Sun May 11 23:53:21 2008
34.45% done, estimate finish Sun May 11 23:53:20 2008
34.48% done, estimate finish Sun May 11 23:53:20 2008
34.50% done, estimate finish Sun May 11 23:53:20 2008
34.53% done, estimate finish Sun May 11 23:53:19 2008
34.55% done, estimate finish Sun May 11 23:53:22 2008
34.58% done, estimate finish Sun May 11 23:53:22 2008
34.60% done, estimate finish Sun May 11 23:53:22 2008
34.63% done, estimate finish Sun May 11 23:53:21 2008
34.66% done, estimate finish Sun May 11 23:53:21 2008
34.68% done, estimate finish Sun May 11 23:53:21 2008
34.71% done, estimate finish Sun May 11 23:53:20 2008
34.73% done, estimate finish Sun May 11 23:53:20 2008
34.76% done, estimate finish Sun May 11 23:53:20 2008
34.79% done, estimate finish Sun May 11 23:53:19 2008
34.81% done, estimate finish Sun May 11 23:53:19 2008
34.84% done, estimate finish Sun May 11 23:53:19 2008
34.86% done, estimate finish Sun May 11 23:53:19 2008
34.89% done, estimate finish Sun May 11 23:53:18 2008
34.91% done, estimate finish Sun May 11 23:53:18 2008
34.94% done, estimate finish Sun May 11 23:53:21 2008
34.97% done, estimate finish Sun May 11 23:53:20 2008
34.99% done, estimate finish Sun May 11 23:53:20 2008
35.02% done, estimate finish Sun May 11 23:53:20 2008
35.04% done, estimate finish Sun May 11 23:53:19 2008
35.07% done, estimate finish Sun May 11 23:53:19 2008
35.10% done, estimate finish Sun May 11 23:53:19 2008
35.12% done, estimate finish Sun May 11 23:53:19 2008
35.15% done, estimate finish Sun May 11 23:53:18 2008
35.17% done, estimate finish Sun May 11 23:53:18 2008
35.20% done, estimate finish Sun May 11 23:53:18 2008
35.22% done, estimate finish Sun May 11 23:53:17 2008
35.25% done, estimate finish Sun May 11 23:53:17 2008
35.28% done, estimate finish Sun May 11 23:53:17 2008
35.30% done, estimate finish Sun May 11 23:53:19 2008
35.33% done, estimate finish Sun May 11 23:53:19 2008
35.35% done, estimate finish Sun May 11 23:53:19 2008
35.38% done, estimate finish Sun May 11 23:53:19 2008
35.41% done, estimate finish Sun May 11 23:53:18 2008
35.43% done, estimate finish Sun May 11 23:53:18 2008
35.46% done, estimate finish Sun May 11 23:53:18 2008
35.48% done, estimate finish Sun May 11 23:53:17 2008
35.51% done, estimate finish Sun May 11 23:53:17 2008
35.53% done, estimate finish Sun May 11 23:53:17 2008
35.56% done, estimate finish Sun May 11 23:53:17 2008
35.59% done, estimate finish Sun May 11 23:53:16 2008
35.61% done, estimate finish Sun May 11 23:53:16 2008
35.64% done, estimate finish Sun May 11 23:53:16 2008
35.66% done, estimate finish Sun May 11 23:53:15 2008
35.69% done, estimate finish Sun May 11 23:53:18 2008
35.71% done, estimate finish Sun May 11 23:53:18 2008
35.74% done, estimate finish Sun May 11 23:53:17 2008
35.77% done, estimate finish Sun May 11 23:53:17 2008
35.79% done, estimate finish Sun May 11 23:53:17 2008
35.82% done, estimate finish Sun May 11 23:53:17 2008
35.84% done, estimate finish Sun May 11 23:53:16 2008
35.87% done, estimate finish Sun May 11 23:53:16 2008
35.89% done, estimate finish Sun May 11 23:53:16 2008
35.92% done, estimate finish Sun May 11 23:53:15 2008
35.95% done, estimate finish Sun May 11 23:53:15 2008
35.97% done, estimate finish Sun May 11 23:53:15 2008
36.00% done, estimate finish Sun May 11 23:53:15 2008
36.02% done, estimate finish Sun May 11 23:53:14 2008
36.05% done, estimate finish Sun May 11 23:53:14 2008
36.08% done, estimate finish Sun May 11 23:53:17 2008
36.10% done, estimate finish Sun May 11 23:53:16 2008
36.13% done, estimate finish Sun May 11 23:53:16 2008
36.15% done, estimate finish Sun May 11 23:53:16 2008
36.18% done, estimate finish Sun May 11 23:53:15 2008
36.20% done, estimate finish Sun May 11 23:53:15 2008
36.23% done, estimate finish Sun May 11 23:53:15 2008
36.26% done, estimate finish Sun May 11 23:53:15 2008
36.28% done, estimate finish Sun May 11 23:53:14 2008
36.31% done, estimate finish Sun May 11 23:53:14 2008
36.33% done, estimate finish Sun May 11 23:53:14 2008
36.36% done, estimate finish Sun May 11 23:53:14 2008
36.39% done, estimate finish Sun May 11 23:53:13 2008
36.41% done, estimate finish Sun May 11 23:53:13 2008
36.44% done, estimate finish Sun May 11 23:53:13 2008
36.46% done, estimate finish Sun May 11 23:53:15 2008
36.49% done, estimate finish Sun May 11 23:53:15 2008
36.51% done, estimate finish Sun May 11 23:53:15 2008
36.54% done, estimate finish Sun May 11 23:53:14 2008
36.57% done, estimate finish Sun May 11 23:53:14 2008
36.59% done, estimate finish Sun May 11 23:53:14 2008
36.62% done, estimate finish Sun May 11 23:53:14 2008
36.64% done, estimate finish Sun May 11 23:53:13 2008
36.67% done, estimate finish Sun May 11 23:53:13 2008
36.70% done, estimate finish Sun May 11 23:53:13 2008
36.72% done, estimate finish Sun May 11 23:53:12 2008
36.75% done, estimate finish Sun May 11 23:53:12 2008
36.77% done, estimate finish Sun May 11 23:53:12 2008
36.80% done, estimate finish Sun May 11 23:53:12 2008
36.82% done, estimate finish Sun May 11 23:53:11 2008
36.85% done, estimate finish Sun May 11 23:53:14 2008
36.88% done, estimate finish Sun May 11 23:53:14 2008
36.90% done, estimate finish Sun May 11 23:53:13 2008
36.93% done, estimate finish Sun May 11 23:53:13 2008
36.95% done, estimate finish Sun May 11 23:53:13 2008
36.98% done, estimate finish Sun May 11 23:53:13 2008
37.00% done, estimate finish Sun May 11 23:53:12 2008
37.03% done, estimate finish Sun May 11 23:53:12 2008
37.06% done, estimate finish Sun May 11 23:53:12 2008
37.08% done, estimate finish Sun May 11 23:53:11 2008
37.11% done, estimate finish Sun May 11 23:53:11 2008
37.13% done, estimate finish Sun May 11 23:53:11 2008
37.16% done, estimate finish Sun May 11 23:53:11 2008
37.19% done, estimate finish Sun May 11 23:53:10 2008
37.21% done, estimate finish Sun May 11 23:53:10 2008
37.24% done, estimate finish Sun May 11 23:53:13 2008
37.26% done, estimate finish Sun May 11 23:53:12 2008
37.29% done, estimate finish Sun May 11 23:53:12 2008
37.31% done, estimate finish Sun May 11 23:53:12 2008
37.34% done, estimate finish Sun May 11 23:53:11 2008
37.37% done, estimate finish Sun May 11 23:53:11 2008
37.39% done, estimate finish Sun May 11 23:53:11 2008
37.42% done, estimate finish Sun May 11 23:53:11 2008
37.44% done, estimate finish Sun May 11 23:53:10 2008
37.47% done, estimate finish Sun May 11 23:53:10 2008
37.50% done, estimate finish Sun May 11 23:53:10 2008
37.52% done, estimate finish Sun May 11 23:53:10 2008
37.55% done, estimate finish Sun May 11 23:53:09 2008
37.57% done, estimate finish Sun May 11 23:53:09 2008
37.60% done, estimate finish Sun May 11 23:53:09 2008
37.62% done, estimate finish Sun May 11 23:53:11 2008
37.65% done, estimate finish Sun May 11 23:53:11 2008
37.68% done, estimate finish Sun May 11 23:53:11 2008
37.70% done, estimate finish Sun May 11 23:53:10 2008
37.73% done, estimate finish Sun May 11 23:53:10 2008
37.75% done, estimate finish Sun May 11 23:53:10 2008
37.78% done, estimate finish Sun May 11 23:53:10 2008
37.81% done, estimate finish Sun May 11 23:53:09 2008
37.83% done, estimate finish Sun May 11 23:53:09 2008
37.86% done, estimate finish Sun May 11 23:53:09 2008
37.88% done, estimate finish Sun May 11 23:53:09 2008
37.91% done, estimate finish Sun May 11 23:53:08 2008
37.93% done, estimate finish Sun May 11 23:53:08 2008
37.96% done, estimate finish Sun May 11 23:53:08 2008
37.99% done, estimate finish Sun May 11 23:53:08 2008
38.01% done, estimate finish Sun May 11 23:53:07 2008
38.04% done, estimate finish Sun May 11 23:53:10 2008
38.06% done, estimate finish Sun May 11 23:53:09 2008
38.09% done, estimate finish Sun May 11 23:53:09 2008
38.11% done, estimate finish Sun May 11 23:53:09 2008
38.14% done, estimate finish Sun May 11 23:53:09 2008
38.17% done, estimate finish Sun May 11 23:53:08 2008
38.19% done, estimate finish Sun May 11 23:53:08 2008
38.22% done, estimate finish Sun May 11 23:53:08 2008
38.24% done, estimate finish Sun May 11 23:53:08 2008
38.27% done, estimate finish Sun May 11 23:53:07 2008
38.30% done, estimate finish Sun May 11 23:53:07 2008
38.32% done, estimate finish Sun May 11 23:53:07 2008
38.35% done, estimate finish Sun May 11 23:53:07 2008
38.37% done, estimate finish Sun May 11 23:53:06 2008
38.40% done, estimate finish Sun May 11 23:53:06 2008
38.42% done, estimate finish Sun May 11 23:53:08 2008
38.45% done, estimate finish Sun May 11 23:53:08 2008
38.48% done, estimate finish Sun May 11 23:53:08 2008
38.50% done, estimate finish Sun May 11 23:53:08 2008
38.53% done, estimate finish Sun May 11 23:53:07 2008
38.55% done, estimate finish Sun May 11 23:53:07 2008
38.58% done, estimate finish Sun May 11 23:53:07 2008
38.60% done, estimate finish Sun May 11 23:53:07 2008
38.63% done, estimate finish Sun May 11 23:53:06 2008
38.66% done, estimate finish Sun May 11 23:53:06 2008
38.68% done, estimate finish Sun May 11 23:53:06 2008
38.71% done, estimate finish Sun May 11 23:53:06 2008
38.73% done, estimate finish Sun May 11 23:53:05 2008
38.76% done, estimate finish Sun May 11 23:53:05 2008
38.78% done, estimate finish Sun May 11 23:53:05 2008
38.81% done, estimate finish Sun May 11 23:53:07 2008
38.84% done, estimate finish Sun May 11 23:53:07 2008
38.86% done, estimate finish Sun May 11 23:53:07 2008
38.89% done, estimate finish Sun May 11 23:53:07 2008
38.91% done, estimate finish Sun May 11 23:53:06 2008
38.94% done, estimate finish Sun May 11 23:53:06 2008
38.97% done, estimate finish Sun May 11 23:53:06 2008
38.99% done, estimate finish Sun May 11 23:53:06 2008
39.02% done, estimate finish Sun May 11 23:53:05 2008
39.04% done, estimate finish Sun May 11 23:53:05 2008
39.07% done, estimate finish Sun May 11 23:53:05 2008
39.09% done, estimate finish Sun May 11 23:53:05 2008
39.12% done, estimate finish Sun May 11 23:53:04 2008
39.15% done, estimate finish Sun May 11 23:53:04 2008
39.17% done, estimate finish Sun May 11 23:53:04 2008
39.20% done, estimate finish Sun May 11 23:53:04 2008
39.22% done, estimate finish Sun May 11 23:53:06 2008
39.25% done, estimate finish Sun May 11 23:53:06 2008
39.28% done, estimate finish Sun May 11 23:53:05 2008
39.30% done, estimate finish Sun May 11 23:53:05 2008
39.33% done, estimate finish Sun May 11 23:53:05 2008
39.35% done, estimate finish Sun May 11 23:53:05 2008
39.38% done, estimate finish Sun May 11 23:53:04 2008
39.40% done, estimate finish Sun May 11 23:53:04 2008
39.43% done, estimate finish Sun May 11 23:53:04 2008
39.46% done, estimate finish Sun May 11 23:53:04 2008
39.48% done, estimate finish Sun May 11 23:53:03 2008
39.51% done, estimate finish Sun May 11 23:53:03 2008
39.53% done, estimate finish Sun May 11 23:53:03 2008
39.56% done, estimate finish Sun May 11 23:53:03 2008
39.59% done, estimate finish Sun May 11 23:53:02 2008
39.61% done, estimate finish Sun May 11 23:53:05 2008
39.64% done, estimate finish Sun May 11 23:53:04 2008
39.66% done, estimate finish Sun May 11 23:53:04 2008
39.69% done, estimate finish Sun May 11 23:53:04 2008
39.71% done, estimate finish Sun May 11 23:53:04 2008
39.74% done, estimate finish Sun May 11 23:53:03 2008
39.77% done, estimate finish Sun May 11 23:53:03 2008
39.79% done, estimate finish Sun May 11 23:53:03 2008
39.82% done, estimate finish Sun May 11 23:53:03 2008
39.84% done, estimate finish Sun May 11 23:53:02 2008
39.87% done, estimate finish Sun May 11 23:53:02 2008
39.89% done, estimate finish Sun May 11 23:53:04 2008
39.92% done, estimate finish Sun May 11 23:53:04 2008
39.95% done, estimate finish Sun May 11 23:53:04 2008
39.97% done, estimate finish Sun May 11 23:53:04 2008
40.00% done, estimate finish Sun May 11 23:53:04 2008
40.02% done, estimate finish Sun May 11 23:53:03 2008
40.05% done, estimate finish Sun May 11 23:53:03 2008
40.08% done, estimate finish Sun May 11 23:53:03 2008
40.10% done, estimate finish Sun May 11 23:53:03 2008
40.13% done, estimate finish Sun May 11 23:53:02 2008
40.15% done, estimate finish Sun May 11 23:53:02 2008
40.18% done, estimate finish Sun May 11 23:53:02 2008
40.20% done, estimate finish Sun May 11 23:53:02 2008
40.23% done, estimate finish Sun May 11 23:53:01 2008
40.26% done, estimate finish Sun May 11 23:53:01 2008
40.28% done, estimate finish Sun May 11 23:53:01 2008
40.31% done, estimate finish Sun May 11 23:53:01 2008
40.33% done, estimate finish Sun May 11 23:53:00 2008
40.36% done, estimate finish Sun May 11 23:53:00 2008
40.39% done, estimate finish Sun May 11 23:53:00 2008
40.41% done, estimate finish Sun May 11 23:53:02 2008
40.44% done, estimate finish Sun May 11 23:53:02 2008
40.46% done, estimate finish Sun May 11 23:53:02 2008
40.49% done, estimate finish Sun May 11 23:53:01 2008
40.51% done, estimate finish Sun May 11 23:53:01 2008
40.54% done, estimate finish Sun May 11 23:53:01 2008
40.57% done, estimate finish Sun May 11 23:53:01 2008
40.59% done, estimate finish Sun May 11 23:53:00 2008
40.62% done, estimate finish Sun May 11 23:53:00 2008
40.64% done, estimate finish Sun May 11 23:53:00 2008
40.67% done, estimate finish Sun May 11 23:53:00 2008
40.70% done, estimate finish Sun May 11 23:53:00 2008
40.72% done, estimate finish Sun May 11 23:52:59 2008
40.75% done, estimate finish Sun May 11 23:52:59 2008
40.77% done, estimate finish Sun May 11 23:52:59 2008
40.80% done, estimate finish Sun May 11 23:53:01 2008
40.82% done, estimate finish Sun May 11 23:53:01 2008
40.85% done, estimate finish Sun May 11 23:53:01 2008
40.88% done, estimate finish Sun May 11 23:53:00 2008
40.90% done, estimate finish Sun May 11 23:53:00 2008
40.93% done, estimate finish Sun May 11 23:53:00 2008
40.95% done, estimate finish Sun May 11 23:53:00 2008
40.98% done, estimate finish Sun May 11 23:52:59 2008
41.00% done, estimate finish Sun May 11 23:52:59 2008
41.03% done, estimate finish Sun May 11 23:52:59 2008
41.06% done, estimate finish Sun May 11 23:52:59 2008
41.08% done, estimate finish Sun May 11 23:52:58 2008
41.11% done, estimate finish Sun May 11 23:52:58 2008
41.13% done, estimate finish Sun May 11 23:52:58 2008
41.16% done, estimate finish Sun May 11 23:52:58 2008
41.19% done, estimate finish Sun May 11 23:52:58 2008
41.21% done, estimate finish Sun May 11 23:53:00 2008
41.24% done, estimate finish Sun May 11 23:53:00 2008
41.26% done, estimate finish Sun May 11 23:52:59 2008
41.29% done, estimate finish Sun May 11 23:52:59 2008
41.31% done, estimate finish Sun May 11 23:52:59 2008
41.34% done, estimate finish Sun May 11 23:52:59 2008
41.37% done, estimate finish Sun May 11 23:52:58 2008
41.39% done, estimate finish Sun May 11 23:52:58 2008
41.42% done, estimate finish Sun May 11 23:52:58 2008
41.44% done, estimate finish Sun May 11 23:52:58 2008
41.47% done, estimate finish Sun May 11 23:52:57 2008
41.50% done, estimate finish Sun May 11 23:52:57 2008
41.52% done, estimate finish Sun May 11 23:52:57 2008
41.55% done, estimate finish Sun May 11 23:52:57 2008
41.57% done, estimate finish Sun May 11 23:52:57 2008
41.60% done, estimate finish Sun May 11 23:52:59 2008
41.62% done, estimate finish Sun May 11 23:52:58 2008
41.65% done, estimate finish Sun May 11 23:52:58 2008
41.68% done, estimate finish Sun May 11 23:53:00 2008
41.70% done, estimate finish Sun May 11 23:53:03 2008
mkisofs calculate size command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -print-size -quiet -volid generic_database -volset -appid K3B THE CD KREATOR (C) 1998-2006 SEBASTIAN TRUEG AND THE K3B TEAM -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /home/mdutku/tmp/kde-mdutku/k3bQE38bb.tmp -rational-rock -hide-list /home/mdutku/tmp/kde-mdutku/k3bZa7l2b.tmp -joliet -joliet-long -hide-joliet-list /home/mdutku/tmp/kde-mdutku/k3b5y2j2a.tmp -no-cache-inodes -full-iso9660-filenames -disable-deep-relocation -iso-level 2 -path-list /home/mdutku/tmp/kde-mdutku/k3bXjbLic.tmp
mkisofs command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -volid generic_database -volset -appid K3B THE CD KREATOR (C) 1998-2006 SEBASTIAN TRUEG AND THE K3B TEAM -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /home/mdutku/tmp/kde-mdutku/k3bQyGeHa.tmp -rational-rock -hide-list /home/mdutku/tmp/kde-mdutku/k3bg7P1kb.tmp -joliet -joliet-long -hide-joliet-list /home/mdutku/tmp/kde-mdutku/k3bFAG4Ta.tmp -no-cache-inodes -full-iso9660-filenames -disable-deep-relocation -iso-level 2 -path-list /home/mdutku/tmp/kde-mdutku/k3b67jmfc.tmp