Canezila
June 18th, 2008, 05:45 PM
Hi. I searched but didnt find anyone with this issue. If there is a post about please point me in that direction...
Here is my problem:
- Schedule Direct was working about two weeks ago. I have upgraded some things and must have messed up whatever .xml file it uses.
- I have a long time left in my account so I know it should be working. When filling the mythvbase, it says I have time left also.
- Is there a default file I can erase to fix this? Any thoughts?
Thanks!
Brian
OK.... I fixed the problem by deleting my Backend info and making new. Guess I should have started with that.
Here is my problem:
- Schedule Direct was working about two weeks ago. I have upgraded some things and must have messed up whatever .xml file it uses.
- I have a long time left in my account so I know it should be working. When filling the mythvbase, it says I have time left also.
- Is there a default file I can erase to fix this? Any thoughts?
Thanks!
Brian
OK.... I fixed the problem by deleting my Backend info and making new. Guess I should have started with that.